ROOF-320 · Lesson 8 of 12 · 24 min

Walls and chimneys on steep roofs

▶ Video coming soon A video version of this lesson is on the way.

Theo keeps a mock-up chimney in the corner of the shop: a stub of real brick, 40 in wide, built on a short section of 8 in 12 roof framing with plywood sheathing, so apprentices can practice flashing it and tearing it off again. On the Thursday evening of the Ferncliff week he had Rory and Keisha flash it from scratch, the way Wes and Crew 5 had reflashed the chimney at 41 Linden in August, but this time with a sheet metal cricket behind it and stepped counterflashing cut into the mortar joints, the way a heritage mason would want it. "At Linden you put the counterflashing in a sawn reglet," Theo told Rory. "Today you're going to lay out steps. Every one of them has to sit in a joint and lap the one below it. Measure twice."

ROOF-130 lesson 11 covered the basics of step, apron and chimney flashing on a shingle roof. This lesson goes further: how wall flashing has to work with different wall claddings, stepped and reglet counterflashings on masonry, headwalls and changes of pitch, dormers, chimney crickets and how they are built, the water that comes through masonry itself, and kickout flashings at the bottom of a wall.

The rules in brief

The Residential Code of Ohio follows the IRC. In its own words: flashing is required where roofs meet walls and chimneys (R903.2); step flashing at sidewalls must be at least 4 in by 4 in pieces, laid with each course of shingles (R905.2.8.3); a cricket or saddle is required on the ridge side of any chimney or penetration more than 30 in wide across the slope (R903.2.2); and where a roof meets a wall that continues past the eave, a kickout or diverter flashing at least 0.019 in thick is required to turn water into the gutter (R903.2.1).

Makers of shingles, siding, stucco and windows add their own requirements, and where theirs are stricter they usually govern the warranty. The rest of this lesson explains how the pieces fit together so that the minimums actually work.

Sidewalls and different claddings

Step flashing at a sidewall works by turning each course of shingles up the wall with its own L-shaped piece, so that water running down the wall and along the roof is handed from piece to piece and onto the shingle below. What covers the top of the step flashing depends on the wall.

What counterflashes the step flashing at different walls.
Wall claddingWhat covers the step flashingTypical points to watch
Vinyl or metal sidingThe siding, over a wall underlayment lapped over the step flashingLeave the siding's J-channel or trim clear of the roof surface so it does not sit in water
Fiber cement or wood sidingThe siding and wall underlaymentSiding makers typically want a gap of 1 to 2 in above the roof; seal and paint cut ends
StuccoStucco over the wall underlayment, ending at a weep screed or casing beadNever bury stucco into the shingles; it wicks water
Brick or stone veneerMetal counterflashing in the mortar joints, and a through-wall flashing in the veneer aboveThe veneer cavity must drain out above the roof
Solid masonry or chimneyStepped or reglet counterflashing in the jointsThe masonry itself absorbs water; see below
Exterior insulation and finishThe system's own flashing and trim, ending above the roofFollow the system maker's roof-to-wall detail exactly

On framed walls, the most important layer is the one you cannot see: the wall's water-resistive barrier, the housewrap or building paper. It must lap over the vertical leg of each step flashing, so water running down behind the siding comes out on top of the flashing, not behind it. When re-roofing against a wall with siding that will stay, the siding's bottom course is lifted or removed so the new step flashing can go under the existing barrier. Tucking new step flashing behind the siding but in front of the barrier, or sealing it to the face of the siding, puts the water behind the flashing.

Worked problem

Counting step flashing

A dormer cheek wall at an 8 in 12 slope is 12 ft long measured along the slope. The shingles are laid at a 5-5/8 in exposure, and each step flashing is 10 in long. How many pieces are needed for one cheek wall, and how much does each piece lap the one below?

Show solution
  1. Courses along the wall = 144 ÷ 5.625 = 25.6, so 26 courses (round up for the starter and the top).
  2. One step flashing per course = 26 pieces, plus one at the bottom with the kickout if the wall runs past the eave.
  3. Lap = piece length − exposure = 10 − 5.625 = 4.375 in, about 4-3/8 in.

Answer: 26 pieces for each cheek wall, each lapping the one below by about 4-3/8 in. Two cheek walls take 52 pieces; order a bundle of 100 to allow for the apron corners and waste.

Stepped and reglet counterflashing on masonry

On a brick chimney or wall, the step flashings are covered by a metal counterflashing that is let into the masonry. There are two ways to do it. A reglet counterflashing is a straight strip, set in a continuous slot sawn into the masonry parallel to the roof, folded into the slot, wedged and sealed. It is quick, but sawing across the brick faces leaves a visible line and cuts through the hard outer skin of each brick. A stepped counterflashing follows the mortar joints instead: each piece is cut with a top edge that turns into one horizontal joint, its bottom edge parallel to the roof, and the pieces lap one another going down the slope. It takes longer, keeps the brick whole and looks right on older buildings.

Elevation and section of the side of a brick chimney on a sloped shingle roof. The elevation shows step flashings under each shingle course and stepped counterflashing pieces whose tops turn into successive horizontal mortar joints, each piece lapping the one below, with the bottom edges following the roof slope. A small section shows one counterflashing piece turned into a mortar joint by about 25 mm, wedged and sealed, lapping down over the vertical leg of a step flashing.
Stepped counterflashing: each piece turns into a mortar joint and laps the next one down.

Worked problem

Laying out stepped counterflashing

The side of Theo's mock-up chimney is 48 in long, measured horizontally, where it meets an 8 in 12 roof. The brick courses are 2-2/3 in high. How much does the roof rise along the side of the chimney, and how many brick courses does the counterflashing step through?

Show solution
  1. Slope = 8 ÷ 12 = 0.667.
  2. Rise along the chimney side = 48 × 0.667 = 32 in.
  3. Courses = 32 ÷ 2.667 = 12.0, so the flashing steps through 12 courses.
  4. Horizontal length of each step = 2.667 ÷ 0.667 = 4 in, so 12 pieces each covering about 4 in along the chimney, plus laps.

Answer: 12 steps on each side. Rory cut 12 pieces from a pattern, each with a 1 in turn-in at the top and a 3 in lap onto the next piece down, and Theo checked that every bottom edge stopped above the shingles so it would not trap debris.

Headwalls and changes in pitch

Where a roof runs up into a wall across its slope, at the bottom of a dormer front or under a second-story wall, an apron or headwall flashing turns up the wall and lies down over the top course of shingles. Its roof leg must be wide enough to cover the top course and extend onto the shingles below; its wall leg runs up behind the wall barrier or under the counterflashing. At each end, where the headwall meets a sidewall, the apron is cut and folded around the corner, and the first step flashing laps over it.

Where the slope changes, from a steep upper roof to a flatter lower one, as on a mansard or a porch roof, the change of pitch is flashed with a bent metal strip that laps under the upper shingles and over the lower ones. On roofs flatter than the shingle maker's minimum, the lower part must be a low-slope roof, not shingles, with its own flashing up under the steep shingles.

Chimney crickets

A cricket, also called a saddle, is a small roof built behind a chimney to divide water running down the slope and send it around both sides. Without one, water and snow dam against the uphill face of the chimney, debris gathers, and the back pan of the flashing sits wet. The codes call for a cricket on chimneys wider than about 30 in across the slope, and many roofers build one on narrower chimneys too.

Crickets are framed with a ridge board running straight up the slope from the middle of the chimney, two valley boards running from the chimney corners to the ridge, and sheathing between. The ridge is usually set at the same slope as the main roof or flatter. The cricket is covered with metal, often a single piece of soldered copper or painted steel on a heritage or quality job, or with underlayment and shingles with metal valleys on an ordinary house. Its back edge is flashed and counterflashed to the chimney like the rest.

Plan and side view of a cricket behind a 1,000 mm wide chimney on an 8 in 12 roof. The plan shows the ridge running up the slope from the middle of the chimney and two valleys running to the corners. The side view shows the cricket ridge height at the chimney face and the length of the ridge up the roof.
A chimney cricket divides the water and sends it round both sides.

Worked problem

Sizing a chimney cricket

Theo's mock-up chimney is 40 in wide. The cricket ridge will run up the roof from the middle of the chimney for half the chimney width, and the cricket faces will slope at the same 8 in 12 as the roof. How long is the ridge measured horizontally, how high is the ridge above the roof at the chimney face, and how long is each valley in plan?

Show solution
  1. Ridge length in plan = 40 ÷ 2 = 20 in.
  2. Height at the chimney face: the faces fall from the ridge to the chimney corners, 20 in away, at 8 in 12: 20 × 0.667 = 13.3 in.
  3. Each valley runs from a chimney corner to the top of the ridge: in plan, √(20² + 20²) = 28.3 in.

Answer: A ridge 20 in long in plan, about 13-1/4 in high at the chimney, and valleys about 28-1/4 in in plan. The back flashing of the chimney must now rise that much higher at the middle, so the counterflashing on the uphill face is set in a higher joint at the center.

Water that comes through the masonry

A brick chimney absorbs rain. Water soaks into the brick and mortar above the roof, runs down inside the masonry, and comes out below the flashing, in the attic or on a ceiling, even when every piece of flashing is perfect. Old chimneys with soft brick, open joints or a cracked cement crown at the top are the worst. When a chimney leak will not stop, check the crown and the cap, the mortar joints above the roof, and whether the chimney is soaking up water through its faces. The fixes are a mason's: a new crown with a drip, repointing, a water-repellent treatment that lets the masonry breathe, or, on a rebuild, a through-wall flashing or pan built into the chimney just above the roof that catches the water inside the brick and sends it out over the counterflashing.

Kickouts

At the bottom of a sidewall that continues past the eave, the last step flashing hands its water to nothing, and the water runs down the wall behind the gutter end. A kickout flashing, also called a diverter, is a one-piece formed flashing that turns that water out into the gutter. Kickouts must be one piece or soldered, with no open seam at the bend, set under the wall barrier and siding, and the gutter end must be capped with an end cap a short way back from the wall so the kickout can discharge into it. Missing kickouts are one of the most common causes of rotted sheathing and framing below roof-to-wall intersections.

Common mistakes

  • MistakeTucking new step flashing in front of the wall barrier.

    InsteadLift the siding and lap the existing barrier over the vertical leg of each step flashing.

  • MistakeBurying the bottom of stucco or siding in the shingles.

    InsteadKeep the cladding clear of the roof as its maker requires.

  • MistakeSealing counterflashing to the brick face with a bead of caulk.

    InsteadTurn it into a mortar joint or a reglet, then wedge and seal.

  • MistakeLeaving a wide chimney without a cricket.

    InsteadBuild a cricket on any chimney wider than about 30 in.

  • MistakeBlaming the flashing for every chimney leak.

    InsteadCheck the crown, joints and masonry absorption too.

Summary and key terms

  • The Ohio code sets minimum sizes for step flashing, requires counterflashing at masonry, crickets on chimneys wider than 30 in, and kickouts.
  • The wall barrier must lap over every step flashing; the cladding covers the top and stays clear of the roof.
  • Masonry counterflashing is set in a sawn reglet or stepped along the mortar joints, each piece lapping the next.
  • Headwalls use apron flashings; changes in pitch use bent flashings, and too-flat sections must be low-slope roofing.
  • Crickets are framed with a ridge and two valleys, covered with metal or shingles, and raise the back flashing at the chimney.
  • Masonry absorbs water; leaks through brick need a mason's repair, not more flashing.
Step flashing
L-shaped pieces laid with each shingle course where a roof meets a sidewall.
Apron flashing
A flashing across the top of a roof slope where it meets a wall.
Stepped counterflashing
Counterflashing pieces set into successive mortar joints, each lapping the one below.
Reglet
A slot sawn or cast into masonry to receive counterflashing.
Saddle
Another name for a chimney cricket.
Kickout flashing
A one-piece diverter at the bottom of a sidewall that turns water into the gutter.
Water-resistive barrier
The housewrap or building paper behind siding that sheds water reaching it.
Crown
The concrete or mortar cap on top of a chimney.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. A cheek wall is 10 ft along the slope and the exposure is 5-5/8 in. How many courses and step flashings?

    Show answer

    120 ÷ 5.625 = 21.3, so 22 courses and 22 pieces.

  2. Above what chimney width does the Ohio code call for a cricket?

    Show answer

    More than 30 in.

  3. A cricket behind a 32 in chimney slopes at 6 in 12. How high is it at the chimney?

    Show answer

    16 × 0.5 = 8 in.

  4. Which layer must lap over the vertical leg of each step flashing?

    Show answer

    The wall's water-resistive barrier.

  5. Name one mason's repair for a chimney that leaks through its brick.

    Show answer

    A new crown, repointing, a breathable water repellent or a through-wall flashing.

Lesson quiz · 5 questions

Score 60% or more to complete this lesson.

Take the quiz