Marcel Ouellet's Monday evening sessions in INS-320 taught Devon, Tessa and Priya how to read a hygrometer, find a dew point and check whether a cold surface would sweat. At the end of the last session, Marcel told them that the full thickness calculation would come later, "when Raj gets hold of you". Raj's chance came with an item near the end of Thea Okerlund's audit: Kellerton's budget for 2027 includes replacing a run of the low-temperature ammonia suction main in the engine room, and Anika Varga wanted to know what thickness the new insulation would need. "For cold work, energy is almost never the question," Raj said. "The question is whether water forms on the outside. Get that wrong and nothing else matters."

This lesson develops the condensation control calculation: the design conditions to use, the dew point and the margin, how to find the surface temperature of a cold insulated pipe, and how to choose the thickness that keeps it dry. It shows why a shiny jacket needs more insulation on cold work, and why thickness alone never stops moisture getting into the insulation.

What the calculation must prevent

Water forms on any surface colder than the dew point of the air around it. On an insulated cold pipe there are two places it can happen. The first is the outside of the jacket: if the jacket is below the dew point, it sweats, drips and stains the ceiling or floor, and wet jackets corrode. The thickness calculation prevents this. The second is inside the insulation, where water vapour driven in by the vapour pressure difference condenses and freezes as it nears the cold pipe, as INS-320 explained. Thickness does not prevent that; only a continuous, sealed vapour retarder does. Both must be right.

The calculation therefore answers one question: what thickness keeps the outer surface at or above the dew point, plus a margin, at the design conditions?

Design conditions and margin

The design conditions are the air temperature and relative humidity the surface must tolerate, usually the worst combination expected in the space. They come from the specification, or from the owner and engineer for plant work. Typical choices are:

Typical design conditions for condensation control. Always use the specification or the owner's values where they are given.
LocationTypical design condition
Conditioned office ceiling space24 °C (75 °F), 50 in 100 relative humidity
Mechanical room, unconditioned27 to 32 °C (80 to 90 °F), 60 to 80 in 100
Refrigeration engine room in summer30 to 32 °C (86 to 90 °F), 70 to 80 in 100
Outdoors in a humid summer climatelocal design data; often 80 to 90 in 100 at a moderate temperature
Washdown or food processing areaup to 90 in 100 or more

Because humidity varies and instruments and insulation are not perfect, calculations add a margin: the surface must be some degrees above the dew point, not just at it. INS-320 used 2 K (4 °F) for Carrow Park, a common choice. Some specifications use more.

Kellerton's engine room design condition, from Anika, is 32 °C and 70 in 100 relative humidity, the worst summer afternoon with the doors closed and the compressors running.

Worked problem

Dew point by the Magnus formula

Find the dew point of air at 32 °C and 70 in 100 relative humidity, using the Magnus formula from INS-320 with constants 17.62 and 243.12 °C.

Show solution
  1. γ = ln(RH) + 17.62 T ÷ (243.12 + T) = ln 0.70 + 17.62 × 32 ÷ 275.12 = −0.3567 + 2.0494 = 1.6928.
  2. Dew point = 243.12 γ ÷ (17.62 − γ) = 243.12 × 1.6928 ÷ 15.9272 = 25.8 °C.
  3. Required surface temperature with a 2 K margin: 25.8 + 2 = 27.8 °C.

Answer: The jacket must stay at or above about 27.8 °C.

A moist room leaves very little room: at 70 in 100 relative humidity, the dew point is only about 6 K below the air temperature, and the margin takes a third of that. In a drier room the job is much easier.

The surface temperature of a cold pipe

The calculation is the same as for a hot pipe, from lesson 2, with the heat flowing inward. The heat gain per unit length is still (Tₚ − Tₐ) ÷ (Rᵢₙₛ + Rₛ), which comes out negative because the pipe is colder than the air, and the surface temperature is still Tₛ = Tₐ + q Rₛ, which comes out below the air temperature. Two differences from hot work matter:

  • The temperature difference across the surface film is small, only a few degrees, so convection is weak and radiation, which depends on emittance, carries most of the heat. That makes the jacket choice even more important than on hot work.
  • The conductivity is taken at a low mean temperature, often below freezing, where most insulations conduct less than at room temperature. Data sheets list values at low mean temperatures for cold-service materials such as cellular glass, polyisocyanurate and elastomeric foam.

Worked problem

The ammonia suction main

The new suction main is NPS 6 (outside diameter 168.3 mm) carrying ammonia at −34 °C. Raj tries 38 mm of polyisocyanurate, typical k = 0.024 W/m·K at its mean temperature, with a PVC jacket (emittance 0.90), in air at 32 °C. Find the surface temperature and check it against the 27.8 °C required.

Show solution
  1. Radii: r₁ = 84.15 mm, r₂ = 122.15 mm; D₂ = 0.2443 m.
  2. Rᵢₙₛ = ln(122.15 ÷ 84.15) ÷ (2π × 0.024) = 0.3726 ÷ 0.1508 = 2.471 m·K/W.
  3. Iteration 1: guess Tₛ = 28 °C. hc = 2.66, hr = 5.69, h = 8.34 W/m²·K; Rₛ = 1 ÷ (8.34 × π × 0.2443) = 0.156.
  4. q = (−34 − 32) ÷ (2.471 + 0.156) = −66 ÷ 2.627 = −25.1 W/m (a heat gain of 25.1 W/m).
  5. Tₛ = 32 + (−25.1 × 0.156) = 28.1 °C.
  6. Iteration 2 gives the same result. Check: 28.1 °C is above the 27.8 °C required.

Answer: 38 mm of polyisocyanurate with a PVC jacket passes at the design condition, with a little margin to spare.

Look at how much of the surface coefficient is radiation: 5.69 of 8.34. On a cold surface only a few degrees below the air, convection is weak, and the surroundings, the walls, ceiling and other equipment, warm the jacket by radiation. That is why the emittance matters so much.

Choosing the thickness, and the jacket

Repeating the calculation for each standard thickness, with both kinds of jacket, gives the full picture:

Surface temperature of an NPS 6 ammonia suction main at −34 °C with polyisocyanurate (k = 0.024), in air at 32 °C and 70 in 100 relative humidity. Required: 27.8 °C.
ThicknessPVC jacket (ε = 0.90)Aluminum jacket (ε = 0.10)
25 mm26.1 °C (fails)20.8 °C (fails)
38 mm28.1 °C (passes)23.9 °C (fails)
51 mm29.1 °C25.7 °C (fails)
64 mm29.7 °C26.8 °C (fails)
76 mm30.1 °C27.5 °C (fails)
89 mm30.4 °C28.1 °C (passes)
102 mm30.6 °C28.5 °C
A chart of jacket surface temperature against insulation thickness for a cold ammonia line. Two rising curves approach the room temperature: the upper one for a PVC jacket, the lower one for an aluminum jacket. A horizontal band marks the dew point plus the margin. The PVC curve crosses the band at about 38 mm, the aluminum curve not until about 89 mm.
On cold work, a shiny jacket needs far more insulation to stay above the dew point.

The answer surprised Priya: with an aluminum jacket, the same main needs 89 mm of insulation, more than twice the PVC thickness. The reason is the one above. The aluminum jacket receives less radiant heat from the warm room, so it runs colder. On hot work a shiny jacket gives a hotter surface; on cold work it gives a colder one, and in both cases that is the wrong direction.

Engine rooms often use aluminum jackets anyway, for their durability and fire performance, so the design must use the thicker insulation or an aluminum jacket with a painted or high-emittance finish, which behaves more like PVC. Raj noted both options for Anika and recommended the thicker system with aluminum, matching the rest of Kellerton's engine room, because the ammonia lines are struck by forklifts and cleaned with hoses. INS-320's Carrow Park plant room used 76 mm (3 in) of cellular glass with aluminum jacket, at a milder design condition of 30 °C and 50 in 100.

Heat gain and energy on cold work

Condensation usually governs cold work, but the heat gain still costs money: every watt that leaks into a refrigerated line must be removed by the refrigeration system, which uses electricity to do it. At low temperatures the system's coefficient of performance (COP), the heat removed per unit of electricity, is low; INS-320 used about 1.8 at −34 °C (−30 °F).

Worked problem

The cost of the heat gain

A 30 m run of the suction main with 38 mm of polyisocyanurate gains 25.1 W/m. The system runs 7,550 hours a year with a COP of 1.8. About how much electricity does the heat gain cost each year?

Show solution
  1. Heat gain: 25.1 × 30 = 753 W.
  2. Electricity: 753 ÷ 1.8 = 418 W, running 7,550 h: 418 × 7,550 ÷ 1,000 = 3,160 kWh a year.

Answer: About 3,160 kWh a year: small for one run, but cold systems in a large plant add up, and wet insulation can multiply the gain several times.

Thickness is not enough

A condensation calculation assumes dry insulation. If the vapour retarder is broken, vapour moves into the insulation, condenses, freezes and keeps building, and the wet insulation conducts heat many times better than dry. The surface temperature then falls, the jacket sweats in spite of the correct thickness, and the problem gets worse every season. INS-110's iced suction line at Kellerton and INS-320's resurfacer room line at Carrow Park were both failures of the vapour retarder, not of thickness. Every cold system therefore needs:

  • A low-permeance vapour retarder, continuous and sealed at every joint, as INS-320 described.
  • Vapour stops at intervals and at every fitting, so that damage stays local.
  • Sealed penetrations at hangers, supports and through walls, with high-density inserts that keep the retarder continuous.

On cold work, the calculation sets the thickness, and the workmanship sets whether that thickness works.

A chilled water example

Chilled water is the most common cold system in commercial buildings, and it shows how strongly the design condition decides the thickness. Take an NPS 2 chilled water line at 6 °C (43 °F) with flexible elastomeric insulation, typical k = 0.036 W/m·K, and a high-emittance surface:

Jacket temperature of an NPS 2 chilled water line at 6 °C with elastomeric insulation, by space condition.
SpaceDew pointRequired surface (margin 2 K)13 mm19 mm25 mm
Office ceiling, 24 °C and 50 in 10012.9 °C14.9 °C20.2 °C (passes)21.3 °C21.9 °C
Mechanical room, 27 °C and 70 in 10021.1 °C23.1 °C22.7 °C (fails)23.9 °C (passes)24.6 °C

In the office ceiling, even the thinnest size keeps the surface dry. In a humid mechanical room, like the Mountview penthouse design condition of 27 °C and 70 in 100 in INS-210, the thinnest size fails and the next one passes. In both spaces the energy code usually requires more than either, so for chilled water in buildings the code often governs, and the condensation check confirms that the code thickness is enough.

When the design condition is wrong

A condensation calculation is only as good as its design condition. Common causes of sweating on correctly insulated lines are spaces that turned out more humid than designed: a mechanical room where the ventilation was never balanced, a ceiling above a kitchen or shower room, a plant room with an open door in a summer storm. When a cold system sweats, check the room conditions with a hygrometer before blaming the insulation, as Marcel taught in INS-320; if the room is wetter than the design, the owner needs to know, because more insulation may only move the problem.

Below-ambient work and the jacket over time

Emittance is not fixed for the life of a system. A new aluminum jacket may start near 0.05 and, as it dulls, weathers and collects dust, rise toward 0.2 or more; PVC and painted jackets stay high. On cold work this means a shiny jacket is at its worst when new, which is exactly when the system is commissioned and inspected, so the design should use the new-jacket value, not an aged one.

Common mistakes

  • MistakeUsing average conditions for the room.

    InsteadUse the worst expected combination of temperature and humidity.

  • MistakeDesigning to the dew point with no margin.

    InsteadAdd a margin, commonly 2 K (4 °F) or as the specification states.

  • MistakeAssuming a shiny jacket helps on cold work.

    InsteadA low-emittance jacket runs colder and needs more thickness; calculate with its emittance.

  • MistakeUsing a room-temperature conductivity for a cold line.

    InsteadUse the conductivity at the low mean temperature.

  • MistakeRelying on thickness to keep insulation dry.

    InsteadThickness stops surface sweating; only a continuous, sealed vapour retarder keeps the insulation dry.

Summary and key terms

  • Condensation control keeps the jacket at or above the dew point plus a margin at the worst design conditions.
  • The dew point comes from the Magnus formula or a psychrometric chart; at high humidity it is only a few degrees below the air temperature.
  • The cold pipe calculation is the same as the hot one, with heat flowing inward; radiation carries most of the surface heat transfer.
  • On the Kellerton suction main, 38 mm with a PVC jacket passes, but an aluminum jacket needs 89 mm.
  • Heat gain costs electricity at a low COP, and only a sealed vapour retarder keeps the insulation dry enough for the calculation to hold.
Design condition
The air temperature and relative humidity a cold surface must tolerate, usually the worst expected.
Dew point
The temperature at which water vapour in the air begins to condense on a surface.
Margin
The number of degrees by which the surface must exceed the dew point in a condensation calculation.
Heat gain
Heat flowing into a cold pipe or vessel from its surroundings.
Coefficient of performance
The heat a refrigeration system removes for each unit of energy it uses.
Condensation control
Insulation designed to keep a cold surface above the dew point.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. What is the dew point of air at 32 °C and 70 in 100 relative humidity?

    Show answer

    About 25.8 °C.

  2. With a 2 K margin, what surface temperature is required?

    Show answer

    About 27.8 °C.

  3. Why does the aluminum-jacketed main need more insulation than the PVC one?

    Show answer

    The aluminum receives less radiant heat from the room, so it runs colder.

  4. What carries most of the heat to the outside of a cold jacket?

    Show answer

    Radiation from the warmer surroundings.

  5. What prevents water getting into the insulation itself?

    Show answer

    A continuous, sealed vapour retarder with vapour stops and sealed penetrations.