HSE-246 · Lesson 8 of 12 · 25 min

Controls II: enclosures, negative air and decontamination

When asbestos work can release large numbers of fibres, source controls alone are not enough. High-risk work, such as Ontario's Type 3 operations, takes place inside a sealed enclosure kept under negative pressure, with HEPA-filtered exhaust and a decontamination facility through which every person and every bag of waste must pass. This lesson explains how enclosures are built, how negative air works and is sized, how decontamination facilities operate, and how supervisors inspect them. It describes the principles so that supervisors and other trades understand the system; building and running enclosures is work for trained, certified abatement crews.

What an enclosure does

An enclosure creates a sealed room around the work so that fibres released inside cannot escape into the rest of the building. It does three things. It contains the dust physically with plastic sheeting and sealed openings. It holds the inside at lower air pressure than the outside, so that any leak draws clean air in rather than letting dusty air out. And it controls the only ways in and out, through a decontamination facility for people and a waste load-out route for materials.

A plan view of a work area enclosure. The work area is sealed with polyethylene walls and floor. Two negative air units with HEPA filters exhaust air outdoors through ducts. Arrows show make-up air entering through the decontamination facility. The decontamination facility has three rooms in sequence: equipment and dirty change room, shower room, clean change room, each separated by overlapping curtain doors. A manometer shows the work area at minus 5 pascals (0.02 inches of water) relative to outside. A separate waste load-out with a washing area leads to a sealed bin.
A typical enclosure with negative air and a three-room decontamination facility. Air flows from clean areas toward the work area and out through HEPA filters.

Building the enclosure

Enclosure construction follows a standard sequence, set out in more detail in regulations and project specifications:

  • Prepare the area. Remove movable items, or clean and cover items that cannot be moved. Shut down, lock out and seal the building ventilation serving the area, and isolate electrical circuits that are not needed.
  • Seal openings with critical barriers. Cover windows, doors, vents, diffusers, pipe penetrations and other openings with polyethylene sheeting sealed with tape or spray adhesive.
  • Line floors and walls. Cover floors with polyethylene, turned up the walls, and cover walls with polyethylene so that the room can be cleaned and the sheeting removed as waste. Many specifications call for two layers on floors and walls.
  • Build entry and exit points. Attach the decontamination facility to the enclosure and provide a separate waste load-out where the project is large enough. Provide emergency exits that can be opened quickly, marked so that they are visible.
  • Install negative air units and run exhaust ducts outdoors, away from air intakes, windows and people, or into a filtered return where outdoor exhaust is impossible and the specification allows it.
  • Test and inspect. Start the negative air, check the pressure differential with a manometer, look for leaks with smoke tubes, and inspect the enclosure before work begins.

Enclosures must also allow safe work: lighting, emergency exits, fire extinguishers, ground-fault protected power, and planning for heat stress, because workers inside an enclosure in disposable coveralls and respirators can overheat quickly.

Negative air

A negative air unit, sometimes called a negative air machine or air filtration device, is a fan with a series of filters ending in a HEPA filter. It draws air out of the enclosure, filters it and exhausts it. Because more air leaves than enters by direct openings, the enclosure is held at a slightly lower pressure than its surroundings. Make-up air enters through the decontamination facility and any small leaks, flowing from clean to dirty areas.

Ontario's regulation requires indoor Type 3 enclosures, where the enclosure is not inside a building that is being demolished, to be kept at a negative pressure of 0.02 inches of water (about 5 pascals) relative to the area outside the enclosure, with HEPA-filtered exhaust and replacement air drawn from outside the enclosure, and with the pressure difference measured at regular intervals. The regulation does not set an air change rate, but specifications commonly require at least four to six air changes per hour, and many consultants specify more.

Sizing negative air

The number of negative air units needed depends on the enclosure volume, the required air changes per hour, and the delivered airflow of each unit. Delivered airflow is always lower than the rated airflow, because filters, ducts and bends add resistance, and it falls further as filters load. Specifications often derate units to about 70 to 80 per cent of their rated capacity for planning purposes.

import math

def units_needed(volume_m3, ach, unit_rating_m3h, derate=0.75):
    required = volume_m3 * ach                  # m3 per hour
    per_unit = unit_rating_m3h * derate
    return required, math.ceil(required / per_unit)

# Enclosure 12 m x 9 m x 3 m, a unit rated at 3,400 m3/h (about 2,000 cfm)
volume = 12 * 9 * 3
for ach in (4, 6, 8):
    req, n = units_needed(volume, ach, 3400)
    print(f"{ach} ACH: need {req:5.0f} m3/h ({req / 1.699:5.0f} cfm) -> {n} unit(s)")

# Air changes delivered by two units as filters load
for derate in (0.9, 0.75, 0.5):
    ach = 2 * 3400 * derate / volume
    print(f"two units at {derate:.0%} of rating: {ach:4.1f} air changes per hour")

# Pressure differential conversion
in_wc = 0.02
print(f"{in_wc} in w.c. = {in_wc * 249.09:.1f} Pa")
Output
4 ACH: need  1296 m3/h (  763 cfm) -> 1 unit(s)
6 ACH: need  1944 m3/h ( 1144 cfm) -> 1 unit(s)
8 ACH: need  2592 m3/h ( 1526 cfm) -> 2 unit(s)
two units at 90% of rating: 18.9 air changes per hour
two units at 75% of rating: 15.7 air changes per hour
two units at 50% of rating: 10.5 air changes per hour
0.02 in w.c. = 5.0 Pa

The script shows two practical points. First, the number of units depends heavily on the air change rate chosen, so the specification matters. Second, as filters load, delivered airflow can fall below the required rate even though nothing visibly changes. This is why pressure must be monitored, pre-filters changed often, and spare units kept on site.

What negative air does not do

Negative air keeps fibres from escaping the enclosure; it does not make the air inside the enclosure safe to breathe. Concentrations inside an active enclosure can be very high, so workers inside must wear the respirators required for the task. Negative air also does not replace wetting: fibres that never become airborne do not need to be filtered.

The decontamination facility

Every person leaving the enclosure is a possible carrier of fibres on skin, hair, clothing and equipment. The decontamination facility removes the contamination before the person reaches clean areas. A full facility has three rooms in sequence, each separated by curtained doorways made of overlapping polyethylene sheets that act as air locks.

The three rooms of a decontamination facility, in the order a worker passes through them when leaving.
RoomPurposeWhat happens there
Equipment and dirty change roomNext to the work area; contaminatedRemove gross contamination, HEPA vacuum or wipe coveralls, remove and bag disposable coveralls and footwear covers; keep the respirator on
Shower roomBetween dirty and clean sidesShower thoroughly, washing hair and body, with the respirator on until wet, then wash the respirator facepiece
Clean change roomNext to the outside; must stay cleanDry off, put on street clothes, store clean equipment; never enter in contaminated clothing

Ontario's regulation requires the decontamination facility for Type 3 operations to consist of a series of interconnected rooms in sequence, with curtained doorways: a room for changing out of protective clothing, a shower room with hot and cold water or water at a constant temperature between 40 and 50 °C and individual controls, and a clean room for street clothes. Every person leaving the work area must pass through each room, decontaminating clothing with a HEPA vacuum or damp wiping, placing disposable clothing in a waste container, showering and cleaning the respirator. Type 2 operations need no full decontamination facility, but workers must decontaminate their clothing and wash their hands and face before leaving.

Entry works in reverse: workers change into clean protective clothing in the clean room, pass through the shower room, and enter the work area through the equipment room. Respirators are put on and checked before entering the work area and stay on until the person is in the shower.

Waste load-out

Bags of waste must leave the enclosure without contaminating the decontamination facility or the route outside. On larger projects, a separate waste load-out has a washing area, where the outside of each bag is wet-wiped or HEPA vacuumed and placed inside a second clean bag, and a holding area. Waste is then carried directly to a sealed, labelled container or vehicle. On smaller projects without a load-out, waste passes through the decontamination facility only when no one is showering, and the bags are cleaned and double-bagged first. Lesson 11 covers waste handling in detail.

Inspecting enclosures

Ontario's regulation requires a competent worker to inspect the enclosure, barriers and decontamination facility at the beginning of each shift, at the end of a shift when no shift follows, and at least daily on days without shifts, and to repair defects immediately. Negative air units must be inspected before each use to make sure they do not leak, and damaged filters replaced.

An enclosure inspection checklist.
CheckWhat to look for
Barriers and wallsTears, loose tape, gaps at floors, ceilings and penetrations; sheeting pulled in by negative pressure is a good sign, billowing outward is not
Pressure differentialManometer reading at or below the required negative value; record readings
Negative air unitsRunning, pre-filters clean, HEPA filters intact, exhaust ducts sealed and discharging away from people and intakes
Decontamination facilityCurtains intact and overlapping, shower working with hot water, clean room clean, supplies stocked
HousekeepingDebris bagged, floors kept wet, no dry material accumulating, waste moved out promptly
Emergency readinessExits marked and unobstructed, fire extinguishers present, first aid and communication available

When things go wrong

Power failures, fan breakdowns or torn barriers can lead to loss of negative pressure. If negative pressure is lost, stop removal work, keep material wet, close the enclosure, restore negative air as quickly as possible (spare units should be on site), and do not open the enclosure to the outside until pressure is restored. If a barrier is breached and fibres may have escaped, the area outside should be assessed and cleaned under controlled conditions, and air monitoring may be needed. In a medical emergency, life safety comes first: injured workers are removed through the quickest route, and contamination is managed afterwards.

Worked problem

Sizing and checking an enclosure

An abatement contractor is setting up a Type 3 enclosure 15 m by 10 m with a 3.5 m ceiling to remove sprayed fireproofing. The specification requires six air changes per hour, and each negative air unit is rated at 3,400 m³/h, derated to 75 per cent. How many units are needed, and what pressure must the manometer show?

Show solution
  1. Volume = 15 × 10 × 3.5 = 525 m³.
  2. Required airflow = 525 × 6 = 3,150 m³/h.
  3. Delivered airflow per unit = 3,400 × 0.75 = 2,550 m³/h.
  4. Units needed = 3,150 ÷ 2,550 = 1.24, rounded up to 2 units; a third spare unit is good practice.
  5. The manometer must show at least 0.02 inches of water (about 5 Pa) negative relative to outside, checked at regular intervals.

Answer: Two units meet the requirement with some margin, and a spare protects against breakdowns and filter loading.

Common mistakes

  • MistakeTreating negative air as protection for the workers inside.

    InsteadNegative air prevents escape; workers inside still need the required respirators.

  • MistakeSizing negative air from the units' rated airflow.

    InsteadDerate for filters and ducts, monitor pressure and keep spares.

  • MistakeLeaving the enclosure through a side door to save time.

    InsteadEvery person must exit through the decontamination facility.

  • MistakeRemoving the respirator in the equipment room.

    InsteadKeep the respirator on until wet in the shower.

  • MistakeContinuing removal after negative pressure is lost.

    InsteadStop removal, keep material wet and restore negative air before continuing.

Summary and key terms

  • High-risk asbestos work takes place in sealed enclosures under negative pressure with HEPA-filtered exhaust.
  • Enclosures are built by preparing the area, sealing openings with critical barriers, lining floors and walls, adding decontamination and load-out, and testing.
  • Ontario requires indoor Type 3 enclosures to be held at 0.02 inches of water negative; specifications commonly require 4 to 6 or more air changes per hour.
  • Size negative air from volume and air change rate using derated delivered airflow, and keep spares.
  • Negative air prevents escape; it does not make the air inside safe to breathe.
  • A three-room decontamination facility (dirty room, shower, clean room) removes contamination from people leaving the enclosure.
  • Enclosures must be inspected each shift, and loss of pressure or breaches stop removal until fixed.
Enclosure
A sealed work area of polyethylene sheeting that contains fibres released during abatement.
Critical barrier
Sheeting that seals windows, doors, vents and other openings in the work area.
Negative air unit
A fan with HEPA filtration that exhausts air from an enclosure and keeps it under negative pressure.
Negative pressure
Air pressure inside the enclosure lower than outside, so leaks draw air in.
Air changes per hour (ACH)
The number of times the volume of air in an enclosure is replaced each hour.
Manometer
An instrument that measures the pressure difference between the enclosure and outside.
Make-up air
Air that enters the enclosure to replace air exhausted by the negative air units.
Decontamination facility
A series of rooms through which workers pass to remove contamination when leaving the work area.
Curtained doorway
Overlapping sheets of polyethylene acting as an air lock between rooms.
Waste load-out
A dedicated route with washing and bagging areas for removing waste from an enclosure.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. What three things does an enclosure do?

    Show answer

    Contains dust physically, holds the inside at negative pressure, and controls entry and exit.

  2. Why does negative pressure help if the enclosure leaks?

    Show answer

    Leaks draw clean air in rather than letting contaminated air out.

  3. What negative pressure does Ontario require for indoor Type 3 enclosures?

    Show answer

    0.02 inches of water, about 5 pascals, relative to outside.

  4. An enclosure of 300 m³ needs 6 ACH. What airflow is required?

    Show answer

    1,800 m³/h.

  5. Why should negative air units be derated in calculations?

    Show answer

    Filters, ducts and bends reduce delivered airflow below the rated value.

  6. Does negative air make the air inside the enclosure safe?

    Show answer

    No; workers inside still need respirators.

  7. List the three rooms of a decontamination facility in exit order.

    Show answer

    Equipment or dirty change room, shower room, clean change room.

  8. When should a worker remove their respirator when leaving?

    Show answer

    In the shower, once wet.

  9. What should happen if negative pressure is lost?

    Show answer

    Stop removal, keep material wet, keep the enclosure closed and restore negative air.

  10. Name three items on an enclosure inspection checklist.

    Show answer

    Barriers, pressure differential, negative air units, decontamination facility, housekeeping, emergency readiness (any three).

Lesson quiz · 5 questions

Score 60% or more to complete this lesson.