Structured Cabling and Fibre Plant Design
Designing, testing and administering data centre cabling to TIA-942 and BICSI practice, from the meet-me room to AI clusters and the rack.
DCE-320 Year 3 3 credits 12 lessons · 6 h 5 min
Offered by HSM University · Data Centre Engineering
This is the Canadian version of this course. See the American version.
What you'll learn
- Lay out data centre cabling to TIA-942: entrance rooms, MDAs, HDAs, ZDAs and EDAs in a hierarchical star, with cross-connects, switch placement, redundancy and labelling
- Select copper and fibre media for each link from its length, speed, optics, lifetime cost and upgrade path
- Explain channel and permanent-link models, copper transmission parameters, alien crosstalk and shielding, and design Power over Ethernet for loss and bundle heating
- Explain fibre attenuation, modal and chromatic dispersion, bend-insensitive fibre, reflectance and wavelength-division multiplexing, and their effect on link design
- Relate transceiver lanes, modulation, form factors and optical interfaces to the fibre types, connectors and fibre counts the plant must provide, including breakouts
- Design pre-terminated MPO fibre systems, verify polarity, calculate channel loss budgets and specify testing
- Write test specifications with correct reference methods and limits, interpret OTDR traces, and troubleshoot failed or degrading links
- Size cable trays for fill and weight, apply bend radius, conduit, separation, fire rating, firestopping and bonding requirements
- Design cabling for AI clusters, counting links and fibres for rail-optimized fabrics and planning switch placement and pathways at scale
- Lay out cabinets and cable managers for airflow and maintainability, and administer the plant with TIA-606 identifiers, records and change control
- Plan outside plant, diverse routes and building entrances, calculate long-link budgets and the availability benefit of diversity
- Deliver a cabling project from requirements to handover, calculating trunk lengths, loss budgets and pathway fill and coordinating with other trades
Course content
12 lessons · 6 h 5 min total · final exam
- 1 TIA-942 spaces and topology 34 min · quiz
- 2 Copper and fibre media selection 30 min · quiz
- 3 Copper channel performance and Power over Ethernet 33 min · quiz
- 4 Optical fibre in depth: loss, dispersion and wavelengths 29 min · quiz
- 5 Transceivers, breakouts and high-speed interconnect 27 min · quiz
- 6 High-density fibre, MPO and loss budgets 34 min · quiz
- 7 Testing, certification and troubleshooting 29 min · quiz
- 8 Pathways, cable trays and fill 32 min · quiz
- 9 Cabling for AI and high-performance computing clusters 29 min · quiz
- 10 Cabinets, cable management and administration 28 min · quiz
- 11 Outside plant, diverse routes and carrier entrances 34 min · quiz
- 12 Delivering a cabling project: from requirements to handover 26 min · quiz
- E Final exam 20 questions
Requirements
Recommended background. You can start any course at any time.
Description
Designing, testing and administering data centre cabling to TIA-942 and BICSI practice, from the meet-me room to AI clusters and the rack.
Part of the Engineering stream, typically taken in year 3.