MSBA-263 · Lesson 12 of 12 · 18 min

Case study: rolling out Power BI to a department

▶ Video coming soon A video version of this lesson is on the way.

In early November 2026, Octavia Brenner-Lau, Lumenvale's facilities operations manager, asked for something the facilities office had never had: a reliable picture of building inspections, maintenance work orders and energy use across the three campuses, available to her supervisors every morning. The inspection data already lived in Dataverse, in the facilities solution Signe had designed (MSBA-250), and work orders were in the Facilities Work Orders solution (MSBA-251). Energy readings came from the building management system, which stored them in a SQL Server database in the data center. Rupert asked Kwabena to lead the rollout as a pilot of the college's new Power BI process, and to write it up so other departments could follow it.

This capstone follows that rollout from request to the first month of use. It brings together every lesson in the course. Read each stage, decide what you would do, then compare with the team's decisions.

A timeline of the facilities rollout from early November to November 20, 2026, with seven stages: requirements, workspaces and roles, security and labels, refresh and gateway, pipeline release, app and distribution, and monitoring. Each stage has a short label beneath it.
The facilities rollout in seven stages, from requirements in early November to the first review on November 20, 2026.

Stage 1: requirements

Kwabena met Octavia, her three campus supervisors and Delphine Okoro-Vance, the facilities coordinator, for an hour. He asked his usual questions: who will read this, what decisions will they make, how fresh must the data be, how sensitive is it, and who will own it. The answers shaped everything after.

QuestionAnswer
ReadersOctavia; three campus supervisors; about twelve maintenance leads; the vice-president, finance and administration, monthly
DecisionsWhich inspection findings to fix first; whether work orders are overdue; where energy use is rising
FreshnessInspections and work orders by 7:00 each morning; energy readings hourly would be nice, daily is enough
SensitivityMostly internal; injury details in some findings are confidential and already secured in Dataverse
OwnershipDelphine owns the report content; Kwabena builds and supports the first version
AccessEach campus supervisor sees their campus; Octavia and the maintenance leads see all three

Decision. One semantic model, *Facilities Operations*, with Dataverse tables for inspections and work orders and a SQL Server table for daily energy totals; one report with an overview and three detail pages; a dashboard for Octavia with alertable tiles; and an app with two audiences. Injury details are excluded from the model altogether, because no report needs them.

Stage 2: workspaces and roles

Following the Student Success pattern, Kwabena created three workspaces: Facilities [Dev], Facilities [Test] and Facilities Analytics, all on Lumenvale's Fabric capacity so the pipeline could run. Each had two admins, Kwabena and Delphine, and a contact list including the facilities shared mailbox. Signe was a Contributor in development only. Nobody else had a workspace role; readers would use the app. All role assignments except the admins went to security groups.

Why not one workspace? The supervisors would start using the report while it was still changing. Separate stages let Kwabena keep improving it without readers seeing half-finished work.

Stage 3: security and labels

Row-level security used the same dynamic pattern as Student Success. A small Access table, maintained by Delphine in a SharePoint list, mapped each supervisor's email to a campus, and Octavia and the maintenance leads to all campuses. The role filter used USERPRINCIPALNAME() on the Access table, and the relationship to the Campus table applied the security filter in both directions. Kwabena tested the role in Desktop with View as for each supervisor, for a maintenance lead and for a user with no row, who correctly saw nothing.

The model was labeled *General*, Lumenvale's label for internal information, because injury details had been left out; Dr. Ondaatje-Ruiz from the privacy office agreed in a five-minute review. The report inherited the label. The model was promoted once stable; certification would wait until it had run for a term.

Stage 4: refresh and gateway

The Dataverse and SharePoint sources were cloud sources and needed no gateway. The energy database was on premises, so Rupert's team created a connection on the standard gateway cluster, with Kwabena as a User. Kwabena's Power Query used parameters for the energy server and database names, matching the connection exactly.

Refresh was scheduled at 5:30 a.m. and 12:30 p.m. on weekdays, with failure notifications to the facilities mailbox and Kwabena. The energy table had three years of daily totals, so Kwabena set an incremental refresh policy: archive three years, refresh the last seven days, with detect data changes on the system's last-updated column. On the capacity he could have scheduled refresh far more often, but daily was what the readers needed, and more refreshes would only have consumed capacity.

Stage 5: release through the pipeline

Kwabena created a deployment pipeline for the three workspaces, deployed to test, and set parameter rules so test used the energy system's test database and production used the live one. Delphine and one supervisor reviewed the report in test for two days and found two problems: a work order status that the report treated as open but facilities treated as closed, and a confusing chart title. Both were fixed in development, compared, and deployed again to test. On November 12, 2026, Kwabena deployed to production and recorded the release on the governance site.

Stage 6: app, dashboard and distribution

In the production workspace Kwabena pinned four tiles to a *Facilities overview* dashboard: open high-priority findings, overdue work orders, inspections completed this month and energy use against last year. He then created the Facilities app with two audiences. *Campus Supervisors* saw the report; *Facilities Leadership*, which included Octavia and the maintenance leads, saw the report and the dashboard. Build permission was not granted to app users.

Distribution followed the readers' habits. The app was added as a tab in the facilities team's Teams channel. Octavia set a data alert on the overdue work orders tile, above 25, at most once a day, connected by Signe to a Power Automate flow that posted to the channel. Each supervisor created their own Monday subscription to the overview page, so it showed their own campus. The vice-president received a monthly subscription to the overview with the full report as PDF, created by Kwabena after confirming she had access through the Leadership audience.

Stage 7: monitoring and the first review

On November 20, 2026, eight days after release, Kwabena and Delphine reviewed the first week. The usage metrics showed eleven of the fifteen readers had opened the app, most through Teams on Monday and Tuesday mornings. The energy page had few views; supervisors said they looked at energy monthly, not daily, so Delphine planned to move it to the monthly subscription. Refresh history showed every refresh had succeeded; one had taken longer during the gateway's monthly update, which the cluster absorbed. The overdue alert had fired once, on November 17, and the work orders in question were cleared that day. Four readers had not opened the app at all; Delphine planned a ten-minute walkthrough at the next supervisors' meeting.

The rollout checklist

Kwabena turned the rollout into a checklist that Rupert published for every department.

AreaChecklist itemLesson
RequirementsReaders, decisions, freshness, sensitivity, owner and access rules agreed12
WorkspacesDev, test and production workspaces; two admins; contact list; groups for roles1
PublishingPublish to development only; replace, never delete and republish2
PermissionsReaders through the app; Build granted deliberately; dynamic row-level security tested3
RefreshCredentials set; schedule matched to need; failure contacts; incremental refresh for large tables4
GatewayGateway connections only for on-premises sources; names match; standard-mode cluster5
ReleasePipeline with parameter rules; compare before deploying; review in test6
Labels and trustSensitivity label on the model; promote when stable; certify through the process7
MonitoringUsage, refresh and performance reviewed after one week and monthly8
CapacityWorkspace license mode chosen for features and readers' licenses9
DeliveryApp with audiences; Teams; subscriptions and alerts where readers want them2, 10
SupportTroubleshooting log and a named owner for the content11

Your turn

The registrar's office wants a similar rollout for a Registration Operations report: daily registration counts by program, holds that block registration, and waitlists, with data from the student information system (on premises) and Maribeth's official program list (SharePoint Online). Advisers on each campus should see their campus; the registrar's team should see all. Registration week needs updates every hour from 8:00 a.m. to 6:00 p.m. Holds include confidential financial information.

Worked problem

Planning the Registration Operations rollout

Using the checklist, outline the key decisions for the Registration Operations rollout: workspaces and license mode, gateway needs, refresh, security, labels and distribution.

Show solution
  1. Workspaces: Registration [Dev], [Test] and Registration Operations on the Fabric capacity, because hourly refresh during registration week exceeds Pro's eight a day and the pipeline needs capacity.
  2. Gateway: a connection on the standard cluster for the student information system; none for the SharePoint Online program list.
  3. Refresh: hourly from 8:00 a.m. to 6:00 p.m. during registration week, then twice daily; incremental refresh on the registration table if it is large; failure contacts set to the registrar's mailbox.
  4. Security: dynamic row-level security with an Access table by campus; registrar's team mapped to all campuses; tested with View as and Test as role.
  5. Labels: the model holds confidential hold details, so label it Confidential, or remove the financial details if advisers only need to know a hold exists.
  6. Distribution: an app with Advisers and Registrar audiences, a Teams tab, a dashboard alert on total holds, and subscriptions after each morning refresh.

Answer: Three capacity workspaces with a pipeline, one gateway connection, hourly refresh in registration week, dynamic campus security, a Confidential label (or a model without financial detail) and an app with two audiences. The checklist turns a new request into a familiar set of decisions.

Training and handover

A rollout is not complete until the people who will own the content can maintain it. In the days after release, Kwabena worked alongside Delphine on three tasks she would take over: updating the Access table in SharePoint when supervisors changed, reading refresh history and the failure emails, and updating the app after a change to the report. She shadowed one deployment through the pipeline and then ran the next herself, with Kwabena watching. Rupert added her to the Power BI builders group, and Kwabena planned to move himself from admin to Member of the facilities workspaces in December, once Delphine and her backup were confident as admins.

For readers, training was short and practical. The supervisors received a ten-minute walkthrough at their weekly meeting: how to open the app in Teams, how the campus filter worked, what the overdue tile meant, and how to subscribe to the overview page. A one-page guide on the report's help page covered the same points, along with a contact for questions. The four readers who had not opened the app in the first week were the main audience for the walkthrough.

Measuring success

Octavia had asked for a reliable picture available every morning, so success was measured against that: refreshes completed before 7:00 a.m. on every weekday, supervisors using the report each week, and high-priority inspection findings closed faster than before. The first two were visible in refresh history and usage metrics by the end of November. The third needed a term of history, and Delphine planned to compare the median days to close a high-priority finding in the winter term with the same period a year earlier, using the report itself. Agreeing these measures at the start meant the review in the spring could say whether the rollout had worked, not only whether it had been delivered.

Applying the checklist to other departments

Rupert's plan was to use the facilities rollout as the template for every department that asked for Power BI in 2027, starting with the registrar's office and the library. Each department would follow the same seven stages and the same checklist, with Kwabena or Signe as the first builder and a departmental owner trained to take over. The governance site gained a page for each rollout recording its requirements, workspaces, sources, security model, label, refresh schedule and review dates, so that anyone could see how each department's content was set up. The value of the process was less in any single decision than in making every decision deliberately, in the same order, and writing it down.

Common mistakes

  • MistakeStarting to build before agreeing readers, decisions, freshness and access.

    InsteadSettle requirements first; they decide workspaces, security, refresh and distribution.

  • MistakeIncluding sensitive columns because they might be useful.

    InsteadLeave out data no report needs; it simplifies labels and privacy review.

  • MistakeRefreshing more often than readers need because the capacity allows it.

    InsteadMatch refresh to the decisions; extra refreshes consume capacity.

  • MistakeReleasing directly to production for a pilot.

    InsteadUse the pipeline even for pilots; reviewers in test catch problems before readers do.

  • MistakeDeclaring the rollout done at release.

    InsteadReview usage, refresh and feedback after a week and then monthly.

Summary and key terms

  • Requirements about readers, decisions, freshness, sensitivity, ownership and access drive every later choice.
  • Separate development, test and production workspaces let content improve without disturbing readers.
  • Dynamic row-level security, labels and endorsement secure and signal the content.
  • Gateways are needed only for on-premises sources; refresh should match the readers' needs.
  • A deployment pipeline with rules and reviews makes releases safe.
  • Apps, Teams, subscriptions and alerts deliver content where readers work; monitoring keeps it useful.
Rollout
The planned introduction of reports and apps to a new group of readers.
Pilot
A first, limited rollout used to test a process before wider use.
Release record
A short note of what changed in each production deployment.
Access table
A table mapping users to the data they may see, used by dynamic row-level security.
Readiness review
A check of usage, refresh and feedback shortly after release.
Rollout checklist
A reusable list of the decisions and checks for each new deployment.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. Why did the facilities model not need a Confidential label?

    Show answer

    The injury details were excluded, so the model held only internal information, labeled General after a privacy review.

  2. Which facilities sources needed a gateway?

    Show answer

    Only the on-premises energy database; Dataverse and SharePoint Online are cloud sources.

  3. What did the first-week review change?

    Show answer

    The energy page moved to the monthly subscription, and supervisors who had not opened the app were offered a walkthrough.

Lesson quiz · 5 questions

Score 60% or more to complete this lesson.

Take the quiz