ELEC-130 · Lesson 3 of 12 · 31 min

Service entrance and panelboards

The service is where the utility's system ends and the building's wiring begins. It brings power to the house, measures it, provides a means of disconnecting everything at once, protects the building wiring against overcurrent, and establishes the connection to earth and the bond between the neutral and the equipment grounding system. Mistakes at the service affect every circuit in the house and, because service conductors usually have no overcurrent protection on their supply side other than the utility's transformer fuse, they can carry very large fault currents. This lesson covers the parts of a residential service, overhead and underground supplies, sizing the service conductors, panelboards, grounding and bonding at the service, and the location and working space for equipment.

The parts of a residential service

North American homes are supplied with single-phase, three-wire 120/240 V power from a utility transformer whose secondary winding is center-tapped: the two ends (the ungrounded or "hot" conductors, often called L1 and L2) are 240 V apart, and each is 120 V from the grounded center tap, the neutral. A typical service has these parts, in order from the utility:

  • Service drop (overhead) or service lateral (underground): the utility's conductors to the building. Ownership and responsibility boundaries vary by utility.
  • Service entrance conductors: from the point of connection to the service equipment, often run through a mast or conduit.
  • Meter base (meter socket): supplied and installed by the electrician, to the utility's specification, holding the utility's revenue meter.
  • Service equipment: the main disconnecting means and overcurrent protection, usually a main breaker in the panelboard ("main-breaker panel"), or a separate disconnect where the panel is remote or the code requires it.
  • Grounding electrode system and grounding electrode conductor, and the main bonding connection between the neutral and the service enclosure.
Diagram of an overhead residential service. The utility pole transformer feeds a three-wire service drop to an attachment point and mast on the house. Service entrance conductors run down the mast to the meter base, then into the house to a main-breaker panelboard. In the panel, the neutral bar is joined to the enclosure by the main bonding jumper, and a grounding electrode conductor runs to the water pipe electrode and a ground rod, with a second rod at least 6 feet away. Branch circuits leave the panel.
The parts of an overhead residential service.

Overhead and underground supply

An overhead service uses a service drop from the utility pole to an attachment point on the house, often a mast that passes through the roof eave to gain height. The code and the utility set minimum clearances for the drop above roofs, ground, driveways and streets, and from windows, decks and swimming pools, and the mast must be strong enough to resist the drop's tension (masts are typically rigid metal conduit of at least the size the utility specifies, braced if tall).

In the US, NEC 230.24 sets minimum clearances for service drops: generally at least 8 ft above roofs (with reductions for low-slope and overhang conditions), 10 ft above finished grade and sidewalks for drops of 150 V to ground or less, 12 ft over residential property and driveways, and 18 ft over public streets and roads. Utilities publish service requirements that add details such as meter heights and mast specifications.

Underground services run the lateral in conduit or as direct-buried cable from a pad-mounted transformer or a pedestal, entering the meter base from below. They avoid the clearance and storm problems of overhead drops and are standard in new subdivisions. Conduits must be deep enough to protect the conductors, sealed where they enter the building to keep out water and gas, and arranged so that frost heave does not damage the meter base (expansion fittings are common in cold climates).

Sizing service conductors

Service conductors must carry the calculated load from Lesson 1 and be protected by the service overcurrent device. In general they are sized from the ampacity tables used in ELEC-120, at the 75 °C column for typical terminations. Because the diversity of household loads means a dwelling's service conductors rarely carry their rated current for long, both codes allow smaller conductors for dwelling services than the general tables would give.

NEC 310.12 permits the service and main feeder conductors of a single-family dwelling (or each unit of a two-family or multi-family dwelling) to have an ampacity of not less than 83% of the service rating. For a 200 A service, conductors with an ampacity of at least 166 A may be used: 2/0 AWG copper (175 A at 75 °C) or 4/0 AWG aluminum (180 A). For 100 A, 83 A: 4 AWG copper (85 A) or 2 AWG aluminum (90 A). Aluminum is common for services and must be terminated in equipment marked for it, torqued to the specified value.

Worked problem

Service conductors for a 200 A service

A house has a calculated load of 176 A and receives a 200 A service. What aluminum and copper conductors satisfy 310.12, and what other checks apply?

Show solution
  1. 83% of 200 A = 166 A: 4/0 AWG aluminum (180 A) or 2/0 AWG copper (175 A).
  2. The conductors must also carry the calculated load (230.42): 4/0 aluminum at 180 A does, but 2/0 copper at 175 A falls 1 A short of 176 A, so 3/0 copper (200 A) would be used instead. Apply correction or adjustment factors if the conductors run through hot attics or are bundled, which takes them out of the 83% rule.
  3. Check voltage drop on long underground laterals, and the utility's requirements for the meter base and conductor entry.

Answer: 4/0 AL, or 3/0 CU because of the 176 A calculated load, subject to terminations, installation conditions and voltage drop.

Panelboards

The panelboard (load center) distributes power to branch circuits. A typical residential panel has two bus bars, one for each ungrounded conductor, arranged so that alternate breaker positions connect to alternate buses: a single-pole breaker connects to one bus and supplies 120 V circuits; a two-pole breaker spans both and supplies 240 V circuits. A neutral bar collects the neutrals, and a separate equipment grounding (bonding) bar collects the equipment grounding conductors.

Choosing a panel involves its ampere rating (at least the service or feeder rating), its number of circuit positions (allow plenty of spare spaces: heat pumps, EV chargers and solar are often added later), its short-circuit current rating (which must be at least the fault current available from the utility, commonly 10 kA for residential, but larger near big transformers), and the breaker types it accepts. Breakers must be those listed for the panel; mixing brands or using "classified" substitutes only where specifically permitted.

The NEC requires multiwire branch circuits to have a means to disconnect all ungrounded conductors simultaneously (a two-pole breaker or identified handle tie), panelboards to have a short-circuit current rating at least equal to the available fault current, and overcurrent devices not to be located in bathrooms or clothes closets (240.24). Since the 2020 edition, dwelling services must have a surge protective device (230.67), and one- and two-family dwellings need an emergency disconnect at a readily accessible outdoor location (230.85).

Diagram of a residential panelboard. The two service conductors L1 and L2 connect to the main breaker, which feeds two vertical bus bars. Breaker positions alternate between the buses down each side. A single-pole breaker on one bus feeds a 120 volt circuit with its neutral to the neutral bar. A two-pole breaker spanning both buses feeds a 240 volt circuit. The neutral bar is bonded to the enclosure by the main bonding connection, and a separate ground bar collects equipment grounding conductors.
Inside a main-breaker panelboard: alternating bus positions give 120 V single-pole and 240 V two-pole circuits.

Worked problem

Balancing a panel

A panel's 120 V loads total 42 A on L1 and 18 A on L2 at the busiest time of day, plus 240 V loads drawing 50 A. What are the currents in L1, L2 and the neutral? How could the panel be improved?

Show solution
  1. L1: \(42 + 50 = 92\) A. L2: \(18 + 50 = 68\) A.
  2. Neutral: the difference of the 120 V loads, \(42 - 18 = 24\) A (240 V loads put no current on the neutral).
  3. Moving about 12 A of 120 V load from L1 to L2 would give 30 A on each, so L1 = L2 = 80 A and the neutral current would fall to near zero.

Answer: L1 carries 92 A, L2 68 A and the neutral 24 A. Balancing the 120 V circuits between the two buses lowers the maximum conductor current from 92 A to 80 A and the neutral current toward zero, reducing losses and voltage drop and freeing capacity.

Open neutrals

If the service neutral is lost (from a corroded connection at the meter base or a broken drop), 120 V loads on the two buses are left in series across 240 V. The bus with the lighter load sees more than 120 V, sometimes nearly 240 V, and the heavier one less, which can destroy electronics and appliances and cause lights to flicker bright and dim as loads change. Symptoms such as lights brightening when a large 120 V load starts are a warning that should be investigated at once. Neutral connections at the service must be tight, correctly torqued and protected from corrosion.

Grounding and bonding at the service

ELEC-120 explained the two separate jobs of grounding (connecting the system to earth to limit voltages from lightning, line surges and contact with higher-voltage lines) and bonding (connecting metal parts so that a fault clears quickly and no dangerous touch voltages remain). At a residential service:

  • The neutral is connected to the grounding electrode system and bonded to the service enclosure at one point only, the service equipment. Downstream of the service, the neutral and the equipment grounding conductors are kept separate, so that normal neutral current does not flow on metal enclosures and grounding conductors. A subpanel in the house or a detached garage therefore has an isolated neutral bar and a separate bonded ground bar, fed by a four-wire feeder.
  • The grounding electrode system includes every electrode present at the building (250.50): metal underground water pipe in contact with earth for 10 ft or more (which must be supplemented by another electrode), concrete-encased electrode (20 ft of rebar or 4 AWG copper in the footing), ground ring and rod or pipe electrodes. A single rod must be supplemented by a second electrode unless it has a resistance of 25 Ω or less; two rods must be at least 6 ft apart (250.53). The grounding electrode conductor is sized from Table 250.66 by the service conductor size: for example, 4 AWG copper for 2/0 copper or 4/0 aluminum service conductors, and connections to rods need not be larger than 6 AWG copper.
  • Metal water piping and other metal piping systems, such as gas piping where required, are bonded to the service so that they cannot become energized at a different potential from the electrical system.

Worked problem

Why the neutral is bonded only at the service

A subpanel in a garage is fed by a three-wire feeder (two hots and a neutral) and its neutral is bonded to its enclosure. A 120 V load in the garage draws 15 A. Where does the neutral current flow, and what is the hazard?

Show solution
  1. With the neutral bonded at the subpanel, returning current divides between the neutral conductor and every parallel metal path back to the service: conduit, cable armor, water piping and grounding conductors.
  2. Some of the 15 A flows on these metal parts continuously, and if the neutral conductor opens, all of it does, energizing metal parts.

Answer: Neutral current flows on metal that people touch and on grounding paths intended only for faults, creating shock risk, heating and interference. The fix is a four-wire feeder (adding an equipment grounding conductor), an isolated neutral bar in the subpanel and its bonding screw or strap removed.

Location and working space

Service equipment and panelboards must be readily accessible and have clear working space in front of them so that a person can operate and maintain them safely.

NEC 110.26 requires working space in front of panelboards at least 30 in wide (or the width of the equipment, if greater), 36 in deep for 120/240 V residential equipment, and 6½ ft high, kept clear of storage, with illumination. The service disconnect must be at a readily accessible location nearest the point of entrance of the service conductors (230.70), and overcurrent devices may not be located in bathrooms or clothes closets (240.24).

Side and front view of a panelboard on a wall with the required working space shown as a shaded box 30 inches wide, 36 inches deep and 6.5 feet high in front of it, and a note that storage is not permitted in the space.
Required clear working space in front of a residential panelboard.

Lesson 10 returns to the service when solar, batteries, generators and EV chargers are added, and Lesson 11 covers service upgrades and panel replacements in existing homes.

Common mistakes

  • MistakeBonding the neutral to the enclosure in a subpanel.

    InsteadBond neutral to ground only at the service; subpanels have isolated neutrals and four-wire feeders.

  • MistakeUsing breakers of a different brand in a panel.

    InsteadUse only breakers listed for that panel (or classified breakers explicitly permitted for it).

  • MistakeLeaving aluminum terminations untorqued or without anti-oxidant where required.

    InsteadTorque to the manufacturer's value and follow the termination instructions for aluminum.

  • MistakeLoading all 120 V circuits on one bus.

    InsteadBalance 120 V loads between L1 and L2 to reduce conductor and neutral current.

  • MistakeLocating a panel in a clothes closet or bathroom, or storing items in front of it.

    InsteadKeep panels accessible with the required clear working space.

  • MistakeIgnoring the available fault current.

    InsteadCheck that the panel and breakers have short-circuit ratings at least equal to the available fault current.

Summary and key terms

  • Residential services are single-phase 120/240 V three-wire from a center-tapped transformer.
  • Parts: service drop or lateral, service entrance conductors, meter base, service equipment (main disconnect and overcurrent protection), grounding electrode system and main bonding connection.
  • Overhead drops need code and utility clearances; underground laterals need depth, sealing and frost protection.
  • Dwelling service conductors may have 83% of the service rating (310.12): 200 A → 2/0 CU or 4/0 AL.
  • Panels: two alternating buses give 120 V and 240 V circuits; check ampere rating, spaces, short-circuit rating and listed breakers.
  • Balance 120 V loads; an open service neutral causes dangerous over- and under-voltages.
  • Neutral and ground are bonded only at the service; subpanels have isolated neutrals and four-wire feeders.
  • Grounding electrodes per 250.50–250.53 (two rods 6 ft apart unless one is 25 Ω or less); GEC per Table 250.66; working space 30 in × 36 in × 6.5 ft.
Service drop
Overhead utility conductors from the pole to the building.
Service lateral
Underground utility conductors to the building.
Service entrance conductors
Conductors from the point of connection to the service equipment.
Meter base
The socket that holds the utility's revenue meter.
Service equipment
The main disconnecting means and overcurrent protection for the building.
Panelboard
An assembly of buses and overcurrent devices distributing power to circuits.
Two-pole breaker
A breaker that connects to both ungrounded buses, supplying 240 V.
Multiwire branch circuit
A circuit with two ungrounded conductors sharing one neutral.
Main bonding connection
The main bonding jumper connecting the neutral to the service enclosure.
Grounding electrode
A conducting object that connects the electrical system to the earth.
Open neutral
A broken neutral connection that causes unequal voltages on 120 V loads.
Short-circuit current rating
The maximum fault current equipment can safely withstand or interrupt.
Working space
The clear area required in front of electrical equipment.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. What are the voltages between L1 and L2, and between either and neutral, in a residential service?

    Show answer

    240 V between L1 and L2; 120 V from either to neutral.

  2. What minimum ampacity must the service conductors of a 150 A dwelling service have under 310.12?

    Show answer

    0.83 × 150 = 124.5 A, e.g. 1 AWG copper (130 A at 75 °C) or 2/0 aluminum (135 A).

  3. L1 carries 30 A of 120 V load and L2 carries 45 A of 120 V load. What is the neutral current?

    Show answer

    15 A (the difference).

  4. A house has a 30 A, 240 V water heater as its only load besides balanced lighting. What does the water heater add to the neutral?

    Show answer

    Nothing: a 240 V load uses only L1 and L2.

  5. With an open service neutral, 120 V loads of 10 Ω on L1 and 30 Ω on L2 are in series across 240 V. What voltage does each see?

    Show answer

    Current 240/40 = 6 A; L1 load 60 V, L2 load 180 V: the lightly loaded side sees 180 V.

  6. Why does a detached garage subpanel need a four-wire feeder?

    Show answer

    So the neutral can be isolated from the enclosure and an equipment grounding conductor carries fault current, keeping normal neutral current off metal parts.

  7. A single rod measures 40 Ω. What must be done?

    Show answer

    Install a supplemental electrode (commonly a second rod at least 6 ft away); the 25 Ω exception does not apply.

  8. A panel is rated 10 kA but the utility reports 14 kA available fault current. Is it acceptable?

    Show answer

    No: equipment must be rated for at least the available fault current; use a higher-rated panel or a series-rated combination as permitted.

  9. Give the working space dimensions for a 120/240 V residential panel.

    Show answer

    30 in wide, 36 in deep, 6.5 ft high.

  10. Why must breakers be listed for the panel they are installed in?

    Show answer

    Bus contact design, ratings and testing are specific to the panel; mismatched breakers can overheat, fail to clear faults or void the listing.

Lesson quiz · 5 questions

Score 60% or more to complete this lesson.

Take the quiz