MSBA-250 · Lesson 12 of 12 · 28 min

Case study: a field inspection data model

▶ Video coming soon A video version of this lesson is on the way.

Three months after the first whiteboard session, Rupert asked Signe for a design document he could file with the privacy office and hand to whoever maintains the solution after her. "Everything we decided," he said, "and why, on as few pages as possible." This lesson is that document, followed by a set of problems that test the same decisions on a new situation. It brings together every lesson in the course: design, tables and columns, relationships and behaviours, calculations, choices and keys, business rules, security roles and teams, business units, column security, auditing and data movement.

Read the design as a model answer to the question "how should a field inspection solution store and protect its data?" Then work through the problems at the end before reading the suggested answers. Exam AB-410 scenarios look like these: a short business story, a requirement, and a choice between features that sound similar.

Part 1: the requirements

The facilities department inspects every building on three campuses at least twice a year using checklists that depend on the type of room. Every checklist item checked produces a result. Failures need a note, a priority and often a photo, and are repaired by the trades crew. An inspection closes only when its failures are resolved. Inspectors work on phones; supervisors work on laptops; a director oversees all campuses; contractors inspect elevators; the health and safety office handles injuries; and an analyst reports across everything. Regulators can ask for seven years of evidence. A maintenance system sends building changes nightly.

Part 2: tables

The seven tables of the inspection model.
TableType and ownershipPrimary columnPurpose
BuildingStandard, user or team ownedBuilding NameOne row per building; Building Code alternate key
RoomStandard, user or team ownedRoom Code, such as OSC-114One row per room; key on Building plus Room Number
Room TypeStandard, organization ownedNameKinds of room: chemistry lab, office, stairwell
Checklist ItemStandard, organization ownedNameThings to check: eyewash station, extinguisher
Template ItemStandard, organization ownedAutonumberManual many-to-many of Room Type and Checklist Item with Sequence and Safety Critical
InspectionStandard, user or team ownedInspection Number, autonumberOne walk-through of one building by one inspector
FindingStandard, user or team ownedFinding Number, autonumberOne result for one checklist item in one room

The standard User table represents inspectors and the standard Contact table represents contractors. Every table and column has a description written for people and for Copilot. All components live in the Lumenvale Facilities solution with the lcc publisher prefix.

The final model. Building one-to-many Room. Room Type one-to-many Room. Room Type one-to-many Template Item, Checklist Item one-to-many Template Item. Building one-to-many Inspection. Inspection one-to-many Finding, marked parental. Room one-to-many Finding and Checklist Item one-to-many Finding, both marked restrict delete. User linked to Inspection as Inspector. Contact linked to Inspection as Contractor.
The finished field inspection data model with relationship behaviours.

Part 3: key columns

Important columns and their types.
TableColumnTypeNotes
InspectionScheduled DateDate onlySame date for everyone
InspectionCompleted OnDate and time, user localA moment in time
InspectionStatus ReasonBuilt-inScheduled, In progress; Completed, Cancelled
FindingResultChoicePass, Fail, Not applicable
FindingPriorityChoiceLow, Medium, High
FindingNoteMultiple lines of textRequired for failures
FindingPhotoImageFile capacity
FindingSafety CriticalYes/NoCopied from the template item when created
FindingInjured Person, Injury DetailsText, securedColumn security profiles
FindingDays OpenFormulaPower Fx from Found On and Resolved On
FindingPlain SummaryPromptOne sentence from the note; not audited
InspectionOpen FailuresRollupCount of failed, open findings
BuildingCampusChoice (global)Shared with other tables

Part 4: relationships and behaviours

Relationship decisions.
RelationshipBehaviourReason
Building to RoomReferential, restrict deleteBuildings with rooms cannot be deleted by accident
Building to InspectionReferential, restrict deleteInspection history is evidence
Inspection to FindingParentalFindings belong to their inspection; assign and share cascade
Room to FindingReferential, restrict deleteFinding already has a parental parent; history is protected
Checklist Item to FindingReferential, restrict deleteItems with history cannot be deleted; retire them instead
Room Type and Checklist Item through Template ItemManual many-to-manyThe link holds Sequence and Safety Critical

Part 5: logic

Business rules with Entity scope enforce the rules that must hold for every source: Completed On cannot be before Scheduled Date; a failed finding needs a priority and a note; a change from Fail to Pass needs a resolution note. A form-scoped rule shows the Photo column only for failures. A rule sets Priority to High for safety-critical failures. A plug-in blocks completing an inspection while any of its findings is failed and open, because that rule needs related rows. A cloud flow notifies the trades crew of high-priority failures after they are saved. A business process flow guides supervisors through Review, Assign repairs, Verify and Close.

Part 6: security

The security design in one table.
WhoBusiness unitRole (through a Microsoft Entra group team)Inspection and Finding accessColumn profile
InspectorTheir campusLumenvale InspectorCreate, read, write, append at user levelIncident Recorders (create only)
Campus supervisorTheir campusLumenvale Campus SupervisorRead, write, assign, share at business unit levelNone
Facilities directorRootLumenvale Facilities DirectorRead and write at parent: child business units levelNone
Lab safety officerRidgeview CampusInspector, plus Lab Safety Reviewer from Downtown and LakeshoreMatrix access to lab inspectionsNone
ContractorRootLumenvale Contractor (minimal)Through access team sharing on specific inspectionsNone
Health and safety officerRootLumenvale Health and SafetyRead at organization levelHealth and Safety (read, create, update)
Report readerRootLumenvale Report ReaderRead at organization levelNone

Record ownership across business units is on, so central inspectors' inspections can belong to the campus where the building is. Hierarchy security is off, by decision. No formula, calculated, rollup or prompt column uses a secured column. The privilege to view audit history and the export privilege are limited to supervisors, administrators and the privacy office.

Part 7: auditing and data movement

Auditing is on for the environment, with access logging, and on for Inspection, Finding, Building, Room and the template tables; Plain Summary and the prompt companion columns are excluded. Retention is seven years, matching the records schedule, and expected log growth is in the capacity plan. The nightly maintenance feed is a dataflow that upserts buildings by Building Code. Historical inspections were unpivoted in Power Query and loaded once. Checklist templates move between environments with the Configuration Migration tool. Analytics use a direct Power BI connection, and the data warehouse uses the Fabric link.

Part 8: problems

The college now wants a second solution for lab equipment calibration. Each lab has instruments such as balances, pH meters and fume hood monitors. Each instrument must be calibrated on a schedule set by its type, by either in-house technicians or an external calibration company. Each calibration produces a pass or fail, readings, a certificate file and the next due date. Failed instruments must be tagged out of service. Lab managers on each campus see their campus's instruments; the external company sees only the instruments it is asked to calibrate; the college's quality office sees everything; certificate files must be kept for ten years. Work through the problems before reading the answers that follow.

Worked problem

Problem 1: tables and ownership

Which tables does the calibration solution need, and which should be organization owned?

Show solution
  1. Instrument: one row per physical instrument, user or team owned so campus teams own their instruments. It looks up Room from the inspection model, reusing the existing table.
  2. Instrument Type: balances, pH meters and so on, with the calibration interval in days; organization owned reference data.
  3. Calibration: one row per calibration event, user or team owned, with a parental relationship from Instrument so calibrations follow their instrument's ownership and sharing.
  4. Calibration Reading: optional, one row per reading if several readings are recorded per calibration, as a child of Calibration rather than numbered columns.
  5. The external company is an Account, and its technicians are Contacts, using standard tables whose meaning matches.

Answer: Instrument, Calibration and optionally Calibration Reading as user- or team-owned tables, Instrument Type as organization-owned reference data, and Account and Contact for the external company.

Worked problem

Problem 2: calculations

How should the solution show each instrument's next due date and whether it is overdue?

Show solution
  1. The next due date depends on the latest calibration and the interval of the instrument's type.
  2. A rollup column on Instrument can hold the latest calibration date: the maximum Calibrated On of related calibrations with Result Pass.
  3. A formula column on Instrument adds the type's interval to the latest calibration date to give Next Due, reading the interval through the Instrument Type lookup.
  4. A second formula column compares Next Due with today to give an Overdue yes or no value, always current when read.
  5. Because the rollup refreshes on a schedule, the form offers recalculation after a calibration is saved, or a flow triggers it.

Answer: A rollup for the latest passing calibration date, then formula columns for Next Due and Overdue.

Worked problem

Problem 3: rules and logic

Failed instruments must be tagged out of service, and a calibration cannot be saved without a certificate when it is done by the external company. Where does each rule belong?

Show solution
  1. Tagging out of service changes the Instrument row when a Calibration is saved with Result Fail. That touches a related row, so a business rule on Calibration cannot do it; a plug-in or low-code plug-in can do it synchronously, or a cloud flow can do it immediately afterwards if a short delay is acceptable.
  2. The certificate rule is on the Calibration row itself: if Performed By equals External and Certificate does not contain data, show an error. An Entity-scoped business rule can check whether a file column contains data only if file columns are supported in its conditions; if not, a low-code plug-in or the app enforces it. Check support before relying on it.
  3. Either way, validation that must block the save belongs in synchronous logic.

Answer: Use server-side logic for the related-row update and synchronous validation for the certificate requirement, checking which column types business rules support.

Worked problem

Problem 4: security

Lab managers see their campus's instruments; the external company sees only instruments it is asked to calibrate; the quality office sees everything. Design it.

Show solution
  1. Reuse the campus business units. Lab managers hold a Lab Manager role with business-unit-level access to Instrument and Calibration, assigned through a Microsoft Entra group team.
  2. The quality office holds a role with organization-level Read, through its own group team.
  3. External technicians are users with a minimal role and no table-wide read on Instrument. An access team template on Instrument lets a lab manager add the company's technicians to the instruments it should calibrate; parental behaviour shares the related calibrations.
  4. If certificate files contained personal data, column security would be considered; here they do not.

Answer: Business units for campuses, roles through group teams for managers and the quality office, and an access team template for the external company.

Worked problem

Problem 5: retention and data

Certificates must be kept for ten years, and 600 instruments already exist in a spreadsheet. What about storage, auditing and the initial load?

Show solution
  1. Store certificates in a file column on Calibration, which uses file capacity; estimate the number and size of files over ten years for the capacity plan.
  2. Retention of the files is a records decision: calibrations with certificates must not be deleted for ten years, so restrict delete privileges and use restrict delete relationships to protect them.
  3. Audit Calibration and Instrument; the environment's audit retention covers the change history, separately from keeping the certificate files themselves.
  4. Load Instrument Type first, then Instruments from the spreadsheet with an alternate key on Asset Tag, mapping each to its Room by the Room alternate key.

Answer: File columns with a capacity plan, delete protection for ten years, auditing of the calibration tables, and an ordered import using alternate keys.

What the case study shows

The calibration problems are a new domain, but every answer reused a decision from the inspection model: describe the process before building; normalize repeated readings into rows; choose ownership deliberately; pick behaviours from the meaning of each relationship; use rollups to aggregate and formulas to present; put validation in synchronous logic and follow-up in asynchronous logic; express boundaries with business units and exceptions with access teams; protect a few sensitive columns with profiles; audit what is evidence; and design keys so data can be loaded and kept in step.

Rupert filed the design document with the privacy office the following week. Octavia asked for one more thing: a version she could show the facilities staff. Signe drew the seven boxes again, without the logical names, and wrote under it: "Every check you do is now a row. Every row is safe, and every change is recorded." It is pinned above the facilities office printer.

Common mistakes

  • MistakeAnswering scenario questions from feature names instead of requirements.

    InsteadStart from the requirement: who, which rows, which columns, which sources of data, how current.

  • MistakeReusing a design without checking ownership and behaviours for the new tables.

    InsteadDecide ownership and relationship behaviour afresh for each table.

  • MistakeExpecting business rules to change related rows.

    InsteadUse plug-ins, low-code plug-ins or flows for logic that touches other rows.

  • MistakeForgetting capacity when files and audit logs must be kept for years.

    InsteadEstimate file and log capacity over the retention period.

Summary and key terms

  • A complete Dataverse design covers tables, columns, relationships, calculations, keys, logic, security, auditing and data movement.
  • Every decision in the inspection model came from a requirement, and the reasons are recorded.
  • New solutions reuse the same patterns: normalization, deliberate ownership, behaviours, rollups and formulas, synchronous validation, business units and access teams, column security and auditing.
  • Scenario questions are answered by reading the requirement carefully and choosing the feature that runs where, and when, the requirement needs.
Design document
A record of a data model's decisions and the reasons for them.
Reference data
Rows that describe options or rules, such as room types, usually organization owned.
Evidence
Data that must be kept and protected because regulators or investigators may rely on it.
Capacity plan
An estimate of the database, file and log storage a solution will need over time.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. Why is Template Item organization owned while Inspection is user or team owned?

    Show answer

    Templates are reference data everyone reads and few change; inspections need per-user and per-campus access.

  2. In the calibration problem, why is the next due date a formula column and not a rollup?

    Show answer

    It is a row-level calculation from the latest calibration date and the type's interval; the rollup supplies the latest date and the formula adds the interval.

  3. Which feature gives the external company access to only the instruments it should calibrate?

    Show answer

    An access team template on Instrument, with sharing cascading to related calibrations.

  4. Name two decisions from this course that cannot be changed later.

    Show answer

    Any two of: table ownership, table type, schema names, column data types.

Lesson quiz · 5 questions