HSE-246 · Lesson 10 of 12 · 25 min
Air monitoring and clearance
Air monitoring tells you whether controls are working, whether workers have the right respirators, whether fibres are escaping the work area, and whether an area is clean enough to be reoccupied. This lesson explains the purposes and types of asbestos air sampling, how phase contrast microscopy counts fibres and what its results mean, why transmission electron microscopy is sometimes needed, and how clearance testing works. It is written to help supervisors and workers understand monitoring results, not to train air sampling technicians.
Why monitor
| Type of sampling | Purpose | Where and when |
|---|---|---|
| Personal sampling | Measure workers' exposure to check compliance with limits and confirm respirator selection | Sampler in the worker's breathing zone during the task |
| Background (pre-work) sampling | Establish fibre levels before work starts, for comparison later | In and around the work area before set-up |
| Perimeter or outside-enclosure sampling | Detect fibres escaping the work area | Outside the enclosure, near the decontamination facility and load-out, and at the exhaust discharge, during work |
| Clearance sampling | Confirm the area is clean enough to remove the enclosure and reoccupy | Inside the enclosure after cleaning and drying, before barriers come down |
Requirements for monitoring vary. Ontario's regulation requires clearance air testing after Type 3 removal of friable material inside a building and specifies how it is done, and many project specifications also require daily sampling outside the enclosure with stop-work triggers. BC requires air monitoring as part of the exposure control plan where needed to assess exposure and the effectiveness of controls. Results must be shared: in Ontario, clearance results must be posted at the workplace within 24 hours and given to the joint health and safety committee or representative.
Phase contrast microscopy (PCM)
Most asbestos air samples are analysed by phase contrast microscopy using NIOSH Method 7400. Air is drawn by a battery-powered pump through a 25-millimetre mixed cellulose ester filter held in a cassette with a conductive extension cowl. In the laboratory or a site lab, a wedge of the filter is made transparent and examined under a phase contrast microscope at about 400 times magnification. The analyst counts fibres in a set of graticule fields according to counting rules.
Under the A counting rules of NIOSH 7400, a fibre is counted if it is longer than 5 micrometres and has a length-to-width ratio of at least 3 to 1. A fibre lying entirely inside the graticule counts as one; a fibre with one end inside counts as a half; fibres crossing the graticule entirely, or with both ends outside, do not count. The analyst counts until 100 fibres have been counted or 100 fields examined, with a minimum of 20 fields.
PCM has an important limitation: it counts all fibres that meet the size rules, not only asbestos. Gypsum, cellulose, fibreglass, mineral wool and other fibres are counted too. PCM also cannot see the thinnest asbestos fibres, below about 0.25 micrometres wide. PCM results are therefore an index of fibre exposure that works well for comparing against the limits, which were set using PCM, but they cannot prove whether fibres are asbestos.
Calculating a PCM result
The laboratory converts the fibre count into a concentration. The fibre density on the filter (fibres per square millimetre) is the count per field, corrected for the blank, divided by the area of one graticule field. Multiplying by the effective area of the filter gives the total fibres collected, and dividing by the air volume gives the concentration.
Here \(C\) is the concentration in fibres per cubic centimetre, \(E\) the fibre density in fibres per square millimetre, \(A_c\) the effective collection area of the filter (about 385 mm² for a 25-mm filter), \(V\) the air volume in litres, \(F\) and \(n_f\) the fibre count and number of fields on the sample, \(B\) and \(n_b\) the count and fields on the blank, and \(A_f\) the field area (about 0.00785 mm² for a standard graticule).
A_C = 385.0 # mm2, effective collection area of a 25 mm filter
A_F = 0.00785 # mm2, area of one Walton-Beckett graticule field
def pcm_concentration(count, fields, volume_l, blank_count=0.0, blank_fields=100):
density = (count / fields - blank_count / blank_fields) / A_F # f/mm2
return density, density * A_C / (volume_l * 1000)
# Personal sample during wet removal: 2.0 L/min for 120 min
d, c = pcm_concentration(count=48.5, fields=40, volume_l=2.0 * 120, blank_count=1, blank_fields=100)
print(f"personal sample: density {d:6.1f} f/mm2, concentration {c:.3f} f/cc")
# Clearance sample: 10 L/min for 240 min = 2,400 L
d, c = pcm_concentration(count=9.5, fields=100, volume_l=2400, blank_count=1, blank_fields=100)
print(f"clearance sample: density {d:5.1f} f/mm2, concentration {c:.4f} f/cc -> "
f"{'pass' if c <= 0.01 else 'fail'} at 0.01 f/cc")
# Approximate limit of detection: about 7 f/mm2 by NIOSH 7400
lod_density = 7
for v in (240, 1200, 2400):
print(f"volume {v:5d} L: limit of detection about {lod_density * A_C / (v * 1000):.4f} f/cc")personal sample: density 153.2 f/mm2, concentration 0.246 f/cc clearance sample: density 10.8 f/mm2, concentration 0.0017 f/cc -> pass at 0.01 f/cc volume 240 L: limit of detection about 0.0112 f/cc volume 1200 L: limit of detection about 0.0022 f/cc volume 2400 L: limit of detection about 0.0011 f/cc
The output shows why clearance samples need large volumes. With only 240 litres, the method cannot reliably measure concentrations as low as 0.01 f/cc; with 2,400 litres, it can. Personal samples during work are smaller because filters overload when dust is heavy, and an overloaded filter cannot be counted.
Transmission electron microscopy (TEM)
Transmission electron microscopy uses an electron beam to see fibres far thinner than PCM can detect, and it identifies asbestos by its crystal structure and chemical composition. TEM can therefore tell asbestos fibres from other fibres and count structures that PCM misses. It is slower and more expensive than PCM. TEM methods include NIOSH 7402, which is used to determine what fraction of the fibres counted by PCM are asbestos, and the AHERA TEM method, which counts asbestos structures per square millimetre of filter and is used for clearance in schools.
TEM is useful when PCM results are high and it is suspected that non-asbestos fibres, such as gypsum or cellulose from demolition, are responsible, and when the strongest possible assurance of cleanliness is needed.
Clearance testing
Clearance testing is the final check before an enclosure is removed and the area is returned to use. It happens in a fixed sequence.
- Final cleaning. All visible debris is removed, and surfaces are HEPA vacuumed and wet wiped, often more than once.
- Visual inspection. A competent person or consultant inspects the area for any remaining debris or residue. Visible residue means the area fails before any air test.
- Drying and, in many specifications, lockdown. Surfaces are allowed to dry, and a lockdown encapsulant may be sprayed on surfaces from which asbestos was removed to bind any remaining fibres.
- Aggressive air sampling. Air is stirred with fans and leaf blowers directed at surfaces before and during sampling so that any settled fibres become airborne. Ontario's regulation requires forced air before and during PCM clearance sampling.
- Analysis and decision. Samples are analysed and compared with the clearance criteria. If the area fails, it is recleaned and retested.
Ontario's regulation sets the clearance criteria for Type 3 removal of friable material inside a building. Samples may be analysed by PCM (NIOSH 7400) or TEM (NIOSH 7402). For PCM, at least 2,400 litres of air must be drawn through each filter, and the area passes only if every sample is 0.01 f/cc or less; samples that fail by PCM may be re-analysed by TEM against the same limit. Alternatively, at least five samples inside and five outside the enclosure can be analysed by TEM, and the area passes if the inside average is statistically lower than, or not different from, the outside average. The number of samples depends on the enclosure size, from two for small enclosures to five for large ones, under Table 3 of the regulation.
Interpreting results as a supervisor
Supervisors do not need to analyse filters, but they should be able to read a monitoring report and act on it. Useful questions include:
- Was the sample personal or area, and what task was under way?
- What was the sampling time and volume, and was the result above the limit of detection?
- Is the result compared with the right limit: 8-hour limit, excursion limit, respirator MUC or clearance criterion?
- Do outside-enclosure results show any rise, which would suggest a leak?
- Were PCM results high enough that TEM analysis is needed to tell asbestos from other fibres?
A rising trend outside the enclosure, or personal results approaching the respirator MUC, should lead to action: stopping work, checking barriers and negative air, improving wetting, or upgrading respirators.
Worked problem
Reading a clearance report
Five PCM clearance samples were taken in a 300 m² enclosure after removal of sprayed fireproofing, each with 2,400 L of air. Results were 0.004, 0.006, 0.012, 0.005 and 0.003 f/cc. Does the area pass?
Show solution
- Ontario's PCM criterion requires every sample to be 0.01 f/cc or less.
- One sample, 0.012 f/cc, exceeds 0.01 f/cc, so the area does not pass, even though the average is below 0.01 f/cc.
- The failing sample could be re-analysed by TEM; if the TEM result is 0.01 f/cc or less, the area passes. Otherwise, the area must be recleaned and retested.
- The results must be posted within 24 hours and given to the joint committee or representative.
Answer: The area fails on PCM because one sample exceeds 0.01 f/cc. Averaging does not rescue a failing sample under these criteria.
Quality in air sampling
Air sampling results are only as good as the way samples are collected and analysed. Sampling pumps must be calibrated with the sampling cassette in line before and after each sample, and samples whose flow changed by more than the method allows are invalid. Field blanks, cassettes taken to the site and handled like samples but with no air drawn through them, detect contamination of filters. Each sample needs a record of the location, worker or area, start and stop times, flow rate and task, and a chain of custody that follows the sample to the laboratory.
PCM analysts should be trained, for example through the NIOSH 582 course or an equivalent, and laboratories should take part in proficiency testing programs such as those run by the American Industrial Hygiene Association. Project specifications often require the consultant's analysts to be on site so that results are available the same day, which allows problems to be fixed during the work rather than discovered afterwards.
Sharing results with workers
Workers have a right to know the results of air monitoring that concerns them. Post or distribute personal and area results promptly, explain what they mean in plain language, and give copies to the joint health and safety committee or representative. Results that show controls are not working should lead to visible action, so workers can see that monitoring is used to protect them and not only to fill a file.
Common mistakes
MistakeTreating PCM results as proof that fibres are asbestos.
InsteadPCM counts all fibres meeting the size rules; use TEM to identify asbestos.
MistakeTaking clearance samples with small air volumes.
InsteadUse the required volume, such as 2,400 litres per PCM filter, so the method can measure low levels.
MistakeClearance testing before the area is dry or visually clean.
InsteadComplete cleaning, visual inspection and drying first.
MistakeSampling clearance air without stirring it.
InsteadUse aggressive sampling with forced air so settled fibres are measured.
MistakeAveraging away a failing clearance sample.
InsteadUnder PCM criteria, every sample must meet the limit.
Summary and key terms
- Air monitoring checks exposure, respirator selection, containment and final cleanliness.
- PCM by NIOSH 7400 counts fibres longer than 5 micrometres with a 3 to 1 aspect ratio, but cannot identify asbestos.
- Concentration equals fibre density times filter area divided by air volume; larger volumes give lower limits of detection.
- TEM sees thinner fibres and identifies asbestos, and is used when PCM results are ambiguous or for school clearance.
- Clearance follows cleaning, visual inspection, drying and aggressive sampling.
- Ontario requires every PCM clearance sample to be 0.01 f/cc or less with at least 2,400 litres per filter, or a TEM inside-outside comparison.
- Supervisors should check sample type, volume, limit of detection and the right comparison limit, and act on rising trends.
- Phase contrast microscopy (PCM)
- A light microscopy method that counts fibres on air sample filters.
- NIOSH 7400
- The standard PCM method for counting airborne fibres.
- Transmission electron microscopy (TEM)
- An electron microscopy method that identifies and counts asbestos structures.
- Graticule
- A calibrated circle in the microscope eyepiece defining the counting field.
- Aspect ratio
- The ratio of a fibre's length to its width.
- Limit of detection
- The lowest concentration a method can reliably detect.
- Personal sample
- An air sample taken in a worker's breathing zone.
- Clearance sampling
- Air sampling after cleaning to confirm an area can be reoccupied.
- Aggressive sampling
- Sampling while air is stirred by fans or blowers to resuspend settled fibres.
- Lockdown encapsulant
- A coating applied after removal to bind residual fibres on surfaces.
Practice problems
Work each problem on paper first, then reveal the answer to check.
Name the four main types of asbestos air sampling.
Show answer
Personal, background, perimeter or outside-enclosure, and clearance sampling.
Which particles count as fibres under NIOSH 7400 A rules?
Show answer
Particles longer than 5 micrometres with a length-to-width ratio of at least 3 to 1.
Why can PCM not prove that fibres are asbestos?
Show answer
It counts all fibres meeting the size rules, including gypsum, cellulose and glass fibres.
A filter has a density of 30 f/mm² from 2,400 L. What is the concentration?
Show answer
30 × 385 ÷ (2,400 × 1,000) ≈ 0.0048 f/cc.
Why do clearance samples need large air volumes?
Show answer
To lower the limit of detection so concentrations around 0.01 f/cc can be measured.
What does TEM do that PCM cannot?
Show answer
Sees very thin fibres and identifies asbestos by structure and composition.
What must happen before clearance air sampling?
Show answer
Final cleaning, visual inspection with no residue, and drying.
What is aggressive sampling?
Show answer
Sampling while fans or blowers stir the air to resuspend settled fibres.
What is Ontario's PCM clearance criterion?
Show answer
Every sample 0.01 f/cc or less, with at least 2,400 L per filter.
What should a rising trend in outside-enclosure samples prompt?
Show answer
Stopping work and checking barriers, negative air and wetting.
Lesson quiz · 5 questions
Score 60% or more to complete this lesson.
Create a free account to save your progress, take quizzes and earn a certificate.