FAT-210 · Lesson 7 of 12 · 19 min
Single-stage and two-stage systems
Eastview General Hospital doesn't evacuate when its fire alarm operates. Patients in intensive care, operating rooms and the birthing unit can't simply walk out, so the hospital's fire safety plan relies on staff moving patients horizontally away from the fire, behind fire separations, while the rest of the building stays put. The fire alarm is designed to support that plan, and it starts in a different way from the alarm in an office tower. Sasha spends a week at Eastview with Gerry and the hospital's own facilities team. 'In most buildings, any alarm means everybody leaves,' the facilities manager tells her. 'Here, the first signal tells staff to act. The second one, if it comes, is the one that says the building is in real trouble.' This lesson covers single-stage and staged systems, the timers and controls that make them work, and how the panel is programmed for each.
Single-stage systems
In a single-stage system, any alarm signal, from a detector, a pull station or a waterflow switch, operates the evacuation signal throughout the building at once. Everyone hears the same temporal-three signal and everyone leaves. Single-stage systems are simple, easy to understand and easy to test, and they are the normal arrangement for offices, schools, warehouses and apartment buildings of moderate height. Tamarind House, Willowbank School and Cartwright Distribution Centre all use single-stage systems. The panel's programming is straightforward: every alarm input operates every notification circuit, plus the building's control functions.
Two-stage systems in Canada
A two-stage system splits the response into an alert stage and an alarm stage. When any manual station, waterflow switch or detector operates, the system sounds an alert signal, a distinctive pattern that tells trained staff to investigate but doesn't call for evacuation. The National Building Code, in Sentence 3.2.4.4.(2), requires that if the alert signal is not acknowledged within 5 minutes of its start, the alarm signal sounds automatically; the code allows exceptions for certain care and treatment occupancies whose fire safety plans rely on staff being present. Staff acknowledge the alert at the panel or an annunciator, which stops the automatic transfer, then investigate. If they find a fire, or if a second-stage control is operated, the alarm signal sounds and the building's evacuation or relocation plan begins.
The second stage can be started in several ways, and each is programmed in the panel. Two-stage manual stations have a key switch or a separate second-stage action that staff use to go straight to alarm. The panel and the main annunciator have a general alarm control. Some designs send certain devices, such as a waterflow switch in an area without staff, directly to alarm, where the authority accepts it. At Eastview the general alarm keys are carried by the charge nurse on each unit and by security.
# Two-stage sequence: alert, acknowledge, alarm (times in seconds from the first signal)
ACK_LIMIT = 300 # alert must be acknowledged within 5 minutes or the alarm sounds
def run(events):
stage, acked_at, log = "alert", None, ["0 s: device operates -> ALERT signal on all floors"]
for t, what in events:
if stage == "alarm":
break
if what == "acknowledge" and t <= ACK_LIMIT:
acked_at = t
log.append(f"{t} s: staff acknowledge at the panel -> automatic transfer stopped")
elif what in ("second stage key", "panel general alarm"):
stage = "alarm"
log.append(f"{t} s: {what} -> ALARM signal (evacuate)")
if stage == "alert" and acked_at is None:
log.append(f"{ACK_LIMIT} s: not acknowledged -> ALARM signal sounds automatically")
return log
for name, ev in [("Acknowledged, then escalated", [(95, "acknowledge"), (410, "second stage key")]),
("Never acknowledged", []),
("Acknowledged, false alarm", [(60, "acknowledge")])]:
print(name)
for line in run(ev):
print(" ", line)Acknowledged, then escalated 0 s: device operates -> ALERT signal on all floors 95 s: staff acknowledge at the panel -> automatic transfer stopped 410 s: second stage key -> ALARM signal (evacuate) Never acknowledged 0 s: device operates -> ALERT signal on all floors 300 s: not acknowledged -> ALARM signal sounds automatically Acknowledged, false alarm 0 s: device operates -> ALERT signal on all floors 60 s: staff acknowledge at the panel -> automatic transfer stopped
The three runs show the possible paths. When staff acknowledge and later find a reason to escalate, the alarm sounds when they turn the key. When nobody acknowledges, the panel sounds the alarm by itself at five minutes. When staff acknowledge and find a harmless cause, the alert continues until they reset the system, and no alarm sounds.
Zones, floors and staged evacuation
Staging can also be about where, not just when. In a high-rise building such as Riverlight Tower, the evacuation strategy may sound the alarm on the fire floor, the floor above and the floor below first, and an alert or a different message on the other floors, so the stairs aren't overwhelmed and firefighters can work. This kind of staging is usually done with voice communication, which FAT-310 covers, but it relies on the same panel features: notification circuits divided by floor, programming that knows which floor each device is on, and controls for firefighters to extend the alarm to more floors or the whole building.
Whatever the staging, the panel's programming must handle the case where devices on more than one floor operate. A fire that spreads up a shaft, or smoke that travels through a corridor, can put detectors on several floors into alarm. The sequence of operations must say clearly what happens then, usually extending the alarm to every affected floor and the floors around them, and the acceptance test must include it.
Alarm verification versus staging
Two-stage systems and positive alarm sequence are sometimes confused with alarm verification, but they solve different problems. Alarm verification, described in FAT-120, is an automatic check on a single smoke detector: the panel resets the detector and confirms the signal before acting, which filters out momentary nuisance signals. It involves no people. Staging, in contrast, is about who hears the first signal and when people are called to act. A building can use both: verification on the smoke detectors to filter brief nuisance signals, and a staged response for confirmed signals. The programming must make sure the total delay before an alarm is within what the code allows, and verification is never applied to manual stations or waterflow switches.
| Feature | Who acts | Main purpose | Applies to |
|---|---|---|---|
| Alarm verification | Nobody; the panel | Filter brief smoke detector signals | Smoke detectors only |
| Two-stage alert and alarm | Trained staff | Investigate before evacuating | All initiating devices start the alert |
| Floor-by-floor staging | Panel and firefighters | Control who moves first in tall buildings | Notification by floor or zone |
| Cross-zoning | Nobody; the panel | Confirm before releasing suppression | Releasing systems |
Controls, keys and records
Staged systems depend on people doing the right thing at the right time, so the controls must be clear and the records complete. Acknowledge, general alarm and silence controls are labelled at the panel and every annunciator. Keys for second-stage stations are kept where the fire safety plan says, and the plan lists who is trained to use them. The panel's event history records each signal, each acknowledgement and each escalation with the time, so that after any event the hospital can see how long staff took to respond. Eastview's fire safety committee reviews these records after every alarm, and slow acknowledgements are followed up with training.
Because a two-stage system depends on staff, the fire safety plan and the authority having jurisdiction must approve it, and the fire department must know how it works. Captain Helen Strand reviews Eastview's sequence each year with the hospital, and any change to the timing or the second-stage controls goes through her office before it is programmed.
Programming and testing a staged system
In the panel, a staged response is built from timers, logic and output groups. The program defines which inputs start the first stage, which outputs the first stage operates, the timer that escalates automatically, the inputs and controls that escalate immediately, and what the second stage operates. It also defines what acknowledge does, whether it can be done from annunciators as well as the panel, and how the system returns to normal. Testing covers every path: the automatic escalation with no acknowledgement, the acknowledged and investigated path, immediate escalation from each second-stage control, and the case of a second device operating during the first stage. Each path is timed with a stopwatch and recorded.
Worked problem
An alert that turned into an alarm
At Eastview, a smoke detector in a fourth-floor storage room starts the alert stage at 02:14. The panel records acknowledge at 02:21, and the alarm signal sounded at 02:19. The night staff say they acknowledged as soon as they reached the panel. What happened?
Show solution
- The alarm sounded 5 minutes after the alert began, which is the automatic transfer working as designed.
- Acknowledgement came at 7 minutes, too late to stop the transfer.
- The delay was in reaching the panel: the night staff were on the far side of the floor and the nearest place to acknowledge was the main panel on the ground floor.
- The fix is to make acknowledgement possible at an annunciator on the floor, if the design and the authority allow it, and to review the night staffing.
Answer: The system worked exactly as programmed; the people's route to the control was the problem. Ravi designs an annunciator change for the nursing station, the authority approves it, and Sasha tests the new acknowledge control with a stopwatch before it goes into service.
Training and drills for staged systems
A staged system is only as good as the people who answer it. Staff on every shift need to know what the first signal sounds like, where the nearest acknowledge control is, who investigates, what they look for, how to escalate, and what to do if they find a fire. The fire safety plan sets this out, and fire drills, held at the frequency the fire code requires, test it with real people and a stopwatch. At Eastview, drills are run on every unit and every shift through the year, and the panel's event history from each drill is printed and reviewed with the unit's staff, so a slow acknowledgement becomes a lesson rather than a surprise.
Drills also test the system's programming in a way an acceptance test can't, because they show how the staging behaves in a building full of people. Staff sometimes find that an acknowledge control is behind a locked door at night, that the alert signal can't be heard in a noisy area, or that the escalation key is kept somewhere nobody can reach in time. Each finding goes back to the designer and the authority, because fixing it may mean a programming change, a new annunciator or a change to the plan. Bramwell's technicians attend Eastview's large drills so they can see these problems first-hand.
When a staged response is not allowed
Staging is never used to delay the response to a fire someone has already seen. That is why manual stations and waterflow switches start the alert immediately and why the code's automatic transfer exists: the alert stage can last only as long as trained staff are actively responding. Buildings without staff present at all hours, or whose fire safety plans can't support an investigation, use single-stage systems. Where a building's use changes, for example when a hospital wing becomes offices, the design must be reviewed, because a two-stage system may no longer be appropriate.
Finally, any staged sequence is written so that the fire department can always override it. Arriving firefighters may want the whole building evacuated at once, whatever the first stage was doing, so the general alarm control at the main annunciator works at any time, in any stage, with one action. The test plan includes pressing it in the middle of each stage to prove it.
Common mistakes
MistakeTreating a staged first signal as a supervisory signal.
InsteadThe first stage is an alarm signal that starts a staged response.
MistakeAdding staging without the authority's approval.
InsteadStaged responses must be approved and in the fire safety plan.
MistakeApplying verification or staging delays to manual stations.
InsteadManual stations act at once as the code requires.
MistakeTesting only the normal path.
InsteadTest every path, including no acknowledgement and second devices.
MistakeLeaving staff without a nearby way to acknowledge.
InsteadPut acknowledge controls where staff can reach them in time.
Summary and key terms
- Single-stage systems sound the evacuation signal everywhere on any alarm.
- Two-stage systems sound an alert first; NBC 3.2.4.4 requires the alarm to follow automatically if the alert isn't acknowledged within 5 minutes.
- Second-stage keys, panel controls and approved devices sound the alarm at once.
- Floor-by-floor staging in tall buildings uses divided notification and firefighter controls.
- Alarm verification filters single detector signals; staging decides who acts first.
- Every staged path is programmed with timers and logic and tested with a stopwatch.
- Single-stage system
- A system in which any alarm sounds the evacuation signal throughout the building.
- Alert signal
- The first-stage signal of a two-stage system, telling staff to investigate.
- Acknowledge
- An action that tells the panel staff have seen the signal; in staged systems it stops an automatic escalation.
- Automatic transfer
- The panel moving from the first stage to the general alarm when a timer runs out.
- Staged evacuation
- Moving people floor by floor rather than all at once.
- Fire safety plan
- The building's approved plan for what staff and occupants do in a fire.
Practice problems
Work each problem on paper first, then reveal the answer to check.
An alert starts at 10:00:00 and isn't acknowledged. When does the alarm sound?
Show answer
At 10:05:00.
Staff acknowledge at 10:03 and find burnt toast. Does the alarm sound?
Show answer
No, unless someone escalates; they reset the system.
Which code sentence sets the two-stage acknowledge time?
Show answer
NBC Sentence 3.2.4.4.(2).
How does a two-stage station go straight to alarm?
Show answer
With its second-stage key or action.
Lesson quiz · 5 questions
Score 60% or more to complete this lesson.
Create a free account to save your progress, take quizzes and earn a certificate.