INS-330 · Lesson 2 of 12 · 23 min
Fire separations and fire-resistance ratings
▶ Video coming soon A video version of this lesson is on the way.
After the incense box, Rhoda unrolled a set of drawings on the bench. They were the life safety plans for the Mountview Hospital addition: one sheet per floor, with the walls drawn in coloured hatching and a legend in the corner. "Before you seal anything, you have to know what you are sealing," she said. "Every penetration we do is through a line on one of these sheets. The colour tells you how long that line has to hold a fire back, and the type of line tells you which rules apply."
This lesson covers the language the codes use for fire-rated construction, how ratings are set and tested, how to read the rated lines on drawings and in the field, and how the rating of a wall or floor turns into a required rating for each firestop in it. The two countries use different words for much of this, and the differences matter when you read a specification or talk to an inspector.
The code that applies
In Ontario, building construction is governed by the Ontario Building Code. The 2024 edition (O. Reg. 163/24) took effect on January 1, 2025, and is closely based on the 2020 National Building Code of Canada. Part 3 of Division B covers fire protection, occupant safety and accessibility for larger buildings such as hospitals; Section 3.1 covers fire separations, fire-resistance ratings, closures and firestops. Once a building is occupied, the Ontario Fire Code requires the owner to keep fire separations, closures and firestops in good repair.
The code sets the minimum. A hospital owner, an insurer or a designer may ask for more, and the project specification, usually in a section titled 07 84 00 Firestopping, sets out what the project requires. When the specification is stricter than the code, the specification governs the work.
Rated assemblies: the vocabulary
The Canadian codes are built around the fire separation: a construction assembly, such as a wall or floor, that acts as a barrier against the spread of fire. A fire separation may or may not need a fire-resistance rating; some only need to be continuous and resist the passage of smoke and flame. Where a rating is required, the code states it in minutes or hours: 45 minutes, 1 hour, 1½ hours, 2 hours, 3 hours or 4 hours. The main types an insulator meets are:
- Firewall. A type of fire separation that divides a building into separate buildings for code purposes, with a high rating (often 2 to 4 hours) and its own structural stability in a fire.
- Floor assemblies that act as fire separations between storeys, usually with a 45-minute, 1-hour or 2-hour rating depending on the building.
- Shafts and service spaces. Vertical shafts for pipes, ducts and elevators are enclosed by fire separations so that they cannot carry fire from floor to floor.
- Separations around exits (stairs and exit corridors), between suites and major occupancies, and around rooms with special hazards such as storage or mechanical rooms.
- Zones in hospitals. Patient floors are divided into zones by fire separations so that patients can be moved horizontally into the next zone; these separations must also resist smoke.
Not every wall on a drawing is rated. Most interior partitions in a building have no fire rating at all, and a pipe through them needs no firestop. The first job is always to find out which lines are rated.
How a fire-resistance rating is set
A fire-resistance rating is the time an assembly can withstand a standard fire test. In Canada, walls, floors, beams and columns are tested to CAN/ULC-S101, which exposes a full-size sample to a furnace that follows a set time-temperature curve, under load where the assembly carries load. The rating is the time until the assembly fails by letting flame through, getting too hot on the unexposed side, or failing structurally. Ratings can also be assigned from the tables in the code's supplementary standard SB-2, which list ratings for common assemblies such as concrete slabs of given thicknesses and gypsum board walls of given layers.
A rated assembly is only rated as built. A gypsum board wall rated for two hours is rated with a particular stud size and spacing, a particular number and type of boards, particular screws at particular spacing, and joints finished in a particular way. Most rated walls and floors are built to a listed design published by a testing laboratory, with a design number that appears on the drawings. The firestop that goes through that wall must have been tested in a wall like it.
Three points about the rating matter most to a firestopper:
- The firestop must not reduce the rating. A two-hour wall with a firestop rated for one hour is, at that spot, a one-hour wall.
- The firestop is tested in a specific kind of assembly. A system tested in concrete is not automatically good in a gypsum wall, or in a wood-framed floor.
- The firestop does not have to make up for a weak assembly. If the wall itself is damaged, missing boards above the ceiling for example, that is a wall repair, not a firestop job.
Closures and their ratings
Openings such as doors, windows and duct openings are protected by closures or opening protectives: fire doors and frames, fire dampers, fire shutters and rated glazing. These carry a separate rating, usually called a fire-protection rating, and the required rating is often lower than the wall's. A door in a two-hour wall typically needs a 1½-hour rating, because doorways are kept clear of fuel and the door is backed up by the wall around it.
Firestoppers meet closures in two ways. First, a duct that passes through a rated wall with a fire damper is protected by the damper and its installation, not by a firestop; the damper's own instructions say how the gap around its sleeve is closed, and adding sealant where the damper's instructions do not call for it can stop the damper's sleeve from moving as it was tested. Second, a door frame or damper sleeve that has been damaged or cut by another trade is a closure problem for the trade that installed it, not something to fill with firestop sealant.
From the wall's rating to the firestop's rating
In Ontario's code, a penetration through a fire separation, or through a membrane that is part of a rated assembly, must be sealed by a firestop tested to CAN/ULC-S115 that has an F rating no less than the required fire-resistance rating of the separation. Pipes of steel, iron, copper, concrete or masonry may instead be cast in place in concrete. In certain places the code asks for more: penetrations of firewalls, of some horizontal fire separations and of certain service spaces need an FT rating, which also limits the temperature on the unexposed side. Combustible piping, such as plastic drain and water pipe, has extra conditions, including testing at a higher pressure difference of 50 Pa. Lesson 3 explains what F and FT mean in the test.
Rhoda put it on the whiteboard more simply:
- Find the rating of the line. For a 2-hour fire separation, the firestop needs F 2 hours at least.
- Find the type of line. For a firewall, a floor that the code singles out, or a smoke-resisting zone separation, check for an FT or L requirement.
- Check the specification. Mountview's specification asks for FT ratings in the floor slabs, and for low air leakage at the zone separations on the clinic floors, beyond the code minimum.
- Check the item. Plastic piping and some cables carry extra conditions in the code.
- Then choose the system. Only now look for a tested system that meets all of those requirements for the exact assembly and item.
Worked problem
What ratings do the Mountview Level 2 penetrations need?
The Mountview life safety plan shows: the Level 2 floor slab as a 2-hour fire separation; the mechanical shaft walls as 2-hour fire separations; the corridor walls on the clinic floors as 1-hour fire separations; and the zone separation that divides each clinic floor into two halves as a 1-hour fire separation that must resist smoke. The specification asks for FT ratings on penetrations of the floor slabs and an L rating at the zone separation. What ratings must the firestops at each of these lines have?
Show solution
- Floor slab: the code requires F 2 hours; the specification adds T, so the firestop needs FT 2 hours.
- Shaft walls: F 2 hours.
- Corridor walls: F 1 hour.
- Zone separation: F 1 hour, plus the L rating the specification sets for smoke leakage.
- Then, for plastic pipe in any of these, check the code's extra conditions, including the 50 Pa test pressure.
Answer: FT 2 h in the slab, F 2 h in the shaft walls, F 1 h in the corridor walls, and F 1 h with an L rating at the zone separation.
Reading rated lines on drawings
Designers show rated assemblies on separate plans, usually called life safety plans or code plans. Each rating has its own line type or colour, explained in a legend. Typical conventions are a dashed or hatched band for 1-hour lines, a heavier band for 2-hour lines and a distinct pattern for smoke barriers. Floors are often noted in the legend rather than drawn, with a note such as "all floor assemblies 2-hour rated".
The plans also give the wall types. A wall type tag on the floor plan, such as a hexagon with a code inside, points to a schedule of wall types that gives the construction and the listed design number. The ceiling plans show where rated walls run above ceilings, and the mechanical and electrical plans show what will pass through them. Reading all three together is how a firestop foreperson builds a penetration list for a floor before work starts.
Drawings can be wrong or out of date. Walls move during construction, ratings change with revisions, and the field condition may not match the drawing. A firestopper who finds a wall that looks rated but is not shown as rated, or the reverse, asks the contractor in writing before going on.
Finding rated lines in the field
Once the ceilings are open, rated walls can be hard to tell from ordinary ones. Many hospital specifications, including Mountview's, require rated walls to be stencilled above the ceiling at intervals, with the rating and a warning to protect all openings. The construction also gives clues: rated walls usually run full height to the underside of the slab or deck, have more than one layer of board on at least one side, and have their joints taped and finished above the ceiling, while ordinary partitions often stop just above the ceiling.
Concrete and masonry walls and floors are usually rated by their thickness. The floor slab at Mountview is 200 mm (8 in) of normal-weight concrete on a steel deck. The thickness matters later, because tested firestop systems state the minimum thickness of floor or wall they apply to.
How ratings interact in a real building
In a real building, one pipe may cross several rated lines on its way, and each crossing is a separate firestop with its own required rating. A heating hot water riser that goes up a mechanical shaft and then branches across a floor may cross the floor slab at the bottom of the shaft, the shaft wall where it leaves the shaft, a corridor wall and a zone separation, all within a few metres. Each crossing gets its own system number, its own label and its own line in the records.
Changes in rating along one line are common too. A shaft wall may be rated 2 hours from Level 1 to Level 4 and 1 hour above. A wall may be a 1-hour corridor wall on one side of a door and a 2-hour exit wall on the other. The firestopper works to the rating at the exact spot of each penetration.
| Line on the drawing | Ontario code term | Typical rating | What a penetration needs |
|---|---|---|---|
| Floor slab | Fire separation (floor assembly) | 2 hours | F ≥ 2 h; FT where the code or specification requires |
| Mechanical shaft wall | Fire separation (vertical service space) | 2 hours | F ≥ 2 h |
| Clinic corridor wall | Fire separation | 1 hour | F ≥ 1 h |
| Hospital zone or smoke wall | Fire separation that resists smoke | 1 hour | F ≥ 1 h, plus low smoke leakage if specified |
| Ordinary partition | Not rated | None | No firestop; acoustic or smoke seal only if specified |
What happens if the rating is wrong
Getting the rating wrong is one of the costliest firestop mistakes, because it is usually found late. If a crew installs a 1-hour system in a 2-hour wall, the inspector rejects it, and the firestop must be cut out and replaced, often after other trades have filled the ceiling with new work. If the mistake is not found, the building has a weak spot that nobody knows about. Rhoda's crew checks the rating for every penetration on the penetration list against the drawings before work starts, and again if anything is revised.
Nico asked whether it would be simpler to use 2-hour systems everywhere. "Sometimes we do," Rhoda said. "But a 2-hour system in a 1-hour wall is only fine if it was tested in a wall like that one. A system tested in an 8-inch concrete wall is no good in a single-layer drywall wall, whatever its hours say. The hours are only half of it."
Common mistakes
MistakeAssuming every wall above a ceiling is rated, or that none are.
InsteadCheck the life safety or code plans and the wall types, and confirm in the field.
MistakeMatching only the hours and ignoring the type of assembly.
InsteadChoose a system tested in the same kind of wall or floor, and check its other ratings too.
MistakeSealing around a fire damper sleeve with firestop sealant.
InsteadFollow the damper manufacturer's installation instructions; the damper protects that opening.
MistakeTreating a damaged rated wall as a firestop job.
InsteadReport the damage so the wall is repaired to its listed design.
MistakeWorking from an old revision of the drawings.
InsteadCheck every rated line against the current revision, and ask in writing when the field does not match.
Summary and key terms
- Ontario's 2024 Building Code, based on the 2020 National Building Code, sets rules for fire separations, closures and firestops; the Fire Code requires owners to maintain them.
- A fire separation is a barrier to fire spread; where required, its fire-resistance rating is set by test to CAN/ULC-S101 or by the code's tables.
- A rated assembly is rated only as built to its listed design, and the firestop must be tested in a similar assembly.
- Closures such as doors and dampers have their own ratings and installation rules; firestoppers must not alter them.
- Penetrations need a CAN/ULC-S115 firestop with an F rating at least equal to the required rating, and an FT rating where the code or specification asks for it.
- Rated lines are found on life safety or code plans and confirmed in the field; each crossing of each line is a separate firestop.
- Fire separation
- A construction assembly that acts as a barrier against the spread of fire, with or without a required fire-resistance rating.
- Fire-resistance rating
- The time, in minutes or hours, that an assembly withstands the standard fire test.
- Firewall
- A fire separation with a high rating and its own stability, which divides a building into separate buildings for code purposes.
- Closure
- A rated device, such as a fire door or damper, that protects an opening in a fire separation.
- Fire-protection rating
- The rating of a closure, which is often lower than that of the wall it is in.
- Listed design
- A tested assembly published by a laboratory, with a design number used on drawings.
- Life safety plan
- A drawing that shows the rated assemblies, exits and other fire safety features of each floor.
Practice problems
Work each problem on paper first, then reveal the answer to check.
A wall is rated 2 hours. What is the minimum F rating of a firestop in it?
Show answer
2 hours.
Name two places where Ontario's code asks for an FT rating rather than only an F rating.
Show answer
Any two of penetrations of a firewall, certain horizontal fire separations, and certain service spaces.
Why does a door in a 2-hour wall often need only a 1½-hour rating?
Show answer
Doorways are kept clear of fuel and the door is backed by the wall; closures have their own lower rating.
A pipe rises through a shaft, leaves through the shaft wall and crosses a corridor wall. How many firestops?
Show answer
At least three: the floor at the bottom of the shaft, the shaft wall and the corridor wall.
What three drawings help build a penetration list?
Show answer
The life safety plans, the ceiling plans, and the mechanical and electrical plans.