RCDD-113 · Lesson 11 of 12 · 19 min
Electrical code requirements for communications systems
▶ Video coming soon A video version of this lesson is on the way.
Two weeks before the design was issued for permit, Roz asked Daniel to do a code review of the telecommunications drawings and specification. 'Not the electrical drawings,' she said. 'Priya does those. Ours. Go through every bonding, protection and power item and find the code requirement it rests on. If you can't find one, it's a standard or owner requirement, and the specification should say so. If you find a code requirement we've missed, that's a problem.'
This lesson is about how the National Electrical Code deals with communications systems, and how an RCDD uses it. It does not reproduce the code's text, which is copyrighted and changes with each edition; an RCDD must own and read the current edition adopted where the project is. The aim is to know where the requirements are, what they are trying to achieve and how to apply them in a design.
How the code is organized
The National Electrical Code, published by the NFPA as NFPA 70, is organized into chapters and articles. Article 100 contains definitions. Article 250 covers grounding and bonding, including the intersystem bonding termination in 250.94. Chapter 7 includes articles on power-limited and optical fiber circuits, and Chapter 8 covers communications systems. In the 2023 edition, Article 800 contains general requirements for communications systems, and separate articles cover communications circuits, radio and television equipment, CATV and broadband systems. The 2026 edition reorganized much of this material, moving many inside-the-building cable requirements into new general articles. A new edition is published every three years, and each state or city adopts it on its own schedule, often with amendments.
Two consequences follow. First, the edition and amendments in force where the project is located are what matter, not the latest edition the designer happens to own. Harbourview's permit application would be reviewed under the edition Minnesota had adopted, which Daniel confirmed with the AHJ's published list. Second, rule numbers change between editions. A specification that cites a rule number should also cite the edition, or cite the requirement in words with a reference to the relevant section or article, so that it stays meaningful.
| Topic | National Electrical Code location | What it covers for the RCDD |
|---|---|---|
| Definitions | Article 100 | Exposure, communications circuit, grounding and bonding terms |
| Electrical grounding and bonding | Article 250, including 250.94 | Grounding electrode system; the connection point for other systems |
| Communications circuits | Chapter 8 (Article 800 and related articles) | Protectors, bonding of circuits, cable installation and listing |
| Optical fiber cables | Article 770 in 2023; reorganized in 2026 | Conductive and non-conductive fiber cables, metallic members |
| Antennas, radio and CATV | Chapter 8 articles for radio and CATV | Antenna mast and cable bonding, coaxial protection |
| Low-voltage and power-limited circuits | Article 725 in 2023; reorganized in 2026 | Class 2 circuits including some PoE and building automation |
Protection and bonding at the entrance
The code's central requirements for communications systems deal with what lessons 6 and 7 covered: exposed circuits entering a building need listed or certified primary protection, located as close as practical to the point of entrance, and the protector must be bonded to the building's grounding system with a conductor of at least a minimum size, as short and straight as practical, run to one of a list of acceptable connection points. The code also requires the metallic sheath or shield of an entering cable to be bonded close to the entrance and sets requirements for conductive optical fiber cables and coaxial cables.
In the United States, the requirements are in Chapter 8 and, for optical fiber, in the article on optical fiber cables, with the connection point for the bonding conductors provided by the intersystem bonding termination required by 250.94 at the service equipment and at each building's disconnecting means. Daniel listed each requirement in a table in his review, with the clause, a summary in his own words and the drawing or specification item that met it.
The code's acceptable connection points for protector bonding conductors are listed in order of preference. The building's intersystem bonding connection at the service, or the grounding electrode system directly, are at the top. Further down are alternatives such as accessible means external to the service enclosure or metal structural parts, used only where the preferred points are not available. The PBB at Harbourview, bonded directly to the service ground bus by the TBC and located beside it, gave the protector a short path to the preferred point, and Daniel confirmed with the inspector before issue that this arrangement would be accepted.
Cable listings and fire ratings
Cables installed inside buildings must be listed or certified for the spaces they occupy, so that they do not spread fire or smoke beyond acceptable limits. In the United States, communications cables are marked with listing types such as CMP for plenums, CMR for risers, CMG and CM for general use, and CMX for limited uses, with corresponding types for optical fiber and CATV cables. The code's tables of permitted uses and substitutions say which may be used where. The same applies to bonding conductors in those spaces, as lesson 4 noted.
Fire stopping is a related requirement. Wherever a cable, conduit, sleeve or bonding conductor passes through a fire-rated wall or floor, the opening must be sealed with a tested firestop system that restores the rating. The building code and the fire code set the requirement, and the electrical code refers to it. The RCDD's drawings must show where pathways cross rated assemblies and require tested systems at each. Other courses in the RCDD program cover firestopping in detail.
Separation from power
The code requires communications wiring to be separated from power and lighting conductors, from electric light and power circuits in the same raceway or enclosure, and from certain other circuits, unless barriers or listed cables are used. The purpose is to prevent a fault in the power wiring from energizing communications wiring and to keep power conductors from damaging communications cable insulation. The specific distances and exceptions are in Chapter 8. Separation for performance reasons, to limit interference, is a separate question covered by the TIA pathway standards, and the two should not be confused.
Abandoned cable
The NEC requires the accessible portion of abandoned communications cable to be removed, and cable that is kept for future use to be tagged as such. Abandoned cable adds fuel to fires and makes ceilings and pathways harder to manage. Daniel added a specification clause requiring removal of abandoned cable in any space the contractor worked in at the existing clinic building.
Power-limited circuits and PoE
Many circuits in modern buildings are power-limited: the source is designed so that the energy available on the circuit is low enough to limit fire and shock hazards. Ethernet with PoE, building automation sensors, nurse call and access control circuits often fall in this group. The power-limited circuit articles of the NEC set requirements for these circuits, including cable types and, for PoE, limits that depend on conductor size, bundle size and cable temperature rating. Those rules are what lesson 9's bundle size limits were based on.
Health care occupancies
Harbourview includes clinic floors, which brings additional requirements. Article 517 of the NEC, together with NFPA 99, sets requirements for health care facilities, including grounding in patient care spaces and the branches of the essential electrical system. ICT equipment in patient care areas, nurse call systems and the network equipment that supports clinical systems may need to meet requirements for grounding, power branch and equipment listing beyond those for offices. The electrical engineer and the owner's clinical engineering team decide how they apply; the RCDD needs to know enough to ask.
Listing marks and substitutions
Every product the code requires to be listed or certified carries a mark from the testing organization that evaluated it. On cable, the mark and the rating are printed on the jacket at regular intervals; on protectors, SPDs, busbars and connectors, they appear on the product or its label. Inspectors check them, and an RCDD reviewing submittals should too. A cable marked with the right rating but no recognized certification mark, or a protector bought online with no listing at all, can fail inspection and must be replaced.
The NEC's tables of cable substitutions explain which higher-rated cables may be used in place of lower-rated ones: a CMP cable may generally be used where CMR or CM is required, but not the other way around. Daniel's specification allowed contractors to substitute higher-rated cable without approval but required approval for anything else, which saved arguments when a supplier was short of one type.
Submittal review is where many problems are caught. For Harbourview, Tomasz's office submitted data sheets for every busbar, lug, conductor, protector, SPD and rack bonding kit before ordering. Daniel checked each against the specification, the listing requirement and the maker's installation instructions, and rejected two items: a bonding conductor whose jacket was not rated for the plenum spaces in the college wing, and a set of single-hole lugs offered as an equivalent to the specified two-hole lugs.
Working with the AHJ
Where the code is unclear, or where a design uses an arrangement the code allows only with approval, the AHJ decides. Daniel's review produced three questions for the inspector: whether the PBB arrangement was acceptable as the protector bonding point, whether the rooftop antenna enclosure counted as the building entrance for the coaxial cables, and which cable ratings would be accepted in the open ceiling of the college lab. He asked them in writing, received written answers and filed them with the design. Roz's rule was that any answer that changed the design or justified an unusual choice had to be in writing.
The AHJ is also the inspector who will look at the finished work. An inspector who has seen the design and agreed with its approach before construction is much more likely to pass it quickly. Inviting the inspector to look at the PBB and protector area during construction, before walls are closed, avoids surprises.
Who may do the work
Licensing rules for electrical and communications work vary by state and city. In many places the TBC and any connection to the electrical system must be installed by a licensed electrical contractor, while low-voltage communications cabling may be installed by a communications contractor with a different license or none. The specification should assign each item to the right trade, and the RCDD should check the local rules rather than assume. At Harbourview, the electrical contractor installed the TBC, the panel SPDs and the TR panels; the cabling contractor installed busbars, the TBB, rack bonding and all communications cabling, protectors and data SPDs.
Worked problem
A code review line
Write the code review entry for the primary protector on the service provider copper cable at Harbourview.
Show solution
- Design item: building entrance terminal with plug-in gas tube protectors on the provider copper cable, east wall of the entrance facility.
- Requirement: Chapter 8 requires listed primary protection on exposed communications circuits, located as close as practical to the point of entrance, bonded with a conductor of at least the minimum size, as short as practical, to an acceptable bonding point such as the intersystem bonding termination.
- How the design meets it: the protector is about 1.5 meters from the conduit entry; its bond runs about 2 meters straight to the PBB; the PBB is bonded to the service ground bus by the TBC.
- Open question: confirm with the AHJ that the PBB is accepted as the bonding point (answered yes in writing).
Answer: Each code review entry names the item, the requirement in the designer's own words, how the design meets it and any question for the AHJ.
Common mistakes
MistakeCiting a rule number without the edition.
InsteadCite the edition, or describe the requirement in words with the section or article.
MistakeUsing the newest edition rather than the adopted one.
InsteadConfirm which edition and amendments the AHJ enforces.
MistakeConfusing code separation from power with performance separation.
InsteadApply the code for safety and the TIA pathway standards for interference.
MistakeRelying on verbal answers from the AHJ.
InsteadGet written answers for questions that affect the design.
Summary and key terms
- The NEC articles most relevant to the RCDD are 100, 250, 517, the power-limited and optical fiber articles and Chapter 8.
- Use the adopted edition and amendments, and cite editions with rule numbers.
- Exposed circuits need listed primary protection near the entrance, bonded with a short conductor to an acceptable point.
- Cables and bonding conductors must be listed or certified for the spaces they occupy, and penetrations need tested firestop systems.
- Health care occupancies add requirements for grounding and essential power.
- Ask the AHJ in writing where the code is unclear, and assign each item to the right licensed trade.
- Adopted edition
- The edition of the code, with amendments, that a jurisdiction enforces.
- Listing or certification
- Evaluation of a product by a recognized testing organization for a specific use.
- Plenum and riser cable ratings
- CMP and CMR, the US listing types for communications cables in plenums and in risers.
- Firestop system
- A tested combination of materials that restores the fire rating of a wall or floor at a penetration.
- Power-limited circuit
- A circuit whose source limits available energy to reduce fire and shock hazards.
Practice problems
Work each problem on paper first, then reveal the answer to check.
Why should a specification cite the code edition with a rule number?
Show answer
Rule numbers change between editions.
Which chapter of the NEC covers communications systems?
Show answer
Chapter 8.
What does the code require for cables in plenum spaces?
Show answer
Cables listed for the space, such as CMP in the United States.
What should be done with questions the code does not answer clearly?
Show answer
Ask the AHJ in writing and file the answer.
Lesson quiz · 5 questions
Score 60% or more to complete this lesson.
Create a free account to save your progress, take quizzes and earn a certificate.