ACCT-102 · Lesson 11 of 12 · 30 min

Flexible budgets, standard costs and variance analysis

A budget earns its keep when actual results come in. Comparing actual results with the plan tells managers whether things went well or badly, but only if the comparison is fair. If Cedar Ridge sold more chairs than planned, its costs will naturally exceed the budget; that is not inefficiency. This lesson shows how flexible budgets make the comparison fair by adjusting the budget to the actual level of activity, how standard costs provide per-unit benchmarks, and how variance analysis splits each difference into a price part and a quantity part so that managers know where to look. It applies all of this to Cedar Ridge's chair line for the year just ended. ACCT-222 extends the analysis to sales mix, materials mix and yield variances.

Static and flexible budgets

A static budget is prepared for one planned level of activity, such as the 7,000 chairs in the master budget of lesson 10. A flexible budget shows what revenues and costs should have been for the actual level of activity, using the same cost formulas: variable costs at the budgeted rate per unit times actual units, and fixed costs at the budgeted amount. Comparing actual results with the flexible budget removes the effect of volume and isolates how well prices and costs were controlled.

The flexible budget restates the plan for the actual volume of 7,100 chairs sold.
Cost formulaStatic budget (7,000 chairs)Flexible budget (7,100 chairs)
Sales at $180 per chair$1,260,000$1,278,000
Variable costs at $108 per chair$756,000$766,800
Contribution margin$504,000$511,200
Fixed costs$360,000$360,000
Operating income$144,000$151,200

Last year Cedar Ridge sold 7,100 chairs, 100 more than planned, at an average price of $177 after discounts given to win a large retailer. Actual variable costs were $112.50 per chair ($106.30 of variable manufacturing cost and $6.20 of variable selling cost), and actual fixed costs were $366,000. Actual operating income was $91,950, $52,050 below the static budget. The flexible budget explains why.

# Flexible budget performance report (illustrative)
budget_units, actual_units = 7_000, 7_100
p_std, v_std, fixed_std = 180, 108, 360_000
p_act, v_act, fixed_act = 177, 112.50, 366_000

def income(units, p, v, fixed):
    return units * p - units * v - fixed

static = income(budget_units, p_std, v_std, fixed_std)
flexible = income(actual_units, p_std, v_std, fixed_std)
actual = income(actual_units, p_act, v_act, fixed_act)

print(f"Static budget income    ${static:>10,.0f}")
print(f"Flexible budget income  ${flexible:>10,.0f}")
print(f"Actual income           ${actual:>10,.0f}")
print(f"Sales-volume variance   ${flexible - static:>+10,.0f}")
print(f"Flexible-budget variance${actual - flexible:>+10,.0f}")
print(f"  Selling price         ${(p_act - p_std) * actual_units:>+10,.0f}")
print(f"  Variable costs        ${-(v_act - v_std) * actual_units:>+10,.0f}")
print(f"  Fixed costs           ${-(fixed_act - fixed_std):>+10,.0f}")
Output
Static budget income    $   144,000
Flexible budget income  $   151,200
Actual income           $    91,950
Sales-volume variance   $    +7,200
Flexible-budget variance$   -59,250
  Selling price         $   -21,300
  Variable costs        $   -31,950
  Fixed costs           $    -6,000

The static-budget variance of $52,050 unfavorable splits into two parts. The sales-volume variance of $7,200 favorable is the extra contribution margin from selling 100 more chairs than planned (100 × $72). The flexible-budget variance of $59,250 unfavorable is the difference between actual income and what income should have been at 7,100 chairs, and it is the part that reflects how well the business was run: $21,300 from lower selling prices (7,100 × $3), $31,950 from higher variable costs (7,100 × $4.50) and $6,000 from higher fixed costs. A variance is favorable (F) when it increases income relative to the budget and unfavorable (U) when it decreases income. Favorable does not automatically mean good, nor unfavorable bad: the price discounts may have been a deliberate trade for the extra volume.

Diagram: static budget variance at the top splits into a sales-volume variance and a flexible-budget variance; the flexible-budget variance splits into selling price, variable cost and fixed cost variances; variable cost variances split further into price and quantity variances for materials, labor and variable overhead.
Levels of variance analysis. Each level explains the one above it in more detail.

Standard costs

To dig into the $31,950 of variable cost variance, managers need per-unit benchmarks for each input. A standard cost is the predetermined cost of making one unit under efficient operating conditions, built from a quantity standard (how much of each input should be used) and a price standard (how much each unit of input should cost). Standards are set with engineers, purchasing staff and supervisors, using time studies, past performance, supplier quotes and expected changes. Ideal standards assume perfect efficiency with no waste or downtime; practical (attainable) standards allow for normal waste, breaks and machine downtime. Most companies use practical standards, because ideal standards are rarely met and can discourage workers.

The Classic chair's standard cost card. The fixed overhead rate is budgeted fixed overhead of $216,000 ÷ 10,800 hours at the normal volume of 7,200 chairs.
InputStandard quantityStandard priceStandard cost per chair
Direct materials (hardwood)5 board feet$12 per board foot$60
Direct labor1.5 hours$20 per hour$30
Variable manufacturing overhead1.5 direct labor hours$8 per hour$12
Fixed manufacturing overhead1.5 direct labor hours$20 per hour$30
Total standard manufacturing cost$132

Standard costs serve several purposes beyond variance analysis. They simplify bookkeeping, because inventory can be carried at standard; they support pricing and budgeting; and they communicate expectations to workers and supervisors. Lean manufacturers sometimes criticize standard costing for encouraging large batches and focusing on labor efficiency in automated plants, and many supplement it with non-financial measures such as defect rates and on-time delivery (lesson 12).

The general model for variable cost variances

Every variable input variance can be split into a price (rate or spending) variance and a quantity (usage or efficiency) variance. The price variance compares the actual price with the standard price for the actual quantity used. The quantity variance compares the actual quantity used with the standard quantity allowed for the actual output, valued at the standard price. The standard quantity allowed is what should have been used for the units actually produced.

\[\text{Price variance} = (AP - SP) \times AQ \qquad \text{Quantity variance} = (AQ - SQ) \times SP\]

In the formulas AP is the actual price per unit of input, SP the standard price, AQ the actual quantity used and SQ the standard quantity allowed for actual output. A positive result is unfavorable (actual exceeded standard) and a negative result favorable. Last year the chair line produced 7,000 chairs; it sold 7,100 by drawing 100 chairs from inventory. Production data were as follows.

Actual production results for the year (illustrative).
Actual production data (7,000 chairs produced)Amount
Hardwood purchased and used36,400 board feet at $12.40 = $451,360
Direct labor10,200 hours at $20.50 = $209,100
Variable manufacturing overhead$83,640
Fixed manufacturing overhead$219,000
Standard quantities allowed for 7,000 chairs35,000 board feet; 10,500 direct labor hours
# Standard cost variances for 7,000 chairs (illustrative)
output = 7_000
std = {"bf": 5, "bf_price": 12, "hours": 1.5, "rate": 20, "voh": 8}
act = {"bf": 36_400, "bf_price": 12.40, "hours": 10_200, "rate": 20.50, "voh_cost": 83_640}

sq_bf = output * std["bf"]
sq_hours = output * std["hours"]

def show(name, value):
    print(f"{name:<34}${abs(value):>9,.0f} {'U' if value > 0 else 'F'}")

show("Materials price variance", (act["bf_price"] - std["bf_price"]) * act["bf"])
show("Materials quantity variance", (act["bf"] - sq_bf) * std["bf_price"])
show("DL rate variance", (act["rate"] - std["rate"]) * act["hours"])
show("DL efficiency variance", (act["hours"] - sq_hours) * std["rate"])
show("Variable overhead spending variance", act["voh_cost"] - act["hours"] * std["voh"])
show("Variable overhead efficiency variance", (act["hours"] - sq_hours) * std["voh"])
total = (act["bf"] * act["bf_price"] + act["hours"] * act["rate"] + act["voh_cost"]
         - output * (std["bf"] * std["bf_price"] + std["hours"] * std["rate"] + std["hours"] * std["voh"]))
show("Total variable manufacturing variance", total)
Output
Materials price variance          $   14,560 U
Materials quantity variance       $   16,800 U
DL rate variance                  $    5,100 U
DL efficiency variance            $    6,000 F
Variable overhead spending variance$    2,040 U
Variable overhead efficiency variance$    2,400 F
Total variable manufacturing variance$   30,100 U

Interpreting materials variances

The materials price variance of $14,560 unfavorable says that hardwood cost 40 cents more per board foot than the standard. That is usually the purchasing manager's responsibility, but the cause may lie elsewhere: a general rise in lumber prices, a rush order that required air freight, or a decision to buy a better grade. The materials quantity variance of $16,800 unfavorable says that 1,400 more board feet were used than 7,000 chairs should need. That is usually the production supervisor's responsibility, but again the cause matters: inexperienced workers, poorly maintained saws, or poor-quality wood bought cheaply. Variances in different areas are often linked, which is why managers investigate before assigning blame.

Worked problem

Linked variances

Suppose the purchasing manager had instead bought a cheaper, knottier grade of hardwood at $11.50 per board foot and production then used 38,500 board feet. Compute the materials variances. What do they suggest?

Show solution
  1. Price variance = ($11.50 − $12.00) × 38,500 = $19,250 favorable.
  2. Quantity variance = (38,500 − 35,000) × $12 = $42,000 unfavorable.
  3. Net materials variance = $22,750 unfavorable.
  4. The favorable price variance is outweighed by extra waste: the cheaper grade cost more overall.

Answer: Purchasing looks good and production looks bad, but the root cause is the purchasing decision. Evaluating managers on single variances can encourage choices that hurt the company.

When materials are purchased in one period and used in another, the materials price variance is usually computed when the materials are purchased, on the quantity purchased, so that price problems are spotted early and raw materials inventory can be carried at standard. The quantity variance is computed on the quantity used.

Interpreting labor and variable overhead variances

The labor rate variance of $5,100 unfavorable arose because the average wage paid was 50 cents above standard, perhaps because of a negotiated wage increase not reflected in the standard, or because more senior workers were assigned to simple tasks. The labor efficiency variance of $6,000 favorable says the chairs took 300 fewer hours than the standard allows, perhaps because a new jig speeded assembly, or because the experienced workers who earned higher rates also worked faster. In that case the two labor variances are two sides of one staffing decision, netting to $900 favorable.

Variable overhead is applied on direct labor hours, so its efficiency variance moves with the labor efficiency variance: saving 300 hours also saved the variable overhead those hours would have caused, $2,400 favorable. The variable overhead spending variance of $2,040 unfavorable shows that, for the hours actually worked, more was spent on items such as power and supplies than the $8-per-hour rate allows. Investigating it means looking at the individual overhead items, comparing each with its flexible budget amount.

Summary of the year's variable cost variances.
VarianceAmountUsually responsiblePossible causes
Materials price$14,560 UPurchasingMarket price rise, rush orders, grade choice, freight
Materials quantity$16,800 UProductionWaste, defective wood, untrained staff, poor maintenance
Labor rate$5,100 UProduction and HRWage increases, overtime premiums, skill mix
Labor efficiency$6,000 FProductionBetter methods or jigs, experienced staff, fewer delays
Variable overhead spending$2,040 UProductionHigher power or supply prices, waste of supplies
Variable overhead efficiency$2,400 FProductionFollows labor efficiency because overhead is applied on hours
Horizontal bar chart of the year's variances: materials price 14,560 and materials quantity 16,800 unfavorable, direct wage rate 5,100 unfavorable, wage efficiency 6,000 favorable, variable overhead spending 2,040 unfavorable, variable overhead efficiency 2,400 favorable, fixed overhead budget 3,000 unfavorable and volume 6,000 unfavorable.
Last year's production variances. Unfavorable variances extend to the right, favorable to the left; the hardwood variances dominate.

Fixed overhead variances

Fixed overhead does not change with output in the short run, so it is analyzed differently. The budget (spending) variance compares actual fixed overhead with budgeted fixed overhead: $219,000 − $216,000 = $3,000 unfavorable. It is controllable in the usual sense and is investigated item by item. The production volume variance compares budgeted fixed overhead with the fixed overhead applied to production at the standard rate: applied overhead is 10,500 standard hours × $20 = $210,000, so the volume variance is $216,000 − $210,000 = $6,000 unfavorable.

\[\text{Volume variance} = \text{Budgeted fixed overhead} - (\text{Standard hours allowed} \times \text{Fixed overhead rate})\]

The volume variance is not a measure of spending control. It arises because the plant produced 7,000 chairs rather than the 7,200 used to set the fixed overhead rate, so 200 chairs' worth of capacity cost ($6,000) was not absorbed into inventory. It is useful as a signal of unused capacity, which managers may be able to sell (lesson 9) or reduce, but treating it as a manager's failure can encourage overproduction, as lesson 8 warned. Together the two fixed overhead variances equal the underapplied fixed overhead of $9,000 ($219,000 actual against $210,000 applied).

# Fixed overhead variances (illustrative)
budget_foh, actual_foh = 216_000, 219_000
rate = budget_foh / 10_800            # $20 per hour at normal volume (7,200 chairs)
applied = 7_000 * 1.5 * rate          # standard hours allowed for actual output

print(f"Budget variance   ${actual_foh - budget_foh:,.0f} U")
print(f"Volume variance   ${budget_foh - applied:,.0f} U")
print(f"Underapplied fixed overhead ${actual_foh - applied:,.0f}")
Output
Budget variance   $3,000 U
Volume variance   $6,000 U
Underapplied fixed overhead $9,000

Management by exception and investigating variances

Managers cannot investigate every variance. Management by exception directs attention to variances that are large, either in dollars or as a percentage of the standard, that recur or trend in one direction, that involve controllable costs, or that are favorable by an amount that seems too good to be true (perhaps a quality corner being cut). Statistical control charts, borrowed from quality management (BUS-230 lesson 8), can distinguish random fluctuation from a real shift. The cost of investigating should be weighed against the expected benefit of correcting a problem.

Worked problem

Which variances deserve attention?

Cedar Ridge's controller investigates any variance above 5 percent of the related flexible budget amount or above $10,000. Which of the year's variances qualify?

Show solution
  1. Materials flexible budget = 35,000 × $12 = $420,000; price variance $14,560 (3.5%) exceeds $10,000; quantity variance $16,800 (4.0%) exceeds $10,000.
  2. Labor flexible budget = 10,500 × $20 = $210,000; rate variance $5,100 (2.4%) and efficiency variance $6,000 (2.9%) are below both limits.
  3. Variable overhead flexible budget = $84,000; spending $2,040 (2.4%) is below both limits.
  4. Fixed overhead budget variance $3,000 (1.4%) is below both limits.

Answer: Investigate the two materials variances first; review the labor variances together because they may share a cause.

Standard costing systems often record variances in the ledger: inventory is debited at standard, and each variance has its own account, debited when unfavorable and credited when favorable. At year end, small variances are closed to cost of goods sold, and large ones may be prorated among inventories and cost of goods sold, as with under- or overapplied overhead in lesson 5. The detailed entries are covered in ACCT-222.

Common mistakes

  • MistakeComparing actual costs with the static budget when volume changed.

    InsteadCompare with a flexible budget for the actual activity level.

  • MistakeComputing quantity variances with the actual output's budgeted quantity rather than the standard quantity allowed.

    InsteadSQ is the standard quantity for the units actually produced.

  • MistakeTreating every favorable variance as good.

    InsteadFavorable price variances may cause unfavorable quantity variances; look for links and quality effects.

  • MistakeBlaming the production manager for the volume variance.

    InsteadThe volume variance reflects capacity use, not spending control.

  • MistakeInvestigating every variance regardless of size.

    InsteadUse management by exception: focus on large, recurring or controllable variances.

Summary and key terms

  • A flexible budget restates the plan for the actual level of activity.
  • The static-budget variance splits into a sales-volume variance and a flexible-budget variance.
  • Standard costs are built from quantity and price standards; practical standards are most common.
  • Price variance = (AP − SP) × AQ; quantity variance = (AQ − SQ) × SP.
  • Materials, labor and variable overhead variances often share causes and should be read together.
  • Fixed overhead has a budget variance (controllable) and a volume variance (capacity use).
  • Management by exception focuses investigation on significant, recurring or controllable variances.
Static budget
A budget prepared for one planned level of activity.
Flexible budget
A budget adjusted to the actual level of activity using cost formulas.
Sales-volume variance
The difference between flexible and static budget results caused by the volume of sales.
Flexible-budget variance
The difference between actual results and the flexible budget.
Standard cost
The predetermined cost of producing one unit under efficient conditions.
Practical standard
A standard achievable with normal waste and downtime.
Price variance
The difference between actual and standard price multiplied by the actual quantity.
Quantity variance
The difference between actual and standard quantity allowed multiplied by the standard price.
Production volume variance
Budgeted fixed overhead minus fixed overhead applied to actual output.
Management by exception
Focusing management attention on significant deviations from plan.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. A company planned 10,000 units with variable cost $15 each and fixed costs $50,000. Actual output was 11,000. What is the flexible budget total cost?

    Show answer

    11,000 × $15 + $50,000 = $215,000.

  2. Actual materials: 23,000 kg at $4.10; standard 2 kg per unit at $4; 11,000 units made. Compute the price and quantity variances.

    Show answer

    Price $2,300 U; quantity (23,000 − 22,000) × $4 = $4,000 U.

  3. Actual labor: 16,000 hours at $25.50; standard 1.5 hours per unit at $26; 11,000 units. Compute the rate and efficiency variances.

    Show answer

    Rate $8,000 F; efficiency (16,000 − 16,500) × $26 = $13,000 F.

  4. Budgeted fixed overhead is $90,000 at 15,000 normal hours. Standard hours allowed are 16,500. Compute the volume variance.

    Show answer

    Rate $6; applied $99,000; volume variance $9,000 F.

  5. Why might a favorable materials price variance be bad news?

    Show answer

    Cheaper, lower-quality materials may cause waste, rework or customer complaints.

  6. Who is usually responsible for a labor efficiency variance?

    Show answer

    The production supervisor, though causes may lie with materials or equipment.

  7. What does a sales-volume variance measure?

    Show answer

    The effect on income of selling more or fewer units than planned, at budgeted margins.

  8. Give two criteria for deciding which variances to investigate.

    Show answer

    Size in dollars or percentage, recurrence or trend, controllability, apparent quality trade-offs.

  9. Why does the variable overhead efficiency variance follow the labor efficiency variance at Cedar Ridge?

    Show answer

    Variable overhead is applied on direct labor hours, so hours saved also save overhead.

  10. Change the variance program so 35,800 board feet were used at $12.40. What are the new materials variances?

    Show answer

    Price $14,320 U; quantity $9,600 U.

Lesson quiz · 5 questions

Score 60% or more to complete this lesson.