INS-310 · Lesson 10 of 12 · 23 min
Finishing and jacketing equipment
▶ Video coming soon A video version of this lesson is on the way.
On Wednesday, September 30, the last day of the blancher tank job, Wendell unloaded a crate of stainless steel sheet from the van. "Most of our equipment jacket is aluminum," he told Priya. "Not here. This tank gets hosed with hot water and cleaning chemicals twice a shift. Aluminum would pit, and every open lap would be a pocket for food scraps." The plan was smooth Type 304 stainless jacket, every lap shingled and sealed with a food-grade sealant, the top edges capped and sloped so water ran off, and no exposed fiber anywhere. By late afternoon the tank looked like a piece of kitchen equipment, which, Wendell pointed out, is exactly what it is.
The finish is the outer layer of an insulation system: the jacket, coating or covering that protects the insulation from water, weather, damage, chemicals and sunlight, and gives it its appearance. INS-220 covered metal and PVC jacketing in detail, including vessel shells and heads. This lesson looks at the whole range of finishes used on equipment, how to choose among them, and the details that matter on large flat surfaces, irregular shapes, washdown areas and food plants.
Choosing a finish
The specification usually names the finish. When it gives a choice, or when you are asked to suggest one for a repair, think about:
- Location: indoors or outdoors; exposed to sunlight; in a washdown area; near chemicals or salt.
- Abuse: whether people will walk on it, lean ladders against it, or knock it with carts and forklifts.
- Temperature: hot or cold, and how hot. Some coatings and PVC have low temperature limits; cold service needs a vapor retarder finish.
- Shape: large flat or round surfaces take sheet jacket easily; irregular shapes with many nozzles may suit coatings or fabric better.
- Fire rules: in buildings, exposed finishes must meet the flame-spread and smoke limits that apply to their location.
- Appearance and cleaning: food, pharmaceutical and health-care areas need smooth, cleanable surfaces without crevices.
Metal jacket on equipment
Aluminum and stainless steel jacket are the most common finishes on industrial equipment. On vessels and tanks they are applied as INS-220 described: shell sheets lapped to shed water, heads covered with gores and a center cap, and every penetration collared. A few points matter especially on equipment:
- Stiffness on flat surfaces. Thin flat sheet over a large flat or gently curved surface ripples and drums, a defect called oil canning, and dents easily. Large flat surfaces are jacketed with corrugated, box-rib or stucco-embossed sheet, which is stiffer, or with thicker sheet. Flat stainless on the blancher tank was acceptable because the panels were small and well supported by rigid board.
- Laps that shed water. Horizontal laps are shingled, upper sheet over lower; vertical laps face away from the prevailing weather or the washdown spray; top surfaces slope or are crowned so water runs off; top edges are capped. INS-220's rule applies everywhere: water must run over every lap, never into it.
- Fastening. On hot equipment, jacket may be held by bands, sheet metal screws or rivets at the laps. On cold equipment, no fastener may pierce the vapor retarder (lesson 9); bands and sealed laps only. Match fastener metals to the jacket to avoid galvanic corrosion, as INS-220 explained.
- Movement. Long or hot equipment needs slip joints in the jacket (lesson 5).
- Support. On tall vertical surfaces, jacket is hung from clips at each lap or carried by support rings, so it does not slide (lesson 3).
Worked problem
Stainless sheet for the blancher tank
Over its 3 in of insulation, the blancher tank's jacket covers two long walls 10 ft 6 in × 4 ft 3 in, two end walls 5 ft 6 in × 4 ft 3 in and a bottom 10 ft 6 in × 5 ft 6 in. The stainless comes in sheets 48 × 96 in. Allow 1 in 10 for laps, then round up and add one sheet for cutting waste. How many sheets are needed?
Show solution
- Long walls: 2 × 10.5 × 4.25 = 89.25 ft².
- End walls: 2 × 5.5 × 4.25 = 46.75 ft².
- Bottom: 10.5 × 5.5 = 57.75 ft².
- Total = 193.75 ft²; with laps, 193.75 × 1.1 = 213.1 ft².
- One sheet = 4 × 8 = 32 ft². Sheets = 213.1 ÷ 32 = 6.7, so 7, plus 1 for waste = 8 sheets.
Answer: Eight sheets of stainless jacket.
Washdown and food areas
In food plants and other washdown areas, the finish must keep water out of the insulation and give dirt and bacteria nowhere to hide. Common requirements are:
- Stainless steel jacket or a smooth, cleanable PVC or coated finish, as the plant's sanitation rules allow.
- Every lap sealed, not just shingled, with a sealant approved for the area; no open laps or crevices where food or water can collect.
- Top edges and horizontal surfaces sloped or capped so water runs off; no ledges.
- No exposed fiber, staples or loose fasteners that could fall into product. Many plants ban glass, loose screws and some fastener types near open product.
- Terminations at the floor, at legs and at nozzles sealed and kept clear of the floor so the cleaning crew can wash under them.
Plants often have their own written standard for insulation in sanitary areas. Kellerton's standard, which Lou Brisebois gave Raj Sandhu before the blancher job was priced, calls for stainless jacket in all washdown rooms, sealed laps, and an inspection of the finish by the plant's sanitation lead before the equipment goes back into production.
PVC and fabric finishes
PVC jacket is common indoors on chilled water equipment, in mechanical rooms and in some food and pharmaceutical areas, because it is cleanable, light, and does not need fasteners that pierce a vapor retarder: its laps are solvent-welded. INS-220 covered its temperature and sunlight limits; on equipment it is formed in sheets and pre-curved pieces and sealed at every lap.
Canvas and glass cloth with lagging adhesive is a traditional indoor finish on equipment in mechanical rooms and boiler houses. Cloth is laid over the insulation and bonded with a lagging adhesive or coating that soaks into it and dries to a firm, paintable surface. It follows irregular shapes, is easy to repair, and can be painted to match the room, but it is not suitable outdoors or where it will be knocked.
Mastic and cement finishes
On irregular equipment, such as pumps, valve groups, the tops of separators and the heads of old vessels, a sheet jacket is hard to fit and may be impossible to seal. These shapes are often finished with a reinforced mastic: a coat of mastic, a layer of glass or polyester reinforcing fabric embedded in it, and a second coat over it, giving a tough, seamless skin. On hot equipment the mastic is a breather type that lets water vapor out but keeps rain and washdown water off; on cold equipment it is a vapor retarder mastic. The two must not be confused: a vapor retarder mastic on hot insulation traps moisture inside, and a breather mastic on cold insulation lets it in.
Under a mastic finish on rigid block, a coat of hard-setting insulating cement over wire mesh is often applied first to fill joints and give a smooth, strong base, as INS-210 described for fittings. Cement finishes are also used alone on very hot equipment that will be painted.
Worked problem
Mastic for the blowdown separator top
During the breeching week, Wendell and Priya refinished the irregular top of Kellerton's blowdown separator, about 34 ft², with hard-setting cement over mesh, then a reinforced breather mastic: two coats of 40 mils wet thickness each, with glass fabric between them lapped about 1 in 10. Using the rule from INS-210 that one gallon covers 1,604 ft² at one mil wet thickness, how much mastic and fabric are needed?
Show solution
- Mastic per coat = 34 × 40 ÷ 1,604 = 0.85 gal.
- Two coats = 1.7 gal, so a 5 gal pail or two 1 gal cans (allowing for waste on an irregular surface).
- Fabric = 34 × 1.1 = 37.4 ft², about 38 ft².
Answer: About 1.7 gal of mastic and 38 ft² of fabric.
Mastics are applied within the temperature and humidity limits on their data sheet, at the specified wet film thickness checked with a wet film gauge, and allowed to cure before they are exposed to rain or washdown.
Finishing at terminations and details
On equipment, the finish has to close the system at many more places than on pipe: nozzles, manways, nameplates, supports, skirts, legs, instrument connections and the edges of removable covers. At each one:
- The finish must overlap the insulation edge or an end cap, so no raw insulation is exposed.
- Joints between the finish and the equipment or the next system, such as pipe jacket meeting vessel jacket, must shed water and be sealed where the service or location needs it.
- Removable sections must have their own finish that overlaps the fixed finish when closed.
- Labels and identification required by the specification, such as equipment tags and service labels, go on after the finish, in the specified places, so they can be read.
Inspecting the finish
The finish is the part of the system everyone sees and the first line of defense, so it is inspected carefully before handover. Check that every lap sheds water and is sealed where required, that bands are tight and their seals in line, that there are no dents or open seams, that every penetration has its collar or sealant, that screws and rivets are where they are allowed and nowhere else, that mastic is at its thickness and fully covers the fabric, and that the finish is clean. On the blancher tank, Kellerton's sanitation lead inspected the finished jacket late on Wednesday afternoon, September 30, and asked for one change: a sealant bead along the bottom edge where the jacket met the tank leg, so nothing could lodge there. Priya ran the bead before she and Wendell left, and the tank went back into production on Thursday.
Painting and coating insulated equipment
Some owners want insulated equipment painted, for appearance, for color coding or to protect a cloth or cement finish. Paint goes only on finishes made to take it: canvas and glass cloth bonded with lagging adhesive, hard-setting cement, and some mastics once they have cured. It must be compatible with the finish below; a solvent paint can soften some mastics and coatings, and a paint that forms a vapor-tight film can trap moisture in hot insulation, just as the wrong mastic would. On cold equipment, the vapor retarder mastic or jacket is never replaced by paint. Metal jacket is normally left unpainted, because the paint peels from aluminum unless the jacket is factory-coated or properly primed. Where the specification calls for color bands or service labels instead, they are applied to the clean, finished surface at the spacing and positions it states.
Protecting finishes from damage
Equipment finishes are often damaged in the first weeks after they go on, by other trades still working nearby. Ladders leaned against jacketed vessels dent the jacket and split its laps; people stand on insulated pipe and nozzles to reach valves; welding sparks burn holes in PVC and cloth; forklifts strike the lower corners of breeching and tanks. Before leaving a finished area, look for the places that are likely to be hit and talk to the foreperson about protection: a temporary cover over a finished pump, a sign on a vessel, a guard angle where vehicles turn, or a walkway board across insulated piping on a roof. Where the plant owns the area, as at Kellerton, report the risk to the plant's contact, as happened at the forklift corner of the breeching in lesson 5, where Lou had a guard angle fitted. Report any damage you find on other people's work too; on cold systems, a dent in the jacket may hide a torn vapor retarder that will soak the insulation by spring.
Matching new finish to old
Repairs and extensions often meet an existing finish. Match the material, profile and color where you can, so the repair looks deliberate and sheds water the same way, and lap the new finish onto the old in the direction water runs, never the reverse. Where the old finish is a different metal, separate the two with a non-metallic sealant or tape at the lap so they do not form a galvanic couple. Where the old finish is a mastic or cloth, cut back to sound material, prime the edge as the coating maker says, and overlap the new reinforced mastic onto it by at least the width the data sheet gives. Record what was used, so the next person who repairs it knows what is there.
Common mistakes
MistakeUsing flat thin sheet on a large flat surface.
InsteadUse corrugated, box-rib or stucco sheet, or thicker sheet, to avoid oil canning.
MistakeUsing aluminum jacket in a chemical washdown area.
InsteadUse stainless steel or another finish the plant allows.
MistakePutting vapor retarder mastic on hot insulation.
InsteadUse breather mastic on hot work and vapor retarder mastic on cold work.
MistakeLeaving open laps or ledges in a food plant.
InsteadSeal every lap and slope or cap every top edge.
MistakeExposing mastic to rain before it cures.
InsteadFollow the data sheet's curing time and weather limits.
Summary and key terms
- The finish protects insulation from water, weather, damage, chemicals and sunlight.
- Choose by location, abuse, temperature, shape, fire rules and cleaning needs.
- Metal jacket on equipment needs stiffness on flat surfaces, water-shedding laps, correct fasteners, slip joints and support.
- Washdown and food areas need stainless or cleanable finishes, sealed laps, no ledges and no exposed fiber.
- PVC, cloth and lagging adhesive suit indoor work; reinforced mastic suits irregular shapes.
- Breather mastic on hot work, vapor retarder mastic on cold work; inspect every lap and termination before handover.
- Finish
- The outer layer of an insulation system: jacket, coating or covering.
- Oil canning
- Rippling or drumming of thin flat sheet jacket.
- Box-rib sheet
- Sheet jacket formed with stiffening ribs.
- Reinforced mastic
- A mastic finish with a reinforcing fabric embedded between coats.
- Breather mastic
- A mastic that lets water vapor out but keeps liquid water off, used on hot insulation.
- Vapor retarder mastic
- A mastic that slows water vapor, used on cold insulation.
- Lagging adhesive
- An adhesive coating used to bond and finish canvas or glass cloth.
- Wet film gauge
- A gauge used to check the thickness of wet mastic or coating.
Practice problems
Work each problem on paper first, then reveal the answer to check.
Why is corrugated or box-rib jacket used on large flat surfaces?
Show answer
It is stiffer and resists oil canning and dents.
Which mastic goes on cold insulation?
Show answer
A vapor retarder mastic.
How much mastic covers 50 ft² at 60 mils wet thickness?
Show answer
50 × 60 ÷ 1,604 = 1.87 gal.
Name two requirements for insulation finishes in a food washdown area.
Show answer
Any two: stainless or cleanable finish, sealed laps, sloped or capped tops, no exposed fiber or loose fasteners, sealed terminations clear of the floor.
Why are screws not used on cold equipment jacket?
Show answer
They pierce the vapor retarder.
Lesson quiz · 5 questions
Score 60% or more to complete this lesson.
Create a free account to save your progress, take quizzes and earn a certificate.