Cantwell's certificates of inspection hang in a glass frame by the control room door: one for each boiler and pressure vessel, each showing its registration number, the date of its last inspection and the date by which the next one is due. Grazyna stopped beside the frame on her way out of the session on incident investigation. "Who is responsible for every one of these?" she asked. Okonkwo guessed TSSA, then the insurer, then her. "The owner," she said. "Not the inspector, not the regulator. The law puts the duty on the owner, and the owner puts it on the chief engineer, which today is me and one day will be you."

This lesson sets out what owners of pressure equipment must do under the law in Ontario, the jurisdiction Cantwell operates in, and in Alberta, whose regulator ABSA has the longest-established owner programs in Canada and whose requirements are now harmonized with Saskatchewan's and Manitoba's. It covers inspections and certificates, the roles of TSSA, insurers and authorized inspection agencies, notifications and records, quality programs for repair organizations, Ontario's owner-user self-inspection certificate and Alberta's pressure equipment integrity management system. It closes with the chief engineer's practical checklist.

The owner's duty

In Ontario, the Technical Standards and Safety Act and O. Reg. 220/01 make the owner of a boiler or pressure vessel responsible for its safety. The owner must ensure that it is designed, built, installed, operated, maintained, repaired and altered as the law and the adopted codes require; that it is registered and inspected and holds a current certificate of inspection; that it is operated by qualified people under O. Reg. 219/01; and that the records are kept. The duty cannot be handed to a contractor or an inspector. An inspector checks the owner's equipment at intervals; the owner is responsible every day in between.

In practice the owner gives this duty to a named person. At Cantwell that is the chief engineer, whose job description says, in effect, that she must know what pressure equipment the plant has, what condition it is in, and what the law requires of it, and must make sure it is done.

Inspections and certificates in Ontario

TSSA's 2025 code adoption amendment sets the maximum intervals between inspections: one year for high-pressure boilers, deaerators and vessels with quick-opening doors; two years for low-pressure boilers; and three years for most pressure vessels, including hydropneumatic and cushion tanks. Inspections are carried out by TSSA's own inspectors or by inspectors of insurers whom TSSA authorizes, such as Ottoline Brackwater. Records of inspection must reach TSSA within 30 days, and the certificate of inspection is issued or renewed when the item passes. An owner may not operate an item whose certificate has lapsed.

The amendment also sets the servicing intervals for pressure relief valves, with TSSA's approval needed to extend one, and requires owners to notify TSSA within 10 days when an item is removed from service, when its owner or insurer changes, or when an unsafe defect is found. Repairs and alterations need TSSA's agreement before they start, and engineering assessments may not override TSSA's minimum inspection cycle.

Worked problem

Counting Cantwell's inspections

Cantwell has three high-pressure steam boilers, one deaerator, two low-pressure hot water boilers and six other registered pressure vessels (the blowdown tank, the flash tank, the instrument air receiver, two softeners and a filter). At TSSA's maximum intervals, how many inspections fall due in an average year?

Show solution
  1. \[\underbrace{3 \times 1}_{\text{HP boilers}} + \underbrace{1 \times 1}_{\text{deaerator}} + \underbrace{2 \times \tfrac{1}{2}}_{\text{LP boilers}} + \underbrace{6 \times \tfrac{1}{3}}_{\text{vessels}} = 3 + 1 + 1 + 2 = 7\]

Answer: About seven inspections a year, more than one every two months, each with its own preparation, outage planning and paperwork. Grazyna staggers them so that no two high-pressure boilers are down at once in winter, and books the inspections of the boilers in summer, when the plant can spare them. A missed date is a legal problem as well as a safety one.

Repairs, alterations and quality programs

Under CSA B51 and TSSA's requirements, repairs and alterations to pressure-retaining parts must be made by organizations TSSA accepts, using registered welding procedures and qualified welders, with an inspector's acceptance. Contractors who do this work hold a TSSA quality program certificate, which requires a written quality control manual covering the scope of work, organization and authority, drawings and design control, material control, welding, examination and testing, calibration, records and the inspector's role, and which TSSA audits. Many also hold the National Board R certificate, which some owners prefer.

The quality program is what makes a repair trustworthy after the welder has left. It shows that the right material was used and traced, that the procedure and welders were qualified, that the examinations were done by certified people and accepted, and that the inspector saw what the program says the inspector must see. When Grazyna reviews a contractor, she asks for its certificate and a recent audit result before she asks for a price.

Owner-user self-inspection in Ontario

Large plants that run around the clock can apply to TSSA for a certificate of authorization as an owner-user self-inspection organization. The certificate allows the owner to inspect its own pressure equipment and accept repairs without a TSSA or insurer's inspector present, at the facility named on it, for three years. TSSA's guideline requires the plant to operate continuously all year; a quality program manual covering the scope of repairs, a signed statement of authority, an organization chart showing that the inspectors are independent of production, control of design and code interpretation, inspection methods and checklists, calibration, control of subcontracted examination and welding, corrective action and annual internal audits, and repair data reports kept for the life of the equipment; and at least two qualified, certified inspectors with no production duties. In the petrochemical industry the inspectors must hold API 510 and 570 certificates or have passed the National Board's in-service and repair inspector courses; in other continuous industries, the National Board courses. TSSA audits the program before granting the certificate and periodically afterward.

Cantwell is too small to justify a self-inspection program, and its insurer's inspection is part of its insurance. But the elements of the program, independent inspectors, written methods, calibrated instruments, controlled records and audits, are the same ones any owner needs to manage equipment well.

ABSA and Alberta's owner programs

In Alberta, pressure equipment comes under the Safety Codes Act and the Pressure Equipment Safety Regulation, administered by ABSA, the province's pressure equipment safety authority. Alberta has long required owners of large or complex plants to hold an ABSA certificate of authorization permit for an owner's integrity management system, under which the owner, with its own qualified inspectors, carries out most in-service inspection and some repair acceptance, with ABSA auditing the system. Organizations that design, build or repair pressure equipment hold their own ABSA quality management system certificates.

In October 2025, ABSA, the Technical Safety Authority of Saskatchewan (TSASK) and Manitoba's Inspection and Technical Services jointly issued AB-512H, *Harmonized Requirements for Pressure Equipment Integrity Management Systems*, so that an owner with plants in more than one of the three provinces can run one system. Its elements read like a summary of this course: governance, scope, organization, authority and responsibility; document control; competency and training; design control, purchasing and material control, construction and installation; control of monitoring and measuring devices; operation; management of change; an integrity assessment program; nondestructive examination and testing; repairs and alterations; overpressure protection and protective devices; internal audits; corrective and preventive action; and accidents and incidents. Where a province's own requirements differ, the province's prevail.

For Okonkwo, the point was that Alberta's system treats integrity management as the owner's own job, carried out under a management system and audited, rather than as a series of inspections done to the owner by someone else. Ontario's self-inspection certificate does the same for a smaller set of plants. "Whichever province you end up in," Grazyna said, "the owner who runs the best system gets the most freedom. The regulator watches the system instead of every vessel."

Records

Good records are the owner's evidence of compliance and the integrity program's memory. A pressure equipment file for each item holds:

  • The manufacturer's data report, drawings and design calculations, with the design registration or CRN where applicable, and the National Board registration.
  • The certificates of inspection and every inspection report, with findings and how each was resolved.
  • Repair and alteration records: the approvals, procedures, welder qualifications, material test reports, examination reports, pressure test records and repair data reports or forms.
  • Relief device records: nameplate data, capacity certification, set pressure, and every test, repair and replacement.
  • Thickness and condition data from the integrity program, with the corrosion rate and remaining life calculations (lesson 7).
  • Operating history that matters to integrity: water chemistry, layup periods, upsets such as low-water events and overpressure, and changes approved through MOC.

Repair records are kept for the life of the equipment. They often answer the hardest questions years later: what material was used in that patch, who welded it, and what the inspector accepted.

The chief engineer's checklist

Grazyna's own list, taped inside the cover of her binder, condenses the owner's duties into a page:

  • Every registered item is in the equipment register, with its file complete.
  • Every certificate is current, and the next inspection dates are booked and staffed.
  • Every relief device is within its servicing interval, sealed, with its record up to date.
  • Every repair or alteration has the jurisdiction's approval before it starts, and the paperwork after.
  • Every change to pressure equipment, its relief devices or its safety systems has been through MOC.
  • Every required notification has been made on time.
  • Operators are certificated or licensed as the plant requires, and trained on current procedures.
  • Integrity findings and recommendations are tracked to closure.

"If I can tick every line on a Monday morning, I sleep well," she said. "If I cannot, I know exactly what to do that week."

Preparing for the inspector

An inspection goes well when the owner has done the preparation, and Ontario's rules, like the insurer's, expect the owner to have the equipment ready. For an internal inspection of a boiler, that means taking it off line on a date agreed with the inspector, cooling it slowly, draining it, opening the manways and handholes, washing out the water side and cleaning the fire side, and isolating it from every source of steam, water, fuel and electricity with locks and tags, so that the inspector can enter safely under the plant's confined space procedure (PWR-110). For a pressure vessel, it means draining, cleaning and isolating it in the same way, with access arranged.

Paperwork is part of the preparation. Grazyna sends the inspector, a week ahead, the item's file summary: the last inspection report and how each finding was resolved, any repairs since, the relief device records, the thickness readings and corrosion rates, and the operating history that matters, such as low-water events, layup periods and water chemistry problems. On the day, she or the shift engineer goes round with the inspector, answers questions and writes down every comment. The inspector's report arrives later, but the plant's own notes mean that work on the findings can start the same week.

Some things the inspector will always ask about: whether the low-water cutouts and the safety valves have been tested as the procedure requires; whether the gauge glass and water column are clear; whether the logbook shows the blowdowns and tests; whether any repairs were made without approval; and whether anything about the boiler or its operation has changed. A plant that can answer those quickly, from records, earns the inspector's confidence, and that confidence matters when a difficult decision has to be made together, as with boiler 3's tube repair in November.

Insurance and inspection

In Ontario, most boilers and pressure vessels in commercial and industrial plants are insured against breakdown and explosion, and the insurer's inspectors, authorized by TSSA, do most periodic inspections. The insurer has its own interest in the equipment's condition: an insurer that finds a dangerous condition may require repairs or suspend cover, and an owner without insurance must arrange inspections with TSSA directly. The insurer's engineering staff also offer advice on maintenance, water treatment and operation, and its loss reports are a useful record of what goes wrong across many plants.

Ottoline Brackwater has inspected Cantwell's boilers for several years. Grazyna treats her as a colleague whose independence is the whole point. "She is not here to help me run the plant," she told Okonkwo. "She is here to tell me, and the regulator, whether it is safe. The day an inspector becomes too friendly to say no is the day the system stops working."

Common mistakes

  • MistakeThinking the inspector is responsible for the equipment's safety.

    InsteadThe owner is responsible every day; the inspector checks at intervals.

  • MistakeRunning an item past the date on its certificate of inspection.

    InsteadBook inspections early; an expired certificate means the item may not operate.

  • MistakeStarting a repair before TSSA has agreed to it.

    InsteadGet the required approval first, then do the work.

  • MistakeHiring a repair contractor on price without checking its certification.

    InsteadConfirm its quality program or R certificate and recent audit first.

  • MistakeKeeping repair records only until the next inspection.

    InsteadKeep them for the life of the equipment.

  • MistakeAssuming Alberta's requirements apply in Ontario.

    InsteadEach jurisdiction's rules govern within it; check the local requirements.

Summary and key terms

  • In Ontario the owner is responsible for pressure equipment under the Technical Standards and Safety Act and O. Reg. 220/01; the duty rests in practice on the chief engineer.
  • TSSA's 2025 amendment sets maximum inspection intervals of 1, 2 and 3 years by type, 30-day reporting of inspection records, 10-day notifications and relief valve servicing intervals.
  • Repairs and alterations need TSSA's agreement and are done by organizations with accepted quality programs, with an inspector's acceptance.
  • TSSA's owner-user self-inspection certificate lets continuous plants inspect their own equipment under an audited quality program.
  • In Alberta, ABSA requires owner integrity management systems for many plants; AB-512H (2025) harmonizes the requirements with Saskatchewan and Manitoba.
  • Complete records, kept for the life of the equipment, are the owner's evidence and memory.
Owner
The person or organization legally responsible for the safety of pressure equipment.
Certificate of inspection
TSSA's certificate that a boiler or vessel has passed inspection and may operate until the date shown.
Authorized insurer's inspector
An inspector employed by an insurer and authorized by TSSA to inspect insured equipment.
Quality program
A written, audited system of controls that an organization follows to make repairs and alterations to code.
Owner-user self-inspection
A TSSA certificate allowing a continuous plant to inspect its own equipment under an approved program.
Integrity management system
An owner's documented system for keeping pressure equipment fit for service, audited by the regulator.
AB-512H
The 2025 harmonized requirements for pressure equipment integrity management systems in Alberta, Saskatchewan and Manitoba.
Repair data report
The record of a repair or alteration, kept for the life of the equipment.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. What is TSSA's maximum inspection interval for a deaerator?

    Show answer

    One year.

  2. Within how many days must records of inspection reach TSSA?

    Show answer

    30 days.

  3. An owner finds an unsafe defect in a vessel. Within how long must TSSA be notified?

    Show answer

    Within 10 days, under the 2025 amendment.

  4. Which three provinces harmonized their integrity management requirements in AB-512H?

    Show answer

    Alberta, Saskatchewan and Manitoba.

Lesson quiz · 5 questions

Score 60% or more to complete this lesson.

Take the quiz