ROOF-120 · Lesson 11 of 12 · 26 min

Roofing in the National Building Code

▶ Video coming soon A video version of this lesson is on the way.

A week of steady rain in October kept the crews off the roofs, so Anjali Mukherjee booked the shop for two mornings of code training. She put a thick binder on the table in front of Rory. It was the Ontario Building Code, with yellow tabs sticking out of Part 9. "Nobody memorizes this," she said. "But every roofer needs to know how it's put together, where roofing lives in it, and what it actually asks of us. Then you know when to look something up, and you can talk to an inspector without guessing."

Building codes set the minimum legal requirements for how buildings are designed and built, including their roofs. Codes are written to protect health and safety, keep buildings standing and dry, limit fire spread and save energy. This lesson explains where the codes that govern roofing come from, how they are adopted into law, how they are organized, and what they require of roofs, in plain language. It does not reproduce code text: the adopted code itself, read alongside the manufacturer's instructions, is always the authority.

Model codes and adopted codes

In Canada, building regulation is a provincial responsibility. The national codes are model codes, developed by the Canadian Commission on Building and Fire Codes with technical support from the National Research Council. The National Building Code of Canada (NBC) is updated on a regular cycle; the 2020 edition is the current base for most provinces. A model code has no legal force until a province adopts it, sometimes with changes. In Ontario, the Building Code Act gives the province the power to make the Ontario Building Code (OBC), a regulation under that Act. The current code, often called the 2024 OBC, is Ontario Regulation 163/24. It took effect on January 1, 2025, and is based closely on the 2020 NBC, with Ontario changes. Projects permitted under the earlier code could continue under it for a transition period.

The OBC is enforced by the local municipality. In Hamilton, the City's building division reviews permit applications, issues permits and sends inspectors. The chief building official in each municipality has the authority to interpret the code there. Other laws also touch roofing work: the Fire Code (kettles and torches), the Occupational Health and Safety Act and its construction regulation (O. Reg. 213/91, covered in ROOF-110), and municipal by-laws.

A chain of five boxes: the National Building Code, a model code; the Ontario Building Code, the law in Ontario under O. Reg. 163/24; referenced standards such as CSA A123, CAN/ULC and CGSB product standards; the manufacturer's installation instructions; and the permit, plans and inspection by the municipality. A note says small buildings follow OBC Part 9, with roofing in 9.26, and larger buildings follow Part 3, Part 4 loads and Part 5 envelope.
From the model code to the roof in Ontario.

How the code is organized

The NBC and the OBC share the same three-division layout:

The structure of the National and Ontario building codes.
DivisionWhat it covers
Division Acompliance, the objectives the code is meant to achieve, and definitions
Division Bthe technical requirements, in Parts: Part 3 fire protection, Part 4 structural design, Part 5 environmental separation, Part 9 housing and small buildings, and others
Division Cadministration: permits, inspections, and the qualifications of designers and officials

Part 9 applies to houses and small buildings: in general, buildings of three storeys or less with a building area of 600 m² or less, in residential, business, mercantile and light industrial uses. Most of Ridgecap's steep-slope work, including every Linden Street house, falls under Part 9, where the roofing rules are in Section 9.26 and the rules for attic and roof space ventilation are in Section 9.19. Larger buildings such as Ashgrove Plaza, the warehouse and Northgate are designed under Parts 3, 4 and 5 by architects and engineers. For those, Part 3 sets the fire classification of the roof covering, Part 4 sets the snow, rain and wind loads, and Part 5 covers the roof as a barrier to water, air, vapour and heat, including wind uplift of membrane roofs.

The code is objective-based. It sets out what each requirement is trying to achieve and offers acceptable solutions, the detailed rules most buildings follow. A designer may propose an alternative solution instead, but must show the building official that it performs at least as well. Roofers follow the code and the approved drawings; alternatives are a decision for the designer and the building official, not for the crew on the roof.

What the code asks of roofs

Part 9's roofing section starts with the purpose of roofing in your own words: the roof covering and flashings must shed water, keep water and moisture out of the building assemblies and the occupied space, and reduce ice damming. The rest of the section explains how. In outline, it covers:

  • Roofing materials: they must meet the referenced standards, and listed materials must be installed following the manufacturer's written instructions.
  • Slopes: minimum (and some maximum) slopes for each type of covering, as described in lesson 2.
  • Flashing: at the intersections of roofs with walls, chimneys and other roofs, and at valleys.
  • Eave protection: where it is required, how far up the roof it must go, and which materials qualify, as covered in lesson 4.
  • Underlay: which materials are acceptable if underlay is used beneath shingles. Part 9 does not make full underlay mandatory under asphalt shingles on normal slopes, but nearly every shingle manufacturer requires it for the warranty, and Ridgecap installs it on every roof.
  • Each type of covering: separate rules for asphalt shingles on normal and low slopes, wood shingles, cedar shakes, built-up roofs, selvage roofing, sheet metal roofing, glass reinforced polyester panels, hot-applied rubberized asphalt, PVC sheet roofing and concrete tiles.
  • Roof drains and downspouts: where water must be carried and how it must be kept away from the building.

Ventilation of attics and roof spaces sits in a separate section from the coverings, and so do the energy rules for insulation and air barriers. A roofer working on a house needs all three.

Reroofing

Part 9 says little directly about installing new roofing over old. In practice, the shingle manufacturer's instructions control: most allow one new layer over one existing layer of asphalt shingles only if the old roof is flat, dry and sound, and some do not allow it at all for their best warranties. The roof structure must also be able to carry the extra weight. Ridgecap's policy is to tear off to the deck on every re-roof, so the deck can be inspected, eave protection and underlay installed properly, and ventilation checked. Whether a permit is needed depends on the work: in many Ontario municipalities, including Hamilton, replacing shingles with similar shingles does not need a permit, but structural repairs, new or replaced decking in some cases, changes to the roof shape and many commercial re-roofs do. Always check with the building department before the job.

Standards: the code's long arm

The code does not describe every material in detail. Instead, it references standards: documents written by standards organizations that set out what a product must be and how it must be tested. When the code says a material must conform to a standard, that standard becomes part of the legal requirement. In roofing, the referenced standards include:

Standards commonly referenced for roofing in Canada.
ProductStandards commonly referenced
Asphalt shinglesCSA A123.5 (glass mat)
Roll roofing and feltsCSA A123.2, CSA A123.3 and related CSA A123 standards
Bitumen for built-up roofsCSA A123.4
Eave protection membranesCSA A123.22 (self-adhering, for ice-dam protection)
Modified bitumen sheetsCSA A123.23
Membrane wind upliftCSA A123.21 (dynamic testing of membrane roof assemblies)
Fire tests of roof coveringsCAN/ULC-S107
InsulationCAN/ULC-S701 (polystyrene), CAN/ULC-S704 (polyiso)
Wood panelsCSA O121, CSA O151, CSA O325

Products that do not fit an existing standard, such as many synthetic underlayments and new membrane types, are accepted through product evaluations. In Canada, the Canadian Construction Materials Centre (CCMC) evaluates such products and publishes evaluation reports that building officials rely on. The report says how the product must be installed to comply, and it usually points back to the manufacturer's instructions.

Manufacturer's instructions, specifications and warranties

Three other documents sit beside the code on every job, and roofers must keep them straight:

  • The manufacturer's installation instructions: printed on the wrapper or in the technical manual. The code requires listed products to be installed following them, so ignoring the wrapper can be a code violation as well as a warranty problem. Where the instructions are stricter than the code (six nails instead of four, underlayment where the code does not require it), follow the instructions.
  • The project specification and drawings: on commercial jobs, the architect's or engineer's documents describe exactly which system, products and details to use. They usually exceed the code minimum. Changes need the designer's written approval.
  • The warranty: the manufacturer's promise to repair or replace the roof under stated conditions. Many warranties require the roofing contractor to be approved by the manufacturer, the installation to be inspected and every component to come from the same system. A roof can meet the code and still have no warranty if the rules were not followed.

The code is the minimum. A roof built only to the code minimum will be legal, but the best roofs follow the manufacturer's full system, the specification and good trade practice as described in industry manuals.

Inspections

On jobs with a permit, the building department inspects at the stages it sets out, and roofers must leave work open for inspection where required. For a Part 9 house, roofing inspections are often limited, but where a permit was issued, an inspector may want to see the deck repairs, eave protection or flashings before they are covered. On larger buildings, the designer usually carries out general review of the roofing and may hire a roofing consultant to inspect it, and the manufacturer may also inspect for the warranty. Have the permit, approved drawings and product information on site.

When an inspector or consultant points out a problem, listen, ask where the requirement is so you can read it, and report it to your foreperson. Arguing on the roof helps no one. If there is a genuine disagreement, the company resolves it with the building official.

Checking a job against the code

Anjali finished the second morning with three exercises. Rory's answers are below.

Worked problem

Which part of the code applies?

Ridgecap is bidding on two jobs: a two-storey office with a building area of 450 m², and the Northgate Medical Building, two storeys with a building area of about 1,400 m². Which part of the OBC governs the roofs?

Show solution
  1. Part 9 applies, in general, to buildings of three storeys or less with a building area of 600 m² or less, in the common uses.
  2. The office: two storeys and 450 m², a business use, so Part 9.
  3. Northgate: two storeys but about 1,400 m² of building area, more than 600 m², so it is designed under Parts 3, 4 and 5.

Answer: The office roof follows Part 9 (Section 9.26). Northgate's roof follows the Part 3, 4 and 5 requirements, as shown on the architect's and engineer's drawings.

Worked problem

Is the slope allowed?

A porch roof on a Linden Street house is 3 in 12. The owner wants it shingled to match the house. Is that allowed?

Show solution
  1. 3 in 12 = 3 ÷ 12 = 0.25, which is 1 in 4.
  2. Normal asphalt shingle application needs at least 1 in 3 (0.333). 1 in 4 is flatter, so normal application is not allowed.
  3. The low-slope shingle method is allowed down to 1 in 6 (0.167). 1 in 4 is steeper than that, so the low-slope method can be used.
  4. Check that the shingle manufacturer also allows its product on this slope.

Answer: Yes, but only with the low-slope method (extra coverage and cemented tabs) and the manufacturer's approval. A membrane would be the better roof.

Worked problem

Ventilation for a cathedral ceiling

An addition has a 40 m² cathedral ceiling built with roof joists, insulated between the joists with a vented space above. What minimum vent area does Part 9 require?

Show solution
  1. Roofs built with roof joists use the 1/150 ratio, not 1/300.
  2. Vent area = 40 ÷ 150 ≈ 0.267 m².
  3. At least a quarter at the top and a quarter at the bottom, spread on opposite sides; the joist spaces must be interconnected or each vented.

Answer: About 0.27 m² of vent area. Ridgecap would also check the clear air space above the insulation the code requires.

Keeping current

Codes change. New editions arrive every few years, and amendments in between. Rules that were true when you trained may not be true now, and different cities can be on different editions during a changeover. Good habits for keeping current:

  • Know which edition applies to each job; it is usually the one in force when the permit was applied for.
  • Use the official version of the code, not a summary or a forum post.
  • Read the manufacturer's current instructions; they change more often than the code.
  • Watch for industry bulletins from roofing contractors' associations and manufacturers.
  • When in doubt, ask the building department. Its answer for that job is the one that counts.

"The code is the floor, not the ceiling," Anjali said, closing the binder. "Build every roof as if you'll be the one called back when it leaks, because sometimes you will be."

Common mistakes

  • MistakeAssuming the code requires only what the crew has always done.

    InsteadLook up the requirement in the adopted code and the manufacturer's instructions for each job.

  • MistakeTreating manufacturer's instructions as optional extras.

    InsteadThe code requires listed products to be installed following them; where they are stricter, they rule.

  • MistakeRecovering an old roof without checking the limits.

    InsteadCheck the code, the manufacturer's rules and the structure; when in doubt, tear off to the deck.

  • MistakeQuoting rules from an old edition or a website summary.

    InsteadUse the edition in force for the job, from the official source.

  • MistakeArguing with an inspector on the roof.

    InsteadAsk where the requirement is, report it to the foreperson, and let the company resolve disagreements with the building official.

Summary and key terms

  • The NBC is a model code; Ontario adopts it as the OBC (O. Reg. 163/24, in force January 1, 2025), enforced by municipalities.
  • Part 9 covers houses and small buildings, with roofing in Section 9.26 and roof space ventilation in Section 9.19; larger buildings follow Parts 3, 4 and 5.
  • The code sets slopes, flashing, eave protection, underlay or underlayment, covering-specific rules, fire classes and wind performance.
  • Referenced standards and product evaluations become part of the legal requirement.
  • Manufacturer's instructions, specifications and warranties often exceed the code; follow the strictest.
  • Check permits, inspections and the edition in force for every job.
Model code
A code written for adoption by governments; it has no legal force until adopted.
Ontario Building Code
The building regulation in force in Ontario, based on the National Building Code.
Part 9
The part of the code covering houses and small buildings.
Acceptable solution
A detailed code requirement that is deemed to meet the code's objectives.
Alternative solution
A design shown to perform at least as well as an acceptable solution, approved by the building official.
Referenced standard
A standard named in the code, which becomes part of the requirement.
Product evaluation
A report showing how a product not covered by a standard can comply with the code.
Chief building official
The person with authority to enforce and interpret the building code in a municipality.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. Which regulation is the current Ontario Building Code?

    Show answer

    Ontario Regulation 163/24, in force since January 1, 2025.

  2. What are the size limits for Part 9, in general?

    Show answer

    Three storeys or less and a building area of 600 m² or less, in the common uses.

  3. Does Part 9 require full underlay under asphalt shingles on normal slopes?

    Show answer

    No, but manufacturers almost always do, and Ridgecap installs it.

  4. A porch roof is 1 in 5. Can normal shingle application be used?

    Show answer

    No; normal application needs 1 in 3. The low-slope method (down to 1 in 6) could be used.

  5. Who enforces the OBC on a Hamilton job?

    Show answer

    The City of Hamilton's building division.

Lesson quiz · 5 questions

Score 60% or more to complete this lesson.

Take the quiz