LVT-330 · Lesson 4 of 12 · 19 min
Plenum, riser and general-purpose spaces
Lesson 3 explained the ratings; this lesson explains the spaces. A cable's rating is only right or wrong in relation to the space it runs through, and a single cable run can pass through three kinds of space on its way from a telecommunications room to a desk: a vertical shaft between floors, a ceiling that returns air to the air handlers and a wall cavity in a corridor. Each space has its own requirement, and the run must meet the strictest one it passes through unless it changes cable or enters a raceway on the way. At the Kellerman Building, Sanjay hands Maya the mechanical drawings as well as the cabling drawings on her first day of the riser retrofit. She needs both, he explains, because only the mechanical drawings show which ceilings are plenums.
Plenums
The building code defines a plenum as a chamber that forms part of an air duct system. The most common plenum in an office building is the space above a suspended ceiling when that space is used to return air to the air handling units instead of a ducted return. Air from every room on the floor is drawn up through grilles in the ceiling, travels across the ceiling space and is pulled back to the fan. Anything burning in that space puts its smoke straight into the air system, which is why the code requires FT6 cable in plenums, whatever the building's construction type.
A plenum is not always obvious from below. A ceiling with return grilles is likely a plenum; a ceiling with ducted returns probably is not; a ceiling above a corridor may be a plenum while the ceiling above the offices beside it is not. Raised floors used to supply air to computer equipment are plenums too, and so are some spaces under stages and in mechanical chases. The mechanical drawings, or the mechanical engineer, settle the question. Cobalt Line marks plenum areas on its cabling drawings in a colour wash so the crews can see them at a glance.
Fabricated ducts, the sheet-metal ducts that carry supply or exhaust air, are a different and stricter case. The codes allow wiring inside them only in very limited circumstances, and cabling installers should never run cable through or inside a duct. If a pathway seems to need it, the route is wrong.
Risers
A riser is a vertical run of cable from floor to floor, usually in a shaft or through a stack of sleeves in aligned telecommunications rooms. The Canadian codes do not have a separate riser rating as the US codes do. Instead, the vertical tray test behind FT4 measures the same tendency to carry fire upward, and in buildings required to be of noncombustible construction, exposed cables in a shaft must be FT4 or better. In combustible buildings, FT1 is the minimum for exposed cable. Every floor penetration of the shaft must also be firestopped, as lessons 8 and 9 explain, so that the shaft does not become a chimney.
General-purpose spaces
Everywhere else is general space: wall cavities, ceilings that are not plenums, cable trays in open areas and the inside of telecommunications rooms. Here the requirement depends on the construction type of the building. In buildings required to be of noncombustible construction, exposed cables with combustible jackets must be FT4 unless they are in a totally enclosed raceway, in masonry or concrete, in a service room separated by a fire separation of the required rating, or within the short length at a service entrance the code allows. In combustible construction, FT1 is the minimum.
Construction type
Whether a building is required to be of combustible or noncombustible construction is decided by the building code, from the building's occupancy, height and area. A school, a hospital and a high-rise condo are usually required to be noncombustible; a small wood-frame office may be combustible. Cobalt Line does not decide this; Sanjay gets it from the architect's code analysis, which is on the cover sheet of the architectural drawings, and writes it on the cabling drawings. The difference matters: in a noncombustible building, an FT1 cable exposed in a ceiling is a defect even when the ceiling is not a plenum.
| Space | Combustible construction | Noncombustible construction |
|---|---|---|
| Plenum | FT6 | FT6 |
| Vertical shaft, exposed | FT1 | FT4 |
| Ceiling or wall, not a plenum | FT1 | FT4 |
| Inside a totally enclosed raceway | Any certified type | Any certified type, raceway noncombustible where required |
| Within 9 m of an enclosed raceway in a plenum | FT4 allowed for those components | FT4 allowed for those components |
Raceways change the rules
Enclosing cable in a raceway changes what is exposed to fire. Cable inside a totally enclosed noncombustible raceway, such as EMT or rigid metal conduit, is not exposed, so the building code's flame-spread requirements for exposed cable do not apply to it. That is why an FT4 cable may run through a plenum inside EMT. The building code also allows short exposed lengths of FT4 cable within 9 m of such a raceway in a plenum, so a drop from the end of a conduit to a device need not be FT6. Non-metallic raceways and cable trays do not change the requirement in the same way; a cable in an open tray in a plenum must still be FT6, and the tray itself must be suitable.
The strictest space wins
A cable run is only as legal as its least suitable segment. A run from the third-floor telecommunications room at Kellerman to a desk passes through the riser for one floor, across a return-air ceiling and down a wall. The riser and the plenum both apply, so the cable must be rated for both, which in practice means a plenum rating unless the plenum section is in raceway. Crews sometimes pull a general-rated cable for a run that starts in a non-plenum ceiling, not noticing that the last ten metres cross a corridor plenum. Maya's check is to trace each run on the drawing and list every space it passes through before choosing the cable.
# Required rating for each run: the strictest space along the route sets the minimum
ORDER = ["FT1", "FT4", "FT6"] # weakest first
NEED = {"riser": "FT4", "plenum": "FT6", "wall": "FT4", "tr room": "FT4", "ceiling": "FT4", "conduit in plenum": "FT1"}
def required(spaces):
worst = 0
for sp in spaces:
worst = max(worst, ORDER.index(NEED[sp]))
return ORDER[worst]
runs = {
"3-14 desk": ["riser", "plenum", "wall"],
"3-22 meeting rm": ["tr room", "ceiling", "wall"],
"3-31 kitchen": ["tr room", "ceiling", "conduit in plenum", "wall"],
"WAP 3-05": ["tr room", "plenum"],
}
for run, spaces in runs.items():
print(f"{run:16s} {' > '.join(spaces):40s} needs {required(spaces)}")3-14 desk riser > plenum > wall needs FT6 3-22 meeting rm tr room > ceiling > wall needs FT4 3-31 kitchen tr room > ceiling > conduit in plenum > wall needs FT4 WAP 3-05 tr room > plenum needs FT6
The example assumes Kellerman, which is required to be of noncombustible construction. The conduit section in the third run needs no flame rating because the cable is enclosed there, but the rest of the run still needs FT4.
Information technology rooms
Rooms for computer equipment often have raised floors with cables underneath. Where the space under the floor is used for air supply, it is a plenum and the rules above apply. The CEC and the building code have specific provisions for some computer rooms, and data centre specifications usually go further, requiring plenum-rated or low-smoke cable throughout. Cobalt Line follows the specification and confirms the requirement with the designer whenever a raised floor appears on a drawing.
Abandoned and leftover cable
Cable left in a plenum or ceiling after it stops being used still burns. Owners and their specifications increasingly require removal of abandoned cable during renovations, and inspectors may call it out where it creates a fire load or blocks access. On the Kellerman retrofit, the specification requires every abandoned cable in the ceilings and riser to be removed, and Maya's crew pulls out more cable than they install on some floors.
Worked problem
A ceiling that changed
At St. Brendan's east wing, the mechanical design changes late: the ducted return in the second-floor corridor is deleted and the corridor ceiling becomes a return-air plenum. Cobalt Line has already pulled 64 corridor cables rated CMG FT4 and roughed in the wall drops. What must change?
Show solution
- The corridor ceiling is now a plenum, so every cable crossing it must be FT6 unless it is in an enclosed noncombustible raceway.
- The 64 cables are FT4; they do not meet the new requirement.
- Options: replace them with FT6 cable, or install EMT through the corridor and reuse FT4 cable inside it, with exposed FT4 lengths kept within the 9 m the building code allows from the raceway.
- Sanjay compares the cost: replacing the cable is cheaper and faster than adding conduit above an occupied hospital corridor.
Answer: The cables are replaced with plenum-rated cable under a change order, and the drawings are updated so the inspector sees a plenum zone that matches the mechanical drawings.
Spaces that are easy to miss
Some spaces catch even experienced crews. The space above a ceiling in an exit stair is part of the stair enclosure, and cables not serving the stair should not pass through it at all. Corridors in hospitals and schools may be smoke compartments or rated corridors, and the ceiling above them may be a plenum even when the rooms beside it are ducted. Elevator machine rooms and electrical rooms are service rooms with their own rules. Mechanical penthouses may contain air plenums formed by the building structure. Underfloor spaces in older buildings may connect to the air system through forgotten openings. Each needs the drawings or the engineer to confirm what it is.
Renovations add another trap: a ceiling's use can change while the cable stays. When an owner converts a ducted ceiling to a return-air plenum to save on ductwork, all the existing cable in that ceiling may suddenly be below the required rating. The mechanical engineer should tell the owner, and Cobalt Line's service contracts ask the owner to notify the company of mechanical changes, but in practice the closeout crew finds such changes during routine work. When they do, Maya reports the condition to the owner in writing with photos, because cable that met the code when installed may now need replacing or enclosing.
Kellerman has both problems. Its twelfth floor was converted to a plenum return during a mechanical upgrade in 2019, and the old tenant cabling above it was never replaced. Removing it as abandoned cable solves the problem there, and the new cabling is plenum-rated throughout.
The safest approach on any job with mixed ceilings is the one many owners now choose: specify plenum-rated cable everywhere above ceilings, so that later changes in mechanical design or use cannot leave cable under-rated. The extra cost of plenum cable over riser cable is small compared with the cost of replacing cable in an occupied building.
Showing the spaces on the drawings
The simplest way to avoid rating mistakes is to make the spaces visible to everyone. Sanjay's cabling drawings for every Cobalt Line job carry a ceiling space plan: plenum zones washed in one colour, rated walls drawn heavy, riser shafts outlined and the required cable rating written in each zone. The plan is printed for each crew lead and posted in the site office. When the mechanical design changes, the plan is revised and reissued with the change clouded, so that nobody pulls cable to an old version. Inspectors appreciate it too; Lorraine Dufour, the inspector on Kellerman, asks for a copy at the first rough-in so she can check legends zone by zone.
Common mistakes
MistakeDeciding whether a ceiling is a plenum by looking up.
InsteadCheck the mechanical drawings or ask the mechanical engineer.
MistakeChoosing the cable for the space at the start of the run.
InsteadTrace the whole run; the strictest space it passes through sets the rating.
MistakePutting lower-rated cable in an open tray in a plenum.
InsteadTrays do not enclose cable; only suitable raceway changes the requirement.
MistakeRunning cable through a fabricated air duct.
InsteadNever; reroute the pathway.
MistakeLeaving old cable in the ceiling during a renovation.
InsteadRemove abandoned cable as the code and specification require, and tag cable kept for future use.
Summary and key terms
- Plenums are air-handling spaces; cables there must be FT6 unless enclosed in noncombustible raceway.
- Risers have no separate Canadian rating; FT4 applies to exposed cable in noncombustible buildings.
- In general spaces the construction type decides: FT4 in noncombustible buildings, FT1 in combustible ones.
- Suitable raceway can change the requirement; open trays do not.
- Trace every run: the strictest space it passes through decides the rating.
- Abandoned cable adds fire load and must be removed where the code or specification requires.
- Plenum
- A chamber forming part of an air duct system, such as a return-air ceiling.
- Riser
- A vertical run of cable from floor to floor.
- Noncombustible construction
- A building the building code requires to be built of noncombustible materials.
- Totally enclosed raceway
- A raceway such as EMT that encloses cable completely.
- Abandoned cable
- Installed cable that is no longer used and not tagged for future use.
Practice problems
Work each problem on paper first, then reveal the answer to check.
Where must FT6 cable be used?
Show answer
In plenums, in any construction type, unless the cable is in enclosed noncombustible raceway.
Exposed cable in a ceiling of a noncombustible building that is not a plenum: minimum rating?
Show answer
FT4.
Can FT4 cable cross a plenum inside EMT?
Show answer
Yes, because the cable is enclosed.
Who decides whether a building is required to be noncombustible?
Show answer
The building code, through the architect's code analysis.
Lesson quiz · 5 questions
Score 60% or more to complete this lesson.
Create a free account to save your progress, take quizzes and earn a certificate.