Lena Castillo has worked in the electrical trade in Wichita for ten years. She started in 2016 as a helper for a residential shop on the west side, spent a year in a trade school program while she kept working, and in 2021 passed an approved journeyman exam and earned her journeyman certificate from the Metropolitan Area Building and Construction Department, the joint Wichita and Sedgwick County agency everyone in the trade calls MABCD. For the last four years she has run crews for Little River Electric, LLC, a fourteen-person contractor in south Wichita. The company is invented for this course, but the questions it faces are real. Its owner, Gene Hartwig, has held an MABCD master certificate since 1998 and is the qualified person behind the company's electrical trade contractor license. Gene is sixty-four and wants to cut back. He has asked Lena to earn a master credential that the company can rely on in Wichita and in the other Kansas cities where it now takes work, and this course follows her from her first question to exam day.

This is the Kansas course in the HSM University master electrician exam prep series. The core courses, MELU-101 through MELU-107, teach the National Electrical Code skills that every master-level exam tests: navigating the code, load calculations, conductors and overcurrent protection, grounding and bonding, motors and transformers, special occupancies, and business and law. This course adds what is specific to Kansas, and Kansas is unusual among its neighbors. It has no statewide electrician license at all. Cities and counties decide whether to license electricians, and a state statute, K.S.A. 12-1525 and the sections after it, sets ground rules for those that do.

Two cautions apply to every lesson. First, licensing rules change, and local rules change with little notice. The facts in this course were checked in November 2026 against the Kansas statutes, MABCD's certificate and contractor licensing pages, the Johnson County Contractor Licensing pages, the posted contractor requirements of the Unified Government of Wyandotte County and Kansas City, Kansas, the Topeka Municipal Code and the Kansas Department of Labor, and the lessons say so when a fact comes from an older or secondary source or could not be confirmed. Before you apply, pay a fee or book an exam, check the current pages yourself. Second, electrical codes are copyrighted. This course cites code articles and sections by number and explains them in plain words, but it never reproduces their text, tables or figures. Keep your own copy of the code your exam uses open beside you.

A state with no statewide license

In most states a single state board licenses electricians, and a license earned in one city is good across the state. Kansas never created such a board. There is no state agency that examines electricians, issues a Kansas master electrician license or keeps a statewide roster of electrical contractors. Instead, the power to regulate the trade sits with local governments. Kansas cities have broad home rule powers under the state constitution, and counties have home rule powers granted by statute, so each can decide whether to license electricians, register electrical contractors, adopt an electrical code, require permits and inspect.

The result is a map with a few large licensing systems and many small ones. In the Wichita area, MABCD certifies journeymen and masters and licenses trade contractors for the City of Wichita, unincorporated Sedgwick County and several small cities that rely on it. In the Kansas City area, Johnson County runs a contractor licensing program that many of its cities use, while the Unified Government of Wyandotte County and Kansas City, Kansas, runs its own. Topeka licenses electricians under its municipal code. Lawrence, Manhattan, Salina, Hutchinson and other cities have their own rules, and many rural counties and small towns license no one at all.

Diagram showing that Kansas has no statewide electrician license; the state sets ground rules in K.S.A. 12-1525 and following sections, and below it MABCD for Wichita and Sedgwick County, Johnson County Contractor Licensing, the Unified Government in Kansas City, Kansas, Topeka and other cities each license, issue permits and inspect.
Who licenses electrical work in Kansas: no state license, a state framework, and local licensing authorities.

What the state statute does

Kansas did not leave local licensing entirely unregulated. Contractors who worked across city lines once faced a different test in nearly every city, and none of the cities accepted the others' results. The Legislature answered with a law now found at K.S.A. 12-1525 and the sections after it. The most important part for an exam candidate is K.S.A. 12-1526. It does not require any city or county to license electricians. What it does is set rules for the localities that choose to.

First, the statute ties local licensing to standardized examinations. A locality that licenses electricians may give or designate examinations, and the passing score is 75. Second, it sets minimum experience levels. A journeyman or residential electrician needs two years of field experience, of which no more than one year may come from schooling, and the schooling must be a program of at least 930 hours. A master needs two years of experience holding a journeyman certificate. Third, it makes the credential portable: a certificate of competency earned by passing a designated examination, together with the experience requirements, is valid in any Kansas locality that requires a license, without retesting, for a uniform fee. Fourth, it sets continuing education rules. Fifth, a license must show the testing agency and the name of the test the holder passed, so that another locality can see what was tested.

The statute also protected people who already held licenses when it took effect. Those licensed before July 1, 1989 with a passing score of at least 70 were grandfathered. That rarely matters for a new candidate, but it explains why an older license can show a lower score than a new one would need.

The state framework and the local authority compared, summarized from K.S.A. 12-1526 and local pages.
QuestionState law (K.S.A. 12-1526)Local licensing authority
Does it issue a license?NoYes, where the locality chooses to license
Does it set the passing score?Yes: 75 on a designated examDesignates which exams it accepts
Does it set experience minimums?Yes, for journeyman, residential and masterApplies them and checks the proof
Does it set continuing education?Yes, hours and a code shareApproves courses and tracks hours
Does it issue permits or inspect?NoYes

Individuals and companies

Most Kansas systems separate the person from the business. MABCD issues journeyman and master certificates to individuals and a separate trade contractor license to the company, and the company's license must name a qualified person who holds a master certificate. Johnson County licenses contractors by class, with a standard master electrician class that requires a passing score on an approved master exam. The Unified Government in Kansas City, Kansas, allows one master per trade for each contractor and requires a certificate of qualification approved by its chief building inspector. Topeka licenses master and journeyman electricians and expects the master to oversee the work. Lessons 2, 7 and 8 work through these structures.

The split matters for Little River Electric. The company holds an MABCD trade contractor license because Gene, its qualified person, holds a master certificate. If Gene retired tomorrow, the company would need another master to take his place before it could renew or, in most systems, keep pulling permits. That is the gap Lena is training to fill.

What stays with each job

Whatever credential a contractor holds, the job itself is regulated where it sits. The city or county where the work is done decides whether a permit is needed, which edition of the National Electrical Code applies and with what amendments, who inspects, and whether the contractor must hold a local license, register, file an insurance certificate or post a bond. Kansas has no statewide adoption of the National Electrical Code for private buildings, so editions differ from place to place. Lesson 5 covers code adoption and Lesson 6 permits and inspections.

Lena has seen this in practice. Last spring Little River wired a dental office in Wichita, a warehouse tenant finish in Lenexa and a small retail space in Kansas City, Kansas, in the same month. Each job had a different permit office, a different inspector and a different list of paperwork. The Wichita job ran on Gene's MABCD license; the Lenexa job required the company to be licensed through Johnson County; the Kansas City, Kansas job needed the Unified Government's own registration. The company's office manager, Pat Ochs, keeps a binder with a tab for every jurisdiction the company works in, listing its permit portal, code edition, inspection request line and any license, insurance certificate or bond the company has on file.

The licensing authorities in this course

The course concentrates on five authorities. The first is MABCD, which covers Wichita, unincorporated Sedgwick County and small cities in its area and is the system Lena knows best. The second is Johnson County Contractor Licensing in Olathe, which serves participating Johnson County cities. The third is the Unified Government of Wyandotte County and Kansas City, Kansas. The fourth is the City of Topeka. The fifth is the state itself, which sets the licensing framework in K.S.A. 12-1526, the mechanics' lien rules in K.S.A. 60-1101 and the sections after it, and the workers compensation rules in chapter 44, and which leaves workplace safety for private employers to federal OSHA. Lawrence and other cities appear as examples of how the rest of the state works.

Throughout, the course separates verified facts from general descriptions. The state statutes, MABCD's pages, Johnson County's exam page and the Topeka Municipal Code were read directly. The Unified Government's posted contractor requirements are dated 2011, so the course treats its amounts as examples to confirm. A few details, such as some cities' continuing education hours, come from secondary sources, and the lessons say so.

The exam picture

Because there is no state exam, Kansas candidates take national examinations that local authorities have designated. MABCD lists approved master exams by their codes: the International Code Council's master electrician exams 554 and KGD, and the F16, G16 and T16 exams from other testing companies, with a passing score of 75. Johnson County's standard master electrician class uses ICC exam 554, known as KGD, delivered through Pearson VUE. The Unified Government's older requirements name Block, Experior and Prometric exams with a score of 75. Lessons 3 and 4 cover booking and the exam format.

Because K.S.A. 12-1526 makes a passing score on a designated exam portable, the choice of exam matters. A candidate who picks an exam that several Kansas authorities designate can carry the result from one to the next, subject to each authority's experience check and fee. Lena plans to take an exam that both MABCD and Johnson County list, so the company can qualify in both places with one test.

Enforcement

Licensing would mean little without enforcement, and in Kansas nearly all of it is local. Cities and counties enforce mainly through the permit process: no qualifying license, no permit; no permit, no legal work. Inspectors can reject work, post stop-work orders and refer violations for prosecution under local ordinances, and licensing boards or departments can suspend or revoke a local certificate or contractor license. The exam is more likely to ask who has which power than to ask for a fine amount, and fine amounts change. Check the current ordinance before relying on a number.

For a master or qualified person, enforcement is personal. Under MABCD, Johnson County, the Unified Government and Topeka alike, the licensed master is the person accountable for the electrical work the company does. Gene has told Lena that the best protection is dull paperwork: a current certificate and contractor license, insurance certificates on file, permits pulled before work starts, inspections called on time, electricians and apprentices on the payroll as employees, and a file for every job. Lesson 7 returns to these habits.

How this course is organized

The lessons follow Lena's path. Lesson 2 covers eligibility for local master credentials, Lesson 3 the application and booking process, and Lesson 4 the exam format and references. Lesson 5 explains local code adoption and Lesson 6 permits and inspections. Lesson 7 covers the duties of the master, Lesson 8 contractor licensing, insurance and bonding, and Lesson 9 contracts and mechanics' liens. Lesson 10 covers safety law, OSHA and workers compensation, Lesson 11 renewal and working in other jurisdictions, and Lesson 12 a practice review and test-day strategy. Every lesson ends with a quiz that mixes multiple choice, true or false, number, ordering and matching questions, and the course ends with a final exam.

The calculator below shows the first planning Lena did. Gene wants to cut back in about eighteen months. Lena needs time to gather proof of her journeyman years, choose and book an exam, study, sit it, possibly retake it, apply for the master certificate and let the company change its qualified person. Change the numbers to fit your own plan.

# Lena's planning check (illustrative months)
months_until_gene_cuts_back = 18
steps = {
    "gather proof of journeyman experience": 1,
    "study for the master exam": 4,
    "book and sit the exam": 1,
    "retake allowance, if needed": 2,
    "apply for the MABCD master certificate": 1,
    "company names Lena as qualified person": 1,
}
needed = sum(steps.values())
for step, months in steps.items():
    print(f"{step}: {months} months")
print(f"Total: {needed} months; margin: {months_until_gene_cuts_back - needed} months")
Output
gather proof of journeyman experience: 1 months
study for the master exam: 4 months
book and sit the exam: 1 months
retake allowance, if needed: 2 months
apply for the MABCD master certificate: 1 months
company names Lena as qualified person: 1 months
Total: 10 months; margin: 8 months

Common mistakes

  • MistakeAssuming Kansas issues a state master electrician license.

    InsteadKansas has no statewide electrician license; cities and counties license under the K.S.A. 12-1526 framework.

  • MistakeThinking the state statute forces every city to license electricians.

    InsteadK.S.A. 12-1526 sets rules for localities that choose to license; many do not.

  • MistakeTreating a local master certificate as a company license.

    InsteadMost systems license the person and the business separately, and the business names a qualified master.

  • MistakeBelieving every locality must accept any exam the candidate likes.

    InsteadLocalities designate the exams they accept; the portable credential rests on a designated exam passed with 75.

  • MistakeAssuming the whole state uses one NEC edition.

    InsteadKansas has no statewide NEC adoption for private buildings; each locality adopts its own.

Summary and key terms

  • Kansas has no statewide electrician license; cities and counties decide whether to license.
  • K.S.A. 12-1526 sets the passing score of 75, experience minimums, continuing education and portability for localities that license.
  • A certificate of competency on a designated exam, with the required experience, is valid in other licensing localities without retesting, for a uniform fee.
  • MABCD, Johnson County, the Unified Government in Kansas City, Kansas, and Topeka run the largest systems in this course.
  • Most systems license the person and the company separately; the company names a qualified master.
  • Check current statutes, ordinances and local pages before relying on any detail.
MABCD
The Metropolitan Area Building and Construction Department, the joint agency of Wichita and Sedgwick County.
K.S.A. 12-1526
The Kansas statute that sets ground rules for local electrical, plumbing and mechanical licensing.
Certificate of competency
A credential earned by passing a designated examination, portable among Kansas licensing localities.
Qualified person
The master whose certificate supports a company's trade contractor license.
Home rule
The power of Kansas cities and counties to govern local affairs, including licensing, by ordinance or resolution.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. Does Little River need a local license to wire a barn in a rural county that licenses no one?

    Show answer

    Not a local electrical license if none is required, though permits, other local rules and the code may still apply.

  2. Who issues Lena's master certificate if she qualifies in Wichita?

    Show answer

    MABCD; the State of Kansas issues no electrician license.

  3. What passing score does K.S.A. 12-1526 set for designated exams?

    Show answer

    75.

  4. Can a licensing city demand that a holder of a portable certificate of competency retest?

    Show answer

    The statute says the certificate, with the required experience, is valid without retesting for a uniform fee; confirm how the city applies it.

  5. Who issues the permit for the Lenexa warehouse job?

    Show answer

    The City of Lenexa, where the work sits; contractor licensing runs through Johnson County's program for participating cities.

Lesson quiz · 5 questions