HSE-217 · Lesson 8 of 12 · 28 min
Access, egress, spoil and edges
A trench with a perfect protective system can still kill people who cannot get out of it quickly, who are struck by a load swung over it, who fall into it, or who are buried when a spoil pile or a parked truck pushes the edge in. This lesson covers the ground around and above the excavation: ladders and ramps, spoil and surcharge, mobile equipment, falling loads, barriers and covers, and protecting the public and nearby structures.
Getting in and out
Workers need a safe way in and a safe way out, close enough that they can escape quickly if water rushes in, a wall starts to move, gas is detected or someone is injured. Climbing the walls, riding the bucket, using shoring members as a ladder or jumping in from the edge are all prohibited.
Ontario's O. Reg. 213/91 requires any ladder used to enter a trench to be placed within the area protected by the support system, so that workers never climb out through an unprotected section. Ontario's general ladder rules also apply: the ladder must be secured against movement and should extend about 900 mm above the landing so the worker has something to hold on to while stepping off. Alberta's OHS Code requires a safe means of entry and exit within 8 m of a worker in a trench deeper than 1.5 m, and requires the trench to be supported or sloped so the worker can reach it safely.
Worked problem
How many ladders?
A 40 m length of trench deeper than 1.5 m is open at once in Alberta. Workers may be anywhere along it. What is the minimum number of ladders, and where should they go?
Show solution
- No worker may be more than 8 m from an exit, so each ladder covers 8 m on either side: a 16 m stretch.
- \( 40 / 16 = 2.5 \), so at least three ladders are needed.
- One arrangement: ladders at about 7 m, 20 m and 33 m from one end, leaving no point more than 8 m from a ladder.
- In a trench box, the ladders must be inside the box, so ladders move with the box as the work advances.
Answer: Three ladders, spread so that every point in the trench is within the allowed distance of one.
Worked problem
Choosing a ladder length
A trench is 3.0 m deep. The ladder will be set at a slope of 4 vertical to 1 horizontal and must extend 0.9 m above the top. Roughly what ladder length is needed?
Show solution
- At 4:1, the ladder's length along the rails is about 1.03 times the vertical height: \( \sqrt{4^2 + 1^2} / 4 \approx 1.03 \).
- Length to the top of the trench: \( 3.0 \times 1.03 \approx 3.1 \) m.
- Add the extension above the landing: \( 3.1 + 0.9 = 4.0 \) m.
- Choose the next standard size up, such as a 4.3 m ladder, and secure it top and bottom.
Answer: About 4.0 m of usable length; use a 4.3 m ladder or longer.
Spoil and surcharge
Excavated soil, called spoil, is heavy and close at hand, which is exactly why it ends up in the wrong place. A spoil pile at the edge adds weight to the wall, can slide or roll back into the trench, and hides cracks that would warn of movement. Materials such as pipe, precast structures, bedding stone and timber, and equipment such as compactors and pumps, create the same problems.
Ontario requires a level area at least 1 m wide along the upper edge of each wall to be kept clear of equipment, excavated soil, rock and construction material, and requires stockpiles of material to be placed so they do not affect the stability of the walls. Alberta requires the leading edge of a spoil pile to be at least 1 m from the edge of the excavation, and the slope of the pile to be no steeper than 45 degrees from horizontal.
These distances are minimums. Heavy surcharges such as large spoil piles, loaded trucks, cranes and stacked precast should be kept further back, and their effect on the protective system considered. A practical guide used by many engineers is that loads within a distance from the edge roughly equal to the depth of the excavation affect the walls, and that a protective system designed without a surcharge allowance may not be adequate when heavy equipment works alongside.
Worked problem
Where does the spoil go?
A trench 1.0 m wide and 2.5 m deep is dug for a 20 m run. The soil swells by 25 percent when excavated. If the spoil is piled in a ridge with 45-degree sides beside the trench, how high and how wide is the ridge, and how far from the trench edge does it extend once the 1 m clear area is added?
Show solution
- Volume in place per metre of trench: \( 1.0 \times 2.5 = 2.5 \) m³.
- Loose volume per metre: \( 2.5 \times 1.25 \approx 3.1 \) m³.
- A triangular ridge with 45-degree sides has a cross-section area of \( h^2 \), where \( h \) is its height. So \( h = \sqrt{3.1} \approx 1.8 \) m, and the base width is \( 2h \approx 3.5 \) m.
- Adding the 1 m clear area, the spoil reaches about \( 1 + 3.5 = 4.5 \) m from the trench edge.
Answer: A ridge about 1.8 m high and 3.5 m wide, reaching about 4.5 m from the edge; plan for this space before digging.
Mobile equipment near the edge
Excavators, loaders, dump trucks, concrete trucks and cranes are heavy, vibrate the ground and can tip into the excavation if the edge gives way. Operators often cannot see the edge from the cab.
Ontario prohibits operating or locating vehicles and machines in a way that affects the stability of the excavation walls, and keeps equipment out of the 1 m clear area. Where an operator's view of the edge is limited, a signaller should guide the machine, and stop logs or barricades can mark the limit of approach. Crews should keep track of where trucks back up to be loaded and keep them away from unsupported edges.
Excavators should normally dig from the side opposite the spoil pile, track at right angles to the trench rather than along the edge, and set their outriggers or tracks well back from any unsupported wall. Trucks being loaded should stay outside the surcharge zone or the protective system should be designed for them.
Falling loads and swinging buckets
No worker should be under a load handled by lifting or digging equipment. Workers in a trench must stand clear of pipe being lowered and of the excavator bucket as it swings, and should be outside the swing radius of the machine when they are on the surface. A pipe lowered on a sling can swing, slip or drop; workers should guide it with tag lines and receive it only when it has been set down or is under control. Ontario's construction regulation prohibits workers from being beneath a suspended load, and these rules apply in and around trenches as much as anywhere else.
The bucket is not a work platform, a man-lift or a means of access, and lifting with an excavator requires a machine rated for lifting, a lift chart, approved attachment points and, in most jurisdictions, an operator trained for lifting. HSE-219 covers rigging and lifting in more detail.
Falls into the excavation
Open excavations are also fall hazards for workers walking past, for equipment operators stepping off machines and for the public. Ontario requires a barrier at least 1.1 m high at the top of every wall that is not sloped, where a person could fall more than 2.4 m into the excavation. Shorter drops still need control: covers, fencing or clearly marked walkways keep people away from edges. Where workers must cross a trench, a walkway with guardrails is needed rather than a plank across the gap.
Protecting the public
Many excavations are dug in streets, sidewalks, yards and parks where the public cannot be expected to recognize the hazard. Children are particularly at risk around open trenches and water-filled holes. Excavations left unattended, especially overnight, should be fenced or covered with steel road plates designed for the traffic, secured against sliding, and lit or marked as needed. Traffic control on public roads follows the provincial manual, such as Ontario Traffic Manual Book 7 for temporary conditions.
Adjacent structures
Excavating beside a building, retaining wall, utility pole, sidewalk or road can remove the soil that supports it. The structure may settle, crack or collapse into the trench, and the extra load it places on the excavation can overwhelm a protective system designed without it. Before digging near a structure, the competent person should identify its foundation depth and type, consider whether the excavation will extend below a line drawn down and out from the foundation at a safe slope, and obtain an engineer's design for underpinning, bracing or a supported excavation where needed. Utility poles near trenches may need to be braced or held by the utility before digging.
| Hazard | Key Canadian controls |
|---|---|
| Access and exit | Ladder within protected area (Ontario); exit within 8 m beyond 1.5 m (Alberta) |
| Spoil | 1 m clear area (Ontario); leading edge 1 m back, 45° pile (Alberta) |
| Mobile equipment | No machine where it affects wall stability; signallers |
| Falls into excavation | 1.1 m barrier where fall exceeds 2.4 m at unsloped walls (Ontario) |
| Falling loads | No worker beneath suspended loads |
Housekeeping in and around the trench
Good housekeeping is easy to neglect in an excavation and has a large effect on safety. Tools, offcuts of pipe and fittings, rocks and clods left on the trench floor create tripping hazards in a confined space where workers often look upward at loads and equipment. Loose material at the edge can be kicked or knocked in. Hoses and cables for pumps and saws should be routed so they do not cross access points or snag on equipment. At the end of each shift, the trench floor should be clear, ladders in place, materials stored back from the edge and the excavation secured for the night.
Common mistakes
MistakePlacing the ladder at the end of the trench outside the trench box.
InsteadPut ladders inside the protected area so workers never climb through an unprotected section.
MistakeStockpiling bedding stone at the trench edge for convenience.
InsteadKeep the 1 m clear area free and stockpile materials where they do not load the walls.
MistakeLetting dump trucks back up to the edge of an unsupported trench.
InsteadKeep trucks outside the surcharge zone or design the protective system for them.
MistakeStanding in the trench to guide a pipe as it is lowered.
InsteadStay clear of suspended loads; use tag lines and receive the pipe once it is controlled.
MistakeLeaving an excavation open and unfenced overnight in a residential street.
InsteadFence, plate or barricade unattended excavations and protect the public.
Summary and key terms
- Ontario requires ladders inside the protected area; Alberta requires an exit within 8 m in trenches deeper than 1.5 m.
- Spoil and materials stay outside the 1 m clear strip; heavy loads stay further back.
- Plan space for spoil before digging; loose spoil occupies more volume than soil in place.
- Keep mobile equipment back from edges and guide operators who cannot see them.
- Nobody stands beneath loads or within the swing of the bucket.
- Barriers, covers and walkways prevent falls into excavations.
- Protect the public and adjacent structures, especially overnight.
- Egress
- A means of exiting an excavation, such as a ladder, stairway or ramp.
- Spoil
- Soil and rock removed from an excavation.
- Surcharge zone
- The area near the edge where loads add pressure on the excavation walls.
- Clear area
- The strip along the edge of an excavation kept free of spoil, materials and equipment.
- Stop log
- A timber or barrier placed to stop vehicles from approaching an excavation edge.
- Signaller
- A worker who directs an equipment operator who cannot see a hazard.
- Tag line
- A rope attached to a load so it can be controlled from a distance.
- Road plate
- A steel plate used to cover an excavation in a traffic area.
- Underpinning
- Extending or strengthening a foundation to support it during nearby excavation.
Practice problems
Work each problem on paper first, then reveal the answer to check.
Where must an access ladder be placed in an Ontario trench with a support system?
Show answer
Within the area protected by the support system.
What is the minimum clear strip along each edge in Ontario?
Show answer
1 m.
Why is spoil at the edge dangerous?
Show answer
It loads the wall, can roll back in and hides cracks.
When does Ontario require a 1.1 m barrier?
Show answer
Where a person could fall more than 2.4 m at an unsloped wall.
A trench box moves along a long trench. What happens to the ladder?
Show answer
It moves with the box and stays inside it.
What should be used when an operator cannot see the edge?
Show answer
A signaller, barricades or stop logs.
Why should excavators track at right angles to a trench?
Show answer
To keep their weight away from the edge.
What is the swell factor and why does it matter?
Show answer
Loose soil takes more space, often 20 to 30 percent more, so spoil needs more room than expected.
Name two ways to protect the public overnight.
Show answer
Fencing, steel road plates, barricades, lighting and signs.
What should be done before digging next to a building foundation?
Show answer
Determine foundation depth and get an engineer's design for support if needed.