Scaffold stability: ties, bracing and mobile scaffolds

A scaffold that is strong enough can still fall over. Tall, narrow scaffolds tip easily under wind, sideways pushes, uneven loading or a worker leaning on a guardrail. Stability comes from the right height-to-base ratio, bracing that keeps the structure square, ties or guys to the building, outriggers that widen the base, and careful loading. Mobile scaffolds add the hazard of movement. This lesson explains how scaffolds are kept upright and what users must never change.

Why scaffolds tip

A free-standing scaffold resists tipping only by its own weight and the width of its base. Anything that pushes sideways, or moves the center of gravity toward one edge, reduces that margin:

  • wind, especially on scaffolds wrapped in sheeting, tarps or debris netting, which act like sails;
  • workers pulling or pushing on the structure, for example hauling materials up the side with a rope;
  • hoist arms, chutes or brackets that cantilever loads outside the base;
  • uneven loading, such as stacking all the materials on one side;
  • soft or settling ground under one side;
  • removed braces, ties or outriggers;
  • vehicles or equipment striking the scaffold.

Height-to-base ratio

The height-to-base ratio compares the height of the scaffold to its minimum base width. OSHA's 1926.451(c)(1) requires supported scaffolds with a height-to-base ratio of more than four to one to be restrained from tipping by guying, tying, bracing or equivalent means. Mobile scaffolds carrying workers while being moved have a stricter limit of two to one under 1926.452(w)(6).

Worked problem

Checking whether a scaffold needs ties

A free-standing frame scaffold has a base 5 ft wide and 7 ft long. The top platform will be 24 ft above the base. Does it need ties or outriggers?

Show solution
  1. The minimum base width is 5 ft.
  2. Ratio = 24 ÷ 5 = 4.8.
  3. 4.8 is more than 4, so the scaffold must be tied, guyed or braced, or its base widened with outriggers.
  4. Outriggers that widen the effective base to 6 ft or more would bring the ratio to 4.0 or less.

Answer: Yes. At 4.8 to 1 it exceeds the 4 to 1 limit and needs ties, guys or outriggers.

Ties, guys and bracing

Ties connect the scaffold to the building or structure. They resist both inward and outward movement. Guys are cables or rods to ground anchors, used where there is no structure to tie to. Bracing, such as buttress frames, provides stability from the scaffold itself.

Elevation of a scaffold against a building, 50 ft high and 5 ft wide. Wall ties are shown with the lowest at 20 ft, the next at 46 ft, the top tie within 20 ft of the top, and horizontal ties at each end and every 30 ft. A note says ties must resist push and pull.
A typical tie pattern under 1926.451(c)(1)(ii) for a scaffold wider than 3 ft.

Under 1926.451(c)(1)(ii), unless the manufacturer specifies otherwise, the lowest tie is placed no higher than 4 times the minimum base width; vertical ties are repeated at no more than 20 ft for scaffolds 3 ft wide or less, and 26 ft for scaffolds more than 3 ft wide; the top tie is no further from the top than 4 times the base width; and ties are placed at each end and at horizontal intervals of no more than 30 ft. Ties must be attached where horizontal members support both inner and outer legs (c)(1)(i), and to parts of the structure strong enough to take the loads, never to window frames, downpipes or railings.

Worked problem

Laying out ties

A scaffold 50 ft high and 5 ft wide runs 90 ft along a building. Use the OSHA default tie pattern. How many ties are needed?

Show solution
  1. Lowest tie ≤ 4 × 5 = 20 ft. Next tie ≤ 20 + 26 = 46 ft. The top tie at 46 ft is 4 ft below the top, within 20 ft. So there are 2 tie levels.
  2. Horizontally, ties at each end and every 30 ft: 0, 30, 60 and 90 ft, so 4 ties per level.
  3. Total = 2 × 4 = 8 ties.
  4. If the scaffold is enclosed with sheeting, wind loads increase and a qualified person must design more ties.

Answer: 8 ties: 2 levels of 4. Sheeting or netting would require a qualified person to design additional ties.

Sheeting, netting and signs

Enclosing a scaffold with plastic sheeting for winter work, debris netting for public protection or large advertising banners greatly increases the wind load. A sheeted scaffold may need several times as many ties as an open one. Never add sheeting, netting or banners without the approval of the competent person and, usually, an engineer's tie design. Remove or open sheeting before storms if the design requires it.

Never remove ties or braces without authority

Ties and braces are sometimes in the way: a window frame needs fitting, a brace blocks material delivery. Removing them without authority is one of the most dangerous things a scaffold user can do. Only the competent person may alter ties or braces, and only after installing an alternative tie or confirming that the scaffold remains stable. If a tie must come out, a replacement goes in first, nearby.

Mobile scaffolds and rolling towers

Mobile scaffolds are popular indoors because they are quick to move along the work. They also introduce specific hazards: rolling while someone is on them, tipping when a caster drops into a hole or hits an obstruction, and overturning when they are too tall for their base.

A rolling tower on four locking casters with a guarded top platform and an internal ladder. Dimensions show the minimum base width and the platform height, with labels for the 4 to 1 limit when stationary and 2 to 1 when riding is permitted. Notes show casters locked and the floor within 3 degrees of level.
Key rules for mobile scaffolds.
  • Height: keep within the 4 to 1 height-to-base ratio when stationary unless outriggers or restraint are used, and within 2 to 1 if workers will ride while it is moved (1926.452(w)(6)(ii)).
  • Casters: lock casters with positive wheel and swivel locks when the scaffold is stationary (1926.452(w)(2)), and pin or secure caster stems in the legs (w)(9).
  • Moving: workers may ride only if the surface is within 3 degrees of level and free of pits, holes and obstructions, the ratio is 2 to 1 or less, outriggers are on both sides if used, power propulsion is no faster than 1 ft per second, and nobody is on any part extending beyond the wheels (1926.452(w)(6)). Manual force should be applied as close to the base as practicable and no more than 5 ft above the floor (w)(3). Many employers simply prohibit riding.
  • Surface: use mobile scaffolds only on firm, level, smooth floors. Watch for floor openings, trenches, ramps, cables and edges of slabs.
  • Platform: guardrails on all sides, internal access by ladder frame or stair, and hatches that close.
  • Overhead: watch for beams, lights, sprinklers and power lines when moving.

Worked problem

Can this tower be moved with a worker on it?

A rolling tower has a base 4 ft by 8 ft and a platform 9 ft high on a level, clear concrete floor, with no outriggers. A painter wants a co-worker to push the tower along while she stays on the platform. Is this allowed under OSHA?

Show solution
  1. Minimum base width = 4 ft. Ratio = 9 ÷ 4 = 2.25.
  2. OSHA allows riding only if the ratio is 2 to 1 or less.
  3. The painter must climb down before the tower is moved, or the platform must be lowered to 8 ft or less, with every other riding condition met.

Answer: No. At 2.25 to 1 the tower exceeds the 2 to 1 riding limit.

Loading for stability

Keep loads within the rated capacity and spread them evenly. Do not stack materials against guardrails, lean ladders against guardrails, or hang loads from the outside of the scaffold. Hoist arms and gin wheels need to be part of the design, with ties near them to take the extra forces. Never use the scaffold as an anchor for fall protection unless the competent person and engineer confirm that it is designed for it.

Types of ties

Ties come in several forms, chosen by the competent person or engineer to suit the building:

  • Through ties pass through an opening such as a window and clamp to a tube on the inside face, resisting push and pull.
  • Reveal ties wedge a tube between the sides of an opening; they depend on friction and are used only where permitted and checked regularly.
  • Anchor ties use bolts or anchors drilled into the building and tested to confirm their capacity.
  • Box ties wrap around a column or structural member.
  • Raker or buttress braces brace the scaffold from the ground where no tie point is available.

Anchors drilled into masonry or concrete are often proof-tested, with a sample pulled to a set load to confirm that the wall can hold them. A tie is only as strong as the weakest link: the anchor, the coupler and the part of the building it is fixed to.

Stability on uneven ground and slopes

On sloping ground, screw jacks level the scaffold within their limits, and stepped sills or engineered bases deal with larger slopes. The downhill legs carry more of the load when the scaffold leans, so foundations there need extra care. A scaffold that starts slightly out of plumb becomes more unstable as it gets taller, which is why the competent person checks plumb and level at the first lift before building higher.

Worked problem

How outriggers change the ratio

A rolling tower has a base 2.5 ft wide and 6 ft long. The platform must be at 12 ft. The manufacturer's outriggers increase the effective base width to 6 ft. What is the height-to-base ratio with and without outriggers?

Show solution
  1. Without outriggers: 12 ÷ 2.5 = 4.8, over 4.
  2. With outriggers: 12 ÷ 6 = 2.0, within 4 and at the 2 to 1 riding limit.
  3. Outriggers must be fitted as the manufacturer directs, on both sides, and in contact with the floor.

Answer: 4.8 to 1 without outriggers, which is unacceptable, and 2 to 1 with them.

Wind and stopping work

Wind loads increase with the square of the wind speed, so a gust twice as strong pushes four times as hard. A scaffold that is comfortable in a light breeze can be at its limit in a storm. Site rules usually set a wind speed above which work stops, and the competent person inspects after strong winds before work resumes. Loose items, such as sheeting, tarps, empty buckets and boards, should be secured or removed before a storm so they do not become missiles.

Stability is invisible until it is lost. That is why the rules on ties, ratios, outriggers and casters must be followed every time, even when the scaffold seems solid.

Common mistakes

  • MistakeBuilding a tall, narrow free-standing tower to save time.

    InsteadTie, guy or brace above 4 to 1.

  • MistakeRemoving a tie to fit a window and planning to replace it later.

    InsteadOnly the competent person alters ties, installing a replacement first.

  • MistakeAdding sheeting or a banner without checking ties.

    InsteadSheeting increases wind load; get an engineered tie design.

  • MistakePushing a rolling tower with someone on the platform.

    InsteadFollow the riding limits strictly or clear the platform before moving.

  • MistakeLeaving casters unlocked while working.

    InsteadLock every caster whenever the tower is in use.

Summary and key terms

  • Scaffolds tip from wind, sideways forces, uneven loads, soft ground, removed ties and impacts.
  • Restrain supported scaffolds when height exceeds 4 times the minimum base width.
  • Default ties: lowest at 4 times base, then every 20 ft (3 ft wide or less) or 26 ft (wider), and every 30 ft horizontally.
  • Sheeting, netting and banners greatly increase wind load and need engineered tie designs.
  • Only the competent person may alter ties or braces, installing replacements first.
  • Mobile scaffolds: lock casters, keep within 4 to 1, and allow riding only within 2 to 1 and the other (w)(6) conditions.
  • Spread loads evenly and keep hoists, chutes and brackets within the design.
Height-to-base ratio
Scaffold height divided by its smallest base dimension.
Tie
A connection that holds a scaffold to a building or structure.
Guy
A cable or rod from a scaffold to a ground anchor.
Outrigger
An extension at the base that widens the footprint of a scaffold.
Buttress
An additional frame or bracing that stabilizes a scaffold from the side.
Sheeting
Plastic or fabric enclosing a scaffold, which increases wind load.
Debris netting
Mesh on the scaffold face that catches small falling objects.
Caster
A swivelling wheel on a mobile scaffold leg.
Riding
Remaining on a mobile scaffold while it is moved.
Eccentric load
A load placed off center, which shifts the center of gravity.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. A scaffold base is 4 ft wide. Above what height must it be restrained?

    Show answer

    16 ft.

  2. Why do sheeted scaffolds need more ties?

    Show answer

    Sheeting acts like a sail and greatly increases wind load.

  3. Where must ties be attached?

    Show answer

    Where horizontal members support both inner and outer legs, to strong parts of the structure.

  4. Who may remove a tie?

    Show answer

    Only the competent person, after installing a replacement or confirming stability.

  5. What must happen to casters when a rolling tower is in use?

    Show answer

    All casters must be locked.

  6. Under OSHA, what is the maximum ratio for riding a mobile scaffold?

    Show answer

    2 to 1.

  7. Name three things to check before moving a rolling tower.

    Show answer

    Path clear, floor level and free of holes, overhead hazards, and loose materials removed.

  8. Why must hoist arms be part of the design?

    Show answer

    They add loads outside the base and need nearby ties.

  9. What is a guy?

    Show answer

    A cable or rod from the scaffold to a ground anchor.

  10. Can a scaffold be used as a fall arrest anchor?

    Show answer

    Only if the competent person and engineer confirm it is designed for it.