Sign in or create a free account to continue.

CON-310 · Lesson 3 of 12 · 28 min

Cost codes, WBS and the cost-loaded schedule

A cost code is the address of a cost. Every hour worked, every invoice paid and every dollar committed must be charged to one, so that actual cost can be compared with the budget line for the same work. The cost code structure therefore shapes everything else in the cost system: how fine the budget is, what the field has to record, what the reports can show, and how cost links to the schedule. This lesson explains how cost code structures are built, how they relate to the work breakdown structure (WBS), how much detail is enough, and how loading the budget onto the schedule produces the planned value curve that earned value analysis needs.

What a cost code identifies

Most contractor cost codes combine several pieces of information in one string. A typical structure has a job number, a work item based on a standard classification, sometimes a location or area, and a cost type.

Diagram breaking the cost code 2417-03 11 13.10-B2-L into four labeled parts: job number 2417, work item 03 11 13.10 from MasterFormat (slab edge forms), area B2 (building level 2) and cost type L (labor), with arrows to explanations.
Anatomy of a cost code: job, work item, area and cost type.
Common elements of a contractor cost code.
ElementPurposeExample
Job numberSeparates projects in the company ledger2417
Work itemIdentifies the work, usually from a standard classification03 11 13.10 Slab edge forms
Area or phase (optional)Separates locations, buildings, floors or phasesB2 = level 2
Cost typeLabor, material, equipment, subcontract or otherL

Standard classifications give the work item a meaning that is consistent across jobs. In North America the most widely used is MasterFormat, published by the Construction Specifications Institute (CSI) and Construction Specifications Canada (CSC), which organizes work by specification section into 50 divisions (the 2020 edition is the current base edition, with periodic updates). UNIFORMAT II, which organizes cost by building element (substructure, shell, interiors, services), is common in early estimates and owner cost plans. Many contractors use a simplified, company-specific version of MasterFormat so that codes stay short and familiar to the field.

Classification systems used for cost codes.
ClassificationOrganized byTypical use in cost control
MasterFormat (CSI and CSC)Work result and specification sectionContractor cost codes, subcontract packages
UNIFORMAT II (ASTM E1557)Building system or elementOwner cost plans, conceptual estimates, comparing projects
Company standard code listSimplified MasterFormat with company additionsDay-to-day field coding and historical cost database
Owner or program codesOwner-defined WBS, often by facility and systemRequired reporting on large owner programs

Cost codes and the work breakdown structure

The work breakdown structure is a hierarchical decomposition of the project scope into deliverables and work packages (CON-210 Lesson 2 used it to build the schedule). The cost code structure and the WBS answer different questions: the WBS asks what must be delivered, while cost codes ask what kind of work and cost it is. On many building projects the two are combined, with the WBS providing the upper levels (building, floor, system) and cost codes the lower levels (work item and cost type).

Where they meet, earned value practice uses the term control account: the point at which scope, schedule and budget are integrated and assigned to one responsible manager. On a contractor's building project, a control account might be 'level 2 structure' or 'concrete work, all levels', depending on how the work is managed. The important thing is that each control account has a defined scope, budget and schedule, and that actual cost is collected at the same level, so that planned value, earned value and actual cost can be compared like for like (Lesson 7).

How much detail is enough?

More cost codes give more information but cost more to run. Each code is something the foreman must choose on a timecard, the coordinator must allocate invoices to, and the cost engineer must report on. Too few codes hide problems: if all concrete labor is one code, a loss on formwork can be masked by a gain on finishing. Too many codes produce poor data: foremen faced with eighty codes guess, and the result is precise-looking nonsense.

Choosing the level of detail for self-performed cost codes.
Too coarseAbout rightToo fine
One code for all concrete laborSeparate codes for forming, reinforcing, placing and finishingSeparate codes for each footing and each pour
General conditions as one lineSupervision, offices, utilities, hoisting, cleanup, protectionEach temporary light and extension cord
Problems hidden by offsetting gainsEach code a distinct, measurable activity with its own crewField cannot code accurately; data unreliable

Useful tests for a self-performed labor code are: it covers work that one crew does as a distinct activity; it has a measurable quantity, so that progress and productivity can be tracked; and it is large enough to matter, perhaps more than a few hundred hours. Subcontract work usually needs only one code per subcontract, because the subcontractor tracks its own detail. Area codes are worth adding where locations are clearly separate and the work is repetitive, such as floors of a residential tower, because they let productivity be compared floor by floor.

Worked problem

Choosing codes for Riverbend Commons formwork

Northline's estimate carried 4,850 crew-hours of formwork for footings, walls, columns, elevated slabs and slab edges across four levels. Should the codes be by element, by level, or both?

Show solution
  1. By element only: 5 codes; productivity differs widely between walls and slabs, so element codes are needed.
  2. By level only: 4 codes; would mix very different activities.
  3. By element and level: up to 20 codes, but footings occur only at the foundation, so about 14 codes.
  4. Elevated slab forming repeats on three levels and is the largest item (about 1,900 hours), so tracking it by level shows the learning curve.

Answer: Use element codes for all formwork, and add level codes only for elevated slabs and columns, which repeat; about 11 codes in total, each large and measurable.

Cost codes in the field

Cost data are only as good as the coding at the source. Practical steps help. Print or display a short list of active codes for each crew, with plain descriptions, rather than the full company list. Close codes for work that is finished so that time cannot be charged to them. Have the superintendent review timecard coding daily or weekly while memories are fresh. Use mobile time-entry apps that show only the codes for the crew's current activities. And explain to foremen why coding matters; a foreman who sees the productivity report for his crew each week will code more carefully than one who never sees the results.

The cost-loaded schedule

A cost-loaded schedule assigns budget amounts to the activities in the project schedule. Because each activity has planned dates, the budget can then be spread over time, giving a planned value for each period and a cumulative curve. This curve, often called the S-curve because of its typical shape, is the baseline against which progress and cost are measured. It is also the starting point for the owner's cash flow forecast and the contractor's own cash planning (Lesson 11).

Activities can be cost loaded in several ways. Each activity can be assigned its own budget directly; or budget lines can be linked to activities, with one line spread over several activities or several lines combined into one activity. The spread within an activity is usually linear (equal amounts each day), but front-loaded or back-loaded spreads can be used where the work is not uniform, such as a mechanical package where equipment is delivered late in the activity.

# Cost-load a simplified Riverbend schedule and print monthly planned value (amounts $1000)
acts = [  # name, start month, duration (months), budget
    ("Site and foundations", 1, 3, 1_420), ("Structure L1-L4", 3, 5, 3_160),
    ("Envelope", 6, 5, 2_740), ("Mechanical and electrical", 5, 10, 3_310),
    ("Interiors", 8, 8, 2_880), ("General conditions", 1, 16, 1_904),
    ("Site works and close-out", 14, 3, 710),
]
months = 16
pv = [0.0] * (months + 1)
for name, start, dur, bud in acts:
    for m in range(start, start + dur):
        pv[m] += bud / dur                          # linear spread
cum = 0
for m in range(1, months + 1):
    cum += pv[m]
    bar = "#" * int(pv[m] / 40)
    print(f"Month {m:>2}: {pv[m]:7,.0f}  cumulative {cum:8,.0f}  {bar}")
Output
Month  1:     592  cumulative      592  ##############
Month  2:     592  cumulative    1,185  ##############
Month  3:   1,224  cumulative    2,409  ##############################
Month  4:     751  cumulative    3,160  ##################
Month  5:   1,082  cumulative    4,242  ###########################
Month  6:   1,630  cumulative    5,872  ########################################
Month  7:   1,630  cumulative    7,502  ########################################
Month  8:   1,358  cumulative    8,860  #################################
Month  9:   1,358  cumulative   10,218  #################################
Month 10:   1,358  cumulative   11,576  #################################
Month 11:     810  cumulative   12,386  ####################
Month 12:     810  cumulative   13,196  ####################
Month 13:     810  cumulative   14,006  ####################
Month 14:   1,047  cumulative   15,053  ##########################
Month 15:     716  cumulative   15,768  #################
Month 16:     356  cumulative   16,124  ########

The monthly amounts rise as more trades work at once and fall during close-out, so the cumulative curve is steep in the middle and flat at both ends. Comparing the budget total with the final cumulative value is a useful check that every dollar has been loaded onto an activity.

Combined chart with monthly planned value bars for 16 months rising to a peak around months 8 to 10 and falling after, and a cumulative planned value S-curve rising from zero to $16.1 million, labeled on the right axis.
Monthly and cumulative planned value from the cost-loaded schedule.

Pitfalls in cost loading

Cost-loaded schedules are powerful but easy to distort. The most common distortion is front-loading: assigning more value to early activities than they are worth so that early billings run ahead of cost. Owners and their consultants look for this, because it shifts cash and risk to the owner and leaves less money in the contract to finish the work if the contractor fails. A second pitfall is loading cost onto summary activities or milestones that do not represent real work, which makes the planned value curve meaningless. A third is failing to update the cost loading when the schedule is revised, so that planned value no longer matches the plan the team is actually following.

Many US owners, especially public agencies and the US Army Corps of Engineers, require a cost-loaded schedule in which each activity's cost forms the basis for progress payments. Specifications commonly prohibit front-loading and give the owner the right to reject an unbalanced cost loading (CON-220 Lesson 5).

Checks on a cost-loaded schedule.
CheckWhat it catches
Total cost loaded equals current budget (or contract value for billing)Missing or double-counted amounts
Cost per day of each activity is reasonable for its crew and materialsFront-loading and unbalanced loading
No cost on milestones or summary barsValue that cannot be earned by real work
Loading updated with each approved schedule revisionPlanned value that no longer reflects the plan
Cost-loaded activities map to control accountsInability to compare planned, earned and actual cost

Two baselines: cost and billing

Contractors often maintain two cost loadings. The owner-facing schedule of values loads the contract value (including fee and markups) onto activities or line items for billing. The internal control baseline loads the cost budget, so that planned value can be compared with actual cost. The two curves have similar shapes but different totals, and on a lump sum job only the internal one is shown in the cost report. Mixing them causes errors: comparing actual cost with planned value based on contract value overstates the apparent cost underrun by the amount of the fee.

Worked problem

Two curves for the same work

At the end of month 6, cumulative planned value based on the cost budget is $5.87 million. The contract value is 4.5 % above cost. What is the planned billing at the same date, assuming billing follows the same profile?

Show solution
  1. Planned billing = planned cost value × (1 + fee rate).
  2. 5.87 × 1.045 = $6.13 million.

Answer: About $6.13 million. If actual cost were compared with $6.13 million instead of $5.87 million, the job would look about $260,000 better than it is.

Common mistakes

  • MistakeMaking a cost code for every footing and every pour.

    InsteadMake each code a distinct, measurable activity large enough to matter, so the field can code accurately.

  • MistakeUsing one labor code for all concrete work.

    InsteadSeparate activities with different productivity, such as forming, reinforcing, placing and finishing.

  • MistakeGiving foremen the full company code list.

    InsteadShow each crew a short list of active codes and close codes when work is finished.

  • MistakeLoading cost onto milestones and summary bars.

    InsteadLoad cost only onto activities that represent real work.

  • MistakeFront-loading the schedule to improve early cash flow.

    InsteadLoad cost at its true value; owners check, and front-loading shifts risk unfairly.

  • MistakeComparing actual cost with planned value based on contract value.

    InsteadUse a cost-based baseline for cost control and a contract-value baseline for billing.

Summary and key terms

  • A cost code identifies the job, the work item, sometimes the area, and the cost type.
  • MasterFormat is the usual basis for contractor work item codes; UNIFORMAT II organizes cost by building element.
  • The WBS and cost codes combine at control accounts, where scope, schedule and budget meet under one manager.
  • Self-performed codes should be distinct, measurable and large enough to matter; subcontracts usually need one code each.
  • Good field coding needs short code lists, timely review and feedback to foremen.
  • A cost-loaded schedule spreads the budget over time to produce the planned value S-curve.
  • Avoid front-loading, cost on milestones and stale loadings, and keep cost and billing baselines separate.
Cost code
An identifier showing where a cost is charged: job, work item, area and cost type.
MasterFormat
The CSI and CSC classification of construction work by specification section.
UNIFORMAT II
A classification of building cost by element or system.
Work breakdown structure
A hierarchical decomposition of project scope into deliverables and work packages.
Control account
The point where scope, schedule and budget are integrated under one manager.
Cost-loaded schedule
A schedule in which activities carry budget amounts.
Planned value
The budgeted value of work scheduled to be done by a given date.
S-curve
The cumulative planned (or earned or actual) value plotted over time.
Front-loading
Assigning more value to early activities than they are worth.
Schedule of values
The breakdown of the contract price used for progress billing.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. Name the four common elements of a contractor cost code.

    Show answer

    Job number, work item, area or phase, cost type.

  2. What is the difference between MasterFormat and UNIFORMAT II?

    Show answer

    MasterFormat organizes by work result and specification section; UNIFORMAT II by building element or system.

  3. Give three tests for a good self-performed labor code.

    Show answer

    Distinct crew activity, measurable quantity, large enough to matter.

  4. Why do subcontracts usually need only one cost code each?

    Show answer

    The subcontractor tracks its own detail; the contractor controls the commitment and billings.

  5. An activity has a budget of $240,000 and a duration of 4 months with a linear spread. What is its monthly planned value?

    Show answer

    $60,000.

  6. What is front-loading and why do owners object to it?

    Show answer

    Assigning excess value to early work; it shifts cash and risk to the owner.

  7. What is a control account?

    Show answer

    The level at which scope, schedule and budget are integrated and assigned to one manager.

  8. Planned cost value is $4.2 million and the fee is 5 %. What is the planned billing on the same profile?

    Show answer

    $4.41 million.

  9. Why add area codes for elevated slabs in a multi-story building?

    Show answer

    To compare productivity floor by floor and see the learning curve.

  10. Name two checks on a cost-loaded schedule.

    Show answer

    Total equals budget, reasonable cost per day, no cost on milestones, updated with revisions, maps to control accounts.

Lesson quiz · 5 questions

Score 60% or more to complete this lesson.

Take the quiz