Bernie keeps a photograph on her phone that she shows every new apprentice. It is the inside of a ceiling at a school Coldstream did not insulate, taken the summer after it opened: a chilled water line wrapped in glass fibre with an all-service jacket, every butt joint left untaped, and under each joint a brown stain on the ceiling tile. The insulation was the right material and the right thickness. It failed because the vapour retarder had gaps. "On hot work, a gap costs some heat," she told Devon. "On cold work, a gap is a hole for water to get in, and it never stops."

Cold piping, such as chilled water, domestic cold water, storm drainage, refrigerant suction lines and some process lines, is colder than the air around it for much or all of the year. Water vapour in the air moves toward the cold pipe and condenses wherever it reaches a surface below its dew point. The vapour retarder is the layer that stops the vapour from reaching the cold parts of the insulation. This lesson explains why vapour moves, how to tell when a surface will sweat, which materials act as vapour retarders, and how to keep the vapour retarder continuous through every joint, fitting, support and termination.

Why water vapour moves toward cold pipe

Air always holds some water vapour. Warm air can hold more than cold air. The amount of vapour in the air creates a vapour pressure, and vapour moves from places of higher vapour pressure to places of lower vapour pressure, just as heat moves from hot to cold. Around a cold pipe, the air close to the pipe is cold, and the vapour pressure at the cold surface is low, so vapour moves inward, toward the pipe, all the time the pipe is cold. This inward movement is called vapour drive.

Fibrous insulation such as glass fibre slows heat but hardly slows vapour at all; vapour passes through it almost as easily as through air. If nothing stops the vapour at the outside of the insulation, it travels inward until it reaches a layer that is colder than its dew point, and there it condenses into water. On a chilled water line, that layer is inside the insulation, close to the pipe. The water soaks the fibres, the wet insulation conducts heat much better than dry insulation, the pipe surface gets colder still, and more vapour condenses. In winter the vapour drive on some lines stops or reverses, but on chilled water serving a hospital all year, it never stops.

A cross-section of an insulated cold pipe in warm, humid air. Arrows of water vapour move inward from the room toward the pipe. On the left half, a continuous vapour retarder at the outside of the insulation stops the arrows; on the right half, a gap in the retarder lets vapour pass into the insulation, where water droplets form near the cold pipe.
Vapour drives inward toward a cold pipe; a continuous vapour retarder at the warm side stops it.

Dew point

The dew point of air is the temperature at which its water vapour starts to condense. It depends on the air's temperature and its relative humidity (RH), the amount of vapour in the air compared with the most it could hold at that temperature. Warm, humid air has a high dew point; cool, dry air has a low one. A surface colder than the dew point of the air around it collects condensation.

Approximate dew points for some common air conditions, calculated with the Magnus formula used in psychrometric software.
Air conditionDew point (approximate)
22 °C (72 °F), RH 40 in 100 (a dry winter office)8 °C (46 °F)
24 °C (75 °F), RH 50 in 100 (a typical conditioned space)13 °C (55 °F)
29 °C (84 °F), RH 75 in 100 (a humid summer ceiling space or mechanical room)24 °C (75 °F)
32 °C (90 °F), RH 80 in 100 (very humid, unconditioned space)28 °C (83 °F)

Chilled water at Mountview is supplied at about 7 °C (44 °F). Domestic cold water in spring can be 4 to 7 °C (40 to 45 °F). Both are well below the dew point of almost any indoor air in summer, so both will sweat if bare and will soak their insulation if the vapour retarder leaks.

Worked problem

Will the jacket surface sweat?

An NPS 6 chilled water main at 7 °C runs through a mechanical room that, on a humid August afternoon with the doors open, reaches 29 °C at 75 in 100 RH. Its dew point is about 24.1 °C. A heat flow calculation like those in INS-120 gives these surface temperatures for glass fibre with ASJ: 13 mm, 23.9 °C; 25 mm, 26.1 °C; 38 mm, 27.1 °C. Which thicknesses keep the surface dry?

Show solution
  1. 13 mm: 23.9 °C is below the 24.1 °C dew point, so the surface sweats.
  2. 25 mm: 26.1 °C is 2.0 °C above the dew point, so the surface stays dry under these conditions.
  3. 38 mm: 27.1 °C is 3.0 °C above the dew point, a better margin.

Answer: 25 mm or more keeps the outside dry, and the Mountview schedule calls for 38 mm on chilled water NPS 1 1/2 and larger. But the thickness only protects the outside surface. If the vapour retarder has gaps, vapour still reaches the cold inside of the insulation, however thick it is.

That last point is the heart of this lesson. Thickness keeps the outer surface above the dew point; the vapour retarder keeps vapour out of the cold inside. Both are needed.

Vapour retarder materials

A vapour retarder is a material with a very low water vapour permeance, the rate at which vapour passes through it under a given difference in vapour pressure. Permeance is measured by ASTM E96 and reported in nanograms per pascal second square metre, ng/(Pa·s·m²), with the US unit, the perm, also seen on product data; one perm is about 57 ng/(Pa·s·m²). The lower the number, the better the retarder. Common vapour retarders on cold piping are:

  • All-service jacket (ASJ), the factory jacket of kraft paper, scrim and foil, made to ASTM C1136, which sets a maximum permeance of about 1.1 ng/(Pa·s·m²), or 0.02 perm, for its main types. The foil is the vapour retarder; the paper protects it.
  • Low-permeance film jackets, such as polyvinylidene chloride (PVDC) or metallized film laminates, used where very low permeance is wanted, for example on refrigeration or below-freezing lines.
  • Vapour retarder mastics and coatings, applied by brush, trowel or spray, usually with a reinforcing fabric, on fittings, irregular shapes and cellular glass systems.
  • Vapour retarder tapes, matched to the jacket, for butt strips, seams and repairs.
  • Closed-cell insulations that are themselves resistant to vapour: flexible elastomeric foam, whose foam and glued joints together form the retarder, and cellular glass, which is essentially impermeable but whose joints must be sealed.

Metal and PVC jackets are not vapour retarders on their own, because their seams are not sealed against vapour. On cold work they go over a separate, sealed vapour retarder and protect it. INS-220 covers jacketing.

Worked problem

Converting permeance

A PVDC film jacket is listed at 0.01 perm. What is that in metric units, and how does it compare with ASJ at 1.1 ng/(Pa·s·m²)?

Show solution
  1. Metric value: 0.01 × 57.2 ≈ 0.57 ng/(Pa·s·m²).
  2. Comparison: 0.57 ÷ 1.14 = 0.5, half the permeance of ASJ at its limit.

Answer: About 0.57 ng/(Pa·s·m²), half that of ASJ. Both are excellent retarders in sheet form; in practice, the seams and joints decide how well either works.

Continuity: the whole job

A vapour retarder works only if it is continuous. One open butt joint, one staple hole, one unsealed fitting cover or one hanger clamped to the pipe is enough to let vapour into the system. On a cold line, every one of these must be sealed:

  • Longitudinal laps: SSL laps pressed firmly along their full length. On some specifications, laps on cold work are also coated with vapour retarder mastic or covered with tape.
  • Butt joints: sealed with butt strips of vapour retarder tape, pressed into place all round.
  • Fittings: PVC fitting covers sealed at every seam and both ends with vapour retarder tape or the cover maker's adhesive, or fittings coated with vapour retarder mastic and fabric lapped onto the adjacent jacket.
  • Supports: inserts with their own vapour retarder lapped and sealed to the jacket on each side, as lesson 5 described, and shields outside the vapour retarder.
  • Penetrations: thermometer wells, pressure taps, drain valves, hanger rods that cross the insulation and any other item that passes through the jacket, sealed around with mastic.
  • Terminations: wherever the insulation ends, at a valve, a piece of equipment, a flange or a change of system, the insulation is sealed to the pipe with vapour retarder mastic so that vapour cannot travel along the pipe surface under the insulation.
  • Staples: none, or every one sealed, as lesson 4 described.
A cold pipe run with numbered callouts at each place the vapour retarder must be sealed: the longitudinal lap, a butt strip at a joint, a fitting cover with sealed seams and ends, a hanger with an insert and shield, a thermometer well penetration sealed with mastic, and a termination at a valve where the insulation is sealed to the pipe.
Every lap, joint, fitting, support, penetration and termination must be sealed on cold work.

Vapour stops

A vapour stop is a seal between the insulation system and the pipe, made by coating the end of the insulation and a short length of the pipe with vapour retarder mastic, or with a sealant recommended by the maker, so that vapour cannot travel along the pipe surface beneath the insulation. Vapour stops are required at every termination, such as each side of a valve, pump or flange left uninsulated or insulated separately, and at points where one insulation system meets another. Many specifications also call for vapour stops at intervals along long runs, so that if water does get in at one point, it is confined to a short section instead of spreading along the whole line. The specification gives the spacing where it is required.

On elastomeric foam systems, the foam is glued to the pipe at terminations with the maker's adhesive for the same purpose. On cellular glass systems on refrigeration lines, the joints themselves are sealed with a joint sealant, and vapour stops are formed at intervals and terminations as the specification describes.

Working practices for cold work

Cold work is unforgiving, and a few working rules prevent most failures:

  • Install only as much insulation as you can seal the same day. A run left with open laps or unsealed joints overnight can collect moisture before it is closed, and the line may be put into service before anyone returns. The National Insulation Association gives the same advice for below-ambient systems.
  • Insulate only clean, dry pipe. Never insulate a cold line that is already sweating; have the line shut down or warmed, dry it and then insulate.
  • Keep tape and adhesive within their temperature limits, and keep surfaces free of dust and drywall mud, which stop adhesives from bonding.
  • Do not puncture the jacket. Avoid staples, nails and screws through the vapour retarder; repair any accidental damage at once with the specified tape or mastic.
  • Inspect each section before moving on, looking for open seams, lifted strips, gaps at fittings and unsealed penetrations.
  • On a chilled water job with jacketing, make sure the vapour retarder is complete and inspected before the jacket goes over it and hides it.

At Mountview, the chilled water mains were insulated with glass fibre and ASJ, with high-density foam inserts at hangers and PVC fitting covers on elbows and tees, and in the mechanical room a PVC jacket over the top for protection. Bernie inspected every run herself before the jacketing crew was allowed to cover it, and she marked each inspected run on the floor plan with the date and her initials.

Repairing wet insulation on cold lines

When a cold line's insulation is found wet, for example from a stain on a ceiling or ice on a refrigeration line like the Kellerton ammonia suction line in INS-110, the repair is not to patch the outside. The wet insulation must be removed back to dry material, the source of the leak found and corrected, the pipe dried, and new insulation installed with a continuous vapour retarder and vapour stops at each end of the repair, sealed to the existing insulation. On a refrigeration line, the plant may need to warm the line or take it out of service so the pipe can be dried. Wet insulation left in place keeps wicking water along the pipe and, on carbon steel, causes corrosion under the insulation.

Common mistakes

  • MistakeLeaving butt joints untaped on cold work because the sections have an ASJ.

    InsteadSeal every butt joint with a vapour retarder butt strip.

  • MistakeRelying on thickness alone to prevent condensation.

    InsteadThickness keeps the outside dry; only a continuous vapour retarder keeps vapour out of the cold inside.

  • MistakeTreating a PVC or metal jacket as the vapour retarder.

    InsteadInstall and seal a separate vapour retarder underneath the jacket.

  • MistakeLeaving terminations at valves unsealed.

    InsteadForm vapour stops by sealing the insulation to the pipe at every termination.

  • MistakeInsulating a cold line that is already sweating.

    InsteadHave the line shut down or warmed and dried, then insulate.

  • MistakeLeaving open laps overnight.

    InsteadInstall only what can be sealed the same day.

Summary and key terms

  • Vapour moves from warm, humid air toward cold pipe and condenses wherever it meets a surface below its dew point.
  • The dew point depends on air temperature and relative humidity; chilled and domestic cold water are below it in most summer air.
  • Thickness keeps the outer surface above the dew point; a continuous vapour retarder keeps vapour out of the cold inside.
  • Vapour retarders include ASJ (ASTM C1136, permeance up to 0.02 perm), low-permeance films, mastics and tapes; elastomeric foam and cellular glass act as retarders when their joints are sealed.
  • Metal and PVC jackets protect the vapour retarder but are not retarders themselves.
  • Seal laps, joints, fittings, supports, penetrations and terminations; form vapour stops at terminations and at intervals where specified.
  • Install only what can be sealed the same day, never on sweating pipe, and remove wet insulation rather than patching over it.
Vapour drive
The movement of water vapour from higher to lower vapour pressure, toward a cold surface.
Dew point
The temperature at which water vapour in air begins to condense.
Relative humidity
The amount of water vapour in air compared with the most it could hold at that temperature; RH.
Vapour retarder
A layer with very low water vapour permeance that limits vapour movement into insulation.
Permeance
The rate at which water vapour passes through a material under a given vapour pressure difference.
Perm
A unit of permeance; one perm is about 57 ng/(Pa·s·m²).
Vapour stop
A seal between the insulation system and the pipe that stops vapour from travelling along the pipe surface.
Termination
A point where an insulation system ends, such as at a valve or a piece of equipment.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. Why does vapour move toward a cold pipe?

    Show answer

    The vapour pressure at the cold surface is low, and vapour moves from high to low vapour pressure.

  2. A space is at 24 °C and RH 50 in 100. Will a pipe surface at 15 °C sweat?

    Show answer

    No; the dew point is about 13 °C, and 15 °C is above it.

  3. A surface at 22 °C is in air with a dew point of 24 °C. What happens?

    Show answer

    It sweats, because it is below the dew point.

  4. Is a PVC jacket a vapour retarder on cold work?

    Show answer

    No; it protects a separate, sealed vapour retarder underneath.

  5. Where must vapour stops always be made?

    Show answer

    At every termination, such as each side of a valve or piece of equipment where the insulation ends.

Lesson quiz · 5 questions

Score 60% or more to complete this lesson.