CIV-280 · Lesson 12 of 12 · 22 min

Environmental assessment and approvals

The cheapest time to prevent environmental harm is before a project is built. Environmental assessment (EA) is the process of predicting the environmental, social, health and economic effects of a proposed project, comparing alternatives, finding ways to avoid or reduce harm, and giving decision makers and the public the information they need to decide whether and how the project should proceed. Since the United States passed the National Environmental Policy Act in 1970, EA has spread to nearly every country. This lesson describes the general EA process, the federal systems in Canada and the United States and how they changed between 2023 and 2026, the other permits a typical water project needs, methods for predicting and judging impacts, and the role of the public and Indigenous peoples.

Willowbend's largest job this term is the environmental assessment of a new raw water intake on the Assiniboine River and an off-stream reservoir to store spring runoff for the city's treatment plant (lesson 7). The project would flood about 180 ha of farmland and a small wooded coulee, build a pumping station and intake screen in the river, and lay 6 km of pipeline. Martin leads the assessment; Nadia is responsible for the water quality and air quality chapters and the impact matrix.

The general environmental assessment process

A flow chart of a federal impact assessment in Canada: project description and planning phase, a decision on whether an assessment is needed, tailored guidelines, the proponent prepares an impact statement, the Agency or a review panel conducts the assessment with public and Indigenous participation, a decision on whether adverse effects within federal jurisdiction are justified in the public interest, conditions, and follow-up monitoring.
The main steps of a federal impact assessment under the Impact Assessment Act.

Whatever the jurisdiction, assessments follow similar steps. Screening decides whether a project needs an assessment at all and at what level. Scoping identifies the issues that matter, the valued components to study (such as fish, groundwater, air quality, heritage sites or Indigenous rights) and the boundaries in space and time. Baseline studies describe existing conditions, often over at least a full year to capture seasons. Impact prediction estimates how the project will change each component during construction, operation and closure, using the mass balance, kinetics, water quality and dispersion tools from earlier lessons. Mitigation designs measures to avoid, reduce or offset the effects, and residual effects are those that remain after mitigation. The significance of residual effects is then judged against criteria. Alternatives, including different sites, designs and the option of not proceeding, are compared. The process ends with a decision, conditions and a follow-up program that checks whether predictions were right and mitigation works.

Cumulative effects deserve special mention. A single project may have a small effect, but combined with past, present and reasonably foreseeable future projects in the same watershed or airshed, the total can be large. A river may handle one new outfall but not the fifth. Good assessments set study areas large enough to see these combined effects.

Federal assessment in Canada

Federal assessment in Canada is governed by the Impact Assessment Act of 2019, which replaced the Canadian Environmental Assessment Act, 2012, and is administered by the Impact Assessment Agency of Canada. It applies to designated projects listed in the Physical Activities Regulations, such as large mines, pipelines, dams and reservoirs above certain thresholds, and to projects on federal lands. The process has a planning phase, in which the Agency decides whether an assessment is needed and issues tailored guidelines; the proponent's impact statement; the assessment itself, by the Agency or, for the largest projects, an independent review panel; and a decision by the Minister or Cabinet. The Act sets legislated timelines for each phase, which can be paused or extended.

In October 2023 the Supreme Court of Canada, in a reference brought by Alberta, found that the core designated-projects scheme of the Act went beyond federal constitutional authority, because the screening and decision provisions were not limited to effects within federal jurisdiction. Parliament amended the Act in the Budget Implementation Act, 2024, No. 1, which received royal assent on June 20, 2024. The amendments narrowed the focus to adverse effects within federal jurisdiction, such as effects on fish and fish habitat, aquatic species at risk, migratory birds, federal lands, transboundary waters and Indigenous peoples; required decisions on whether those effects are likely to be significant and, if so, whether they are justified in the public interest; and broadened the ability to coordinate with or substitute provincial assessments. Alberta launched a new constitutional challenge to the amended Act later in 2024. In June 2025 the Building Canada Act, part of Bill C-5, added a separate fast-track path for projects that Cabinet designates as being in the national interest.

Provinces run their own assessment and licensing systems, which cover far more projects than the federal Act. In Manitoba, the Environment Act classifies developments and requires an environmental licence; a proponent files an environment act proposal, the public and other departments comment, and the director or minister issues a licence with conditions or refuses it. Most municipal water projects, including Willowbend's intake and reservoir, are assessed provincially. A federal assessment is triggered only if the reservoir exceeds the designated-project thresholds; even if it does not, federal approvals such as a Fisheries Act authorization may still be needed.

NEPA in the United States

The National Environmental Policy Act of 1970 requires US federal agencies to consider the environmental effects of their proposed actions, including funding and permits. Agencies use three levels of review: a categorical exclusion for classes of actions that normally have no significant effects, an environmental assessment that ends either in a finding of no significant impact (FONSI) or a decision to prepare an environmental impact statement (EIS) for actions that may significantly affect the environment. NEPA is procedural: it requires agencies to take a hard look at effects and alternatives, not to choose the least harmful option.

NEPA changed substantially between 2023 and 2026. The Fiscal Responsibility Act of June 2023 amended the statute itself, adding page limits (generally 150 pages for an EIS and 75 for an EA, longer for complex projects) and deadlines (generally two years for an EIS and one year for an EA), and naming a lead agency to coordinate reviews. In 2025 the Council on Environmental Quality, which had issued binding NEPA regulations since 1978, removed them with an interim final rule effective April 11, 2025, and made the removal final in January 2026; each agency now follows its own NEPA procedures, many of them revised in mid-2025. In May 2025 the Supreme Court, in Seven County Infrastructure Coalition v. Eagle County, held that courts must give agencies substantial deference on the scope and depth of their NEPA analyses and that agencies need not analyse the effects of separate upstream or downstream projects. Practitioners now check the procedures of the specific lead agency at the start of every project.

For Canadian engineers, NEPA matters for cross-border projects such as pipelines, power lines and bridges, which need both Canadian and US approvals.

Other approvals for a water project

An assessment rarely stands alone. A reservoir and intake typically need several permits, each with its own technical requirements:

Typical approvals for a water supply reservoir in Manitoba.
ApprovalAuthorityWhy it applies
Environmental licenceManitoba Environment ActThe reservoir, intake and pipeline are licensed developments
Water rights licenceProvincial water rights legislationDiverting and storing river water
Fisheries Act authorizationFisheries and Oceans CanadaHarmful alteration of fish habitat at the intake; screen design to prevent fish entrainment
Species at Risk Act permitsFederalIf listed species or critical habitat are affected
Navigable waters approvalTransport CanadaWorks in a navigable river
Heritage resources permitsProvincialArchaeological sites in the flooded area
Drinking water system approvalProvincial drinking water regulatorThe new source and treatment plant

Predicting and judging impacts

Impact prediction uses the quantitative methods of the field: water quality models predict downstream concentrations, dispersion models predict air quality, groundwater models predict drawdown, habitat models predict fish populations, and noise models predict sound levels at homes. Where models are weak, as for many ecological effects, assessments rely on studies of similar projects and expert judgment, and say so. Uncertainty is stated openly, and follow-up monitoring is designed to catch predictions that turn out wrong.

Significance is judged with criteria such as magnitude (how big the change is), geographic extent, duration, frequency, reversibility and the sensitivity or ecological and social context of the receiving environment. Many assessments organize the results in an interaction matrix, an approach that goes back to Luna Leopold's 1971 matrix, with project activities as rows and environmental components as columns. Scoring each interaction makes the reasoning transparent and lets reviewers see which assumptions drive the conclusions.

Worked problem

Scoring residual effects

Nadia scores each residual effect from 1 (low) to 3 (high) for magnitude, extent, duration and reversibility, multiplies the four scores and calls a product of 24 or more potentially significant. Loss of wooded habitat in the flooded area scores magnitude 2, extent 1, duration 3, reversibility 3. Construction dust at nearby farms scores 1, 1, 1, 1. Which is potentially significant?

Show solution
  1. \[\text{Habitat loss: } 2 \times 1 \times 3 \times 3 = 18\]
  2. \[\text{Construction dust: } 1 \times 1 \times 1 \times 1 = 1\]

Answer: Neither reaches the threshold of 24 under this scheme, but habitat loss, which is permanent and irreversible, comes close and deserves offsetting habitat elsewhere. Simple scores like these organize the discussion; they do not replace judgment, and changing the threshold or the scoring can change the answer, which is why the method and its sensitivity must be reported.

A residual effects matrix scored at two thresholds. Changing the threshold changes which effects are flagged, so the method must be reported.
# Residual effects matrix for the intake and reservoir: product of four 1-3 scores
effects = {   # magnitude, extent, duration, reversibility
    "Wooded habitat flooded":       (2, 1, 3, 3),
    "Fish entrainment at intake":   (2, 2, 3, 2),
    "Downstream low-flow reduction":(2, 2, 2, 1),
    "Reservoir mercury in fish":    (2, 1, 3, 2),
    "Construction dust and noise":  (1, 1, 1, 1),
    "Archaeological sites":         (3, 1, 3, 3),
}
for threshold in (24, 18):
    print(f"Threshold {threshold}:")
    for name, s in sorted(effects.items(), key=lambda kv: -kv[1][0]*kv[1][1]*kv[1][2]*kv[1][3]):
        p = s[0] * s[1] * s[2] * s[3]
        print(f"  {name:31s} score {p:2d}  {'POTENTIALLY SIGNIFICANT' if p >= threshold else ''}")
Output
Threshold 24:
  Archaeological sites            score 27  POTENTIALLY SIGNIFICANT
  Fish entrainment at intake      score 24  POTENTIALLY SIGNIFICANT
  Wooded habitat flooded          score 18  
  Reservoir mercury in fish       score 12  
  Downstream low-flow reduction   score  8  
  Construction dust and noise     score  1  
Threshold 18:
  Archaeological sites            score 27  POTENTIALLY SIGNIFICANT
  Fish entrainment at intake      score 24  POTENTIALLY SIGNIFICANT
  Wooded habitat flooded          score 18  POTENTIALLY SIGNIFICANT
  Reservoir mercury in fish       score 12  
  Downstream low-flow reduction   score  8  
  Construction dust and noise     score  1

With the threshold at 24, only archaeological sites and fish entrainment are flagged; at 18, habitat loss is flagged too. The results point Nadia's team to the mitigation that matters most: a careful archaeological survey before flooding, an intake screen sized for slow approach velocities so that small fish can swim away, and habitat offsets. The matrix also reminds the team of reservoir mercury: flooding soil and vegetation releases mercury that bacteria convert to methylmercury, which accumulates in fish for years after a reservoir fills, a well-documented effect of reservoirs in Canada and the northern United States.

Public participation and Indigenous peoples

Assessment is a public process. Proponents and agencies hold open houses, publish documents and invite comments, and the best assessments change the project in response. In Canada, the Crown has a constitutional duty to consult, and where appropriate accommodate, Indigenous peoples when its decisions may adversely affect Aboriginal or treaty rights, recognized and affirmed by section 35 of the Constitution Act, 1982. The Impact Assessment Act requires consideration of impacts on Indigenous peoples and their rights and of Indigenous knowledge, and federal law commits to implementing the United Nations Declaration on the Rights of Indigenous Peoples. For the intake and reservoir, which lie within Treaty 2 territory, the province and the city engage the First Nations and the Métis community whose members use the river and the coulee.

Engineers contribute to assessment as authors of technical chapters, as designers of mitigation, and as people who explain technical results clearly to non-specialists. A well-run assessment is not an obstacle to good projects; it is how good projects are found and bad ones are improved or stopped before money and trust are spent.

Common mistakes

  • MistakeTreating the assessment as paperwork done after the design is fixed.

    InsteadStart the assessment early so alternatives and mitigation can still change the design.

  • MistakeIgnoring cumulative effects because the project's own effect is small.

    InsteadAssess the project together with other past, present and foreseeable activities in the same area.

  • MistakeRelying on rules or guidance that have since changed.

    InsteadFederal processes in both countries changed between 2023 and 2026; check the current law and the lead agency's procedures at project start.

  • MistakeReporting a significance conclusion without the criteria behind it.

    InsteadState the criteria, thresholds and uncertainty so reviewers can follow the reasoning.

Summary and key terms

  • Environmental assessment predicts effects, compares alternatives, designs mitigation and informs decisions before a project is built.
  • Steps include screening, scoping, baseline, prediction, mitigation, significance, alternatives, decision and follow-up; cumulative effects must be included.
  • The federal Impact Assessment Act was amended in June 2024 after the 2023 Supreme Court reference to focus on adverse effects within federal jurisdiction; provinces license most projects.
  • Water projects need several other approvals, such as fish habitat, wetland, water rights, species and heritage permits.
  • Significance is judged by magnitude, extent, duration, reversibility and context, often with an interaction matrix.
  • Public participation and consultation with Indigenous peoples are central to the process.
Environmental assessment
A process for predicting and evaluating the effects of a proposed project before decisions are made.
Scoping
Identifying the issues, valued components and boundaries an assessment will address.
Valued component
An environmental, social or cultural element considered important enough to assess.
Mitigation
Measures to avoid, reduce or offset adverse effects.
Residual effect
An effect that remains after mitigation.
Cumulative effects
Combined effects of a project with other past, present and foreseeable activities.
Finding of no significant impact
A NEPA document concluding that an action will not significantly affect the environment.
Follow-up program
Monitoring after approval to check predictions and the effectiveness of mitigation.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. Why is a no-project alternative included in an assessment?

    Show answer

    It provides the baseline against which the project's effects and benefits are judged.

  2. Give an example of a cumulative effect for a river.

    Show answer

    Several outfalls, each acceptable alone, together lowering dissolved oxygen below the objective.

  3. An effect scores magnitude 3, extent 2, duration 2, reversibility 2. Is it potentially significant with a threshold of 24?

    Show answer

    \(3 \times 2 \times 2 \times 2 = 24\), so yes.

  4. Why does a new reservoir often raise mercury in fish?

    Show answer

    Flooded soil and vegetation release mercury that bacteria convert to methylmercury, which accumulates in fish.

  5. What is the difference between mitigation and a residual effect?

    Show answer

    Mitigation reduces an effect; the residual effect is what remains afterward.

  6. Why should engineers check the current law at the start of every assessment?

    Show answer

    Federal assessment law and procedures in both countries changed substantially between 2023 and 2026 and may change again.

Lesson quiz · 5 questions

Score 60% or more to complete this lesson.

Take the quiz