BLR-120 · Lesson 4 of 12 · 20 min

Mobile cranes and load charts

The reboiler shell will be lifted by a large all-terrain crane, a hydraulic crane on a multi-axle carrier that can drive on roads, set up on its outriggers and lift in all directions. The day before the lift, Wade Kozak sits down with Kiera and the crane company's lift engineer, Sunita Rao, and opens the crane's load chart. Kiera has seen small load charts in her core course. This one is a book: dozens of pages of tables for different boom lengths, counterweights, outrigger settings and jib configurations, with notes on every page. This lesson explains how mobile cranes carry a load, how to read a load chart properly, and why the radius is the number that matters most.

Types of mobile crane

Mobile cranes on industrial projects fall into a few families. Hydraulic cranes have a telescoping boom extended by hydraulic cylinders; they set up quickly and include all-terrain cranes, rough-terrain cranes for site work, truck cranes and boom trucks. Lattice boom cranes have a boom built from bolted or pinned steel lattice sections; they take longer to assemble but can carry far more at long radius, and the largest are crawler cranes, mounted on tracks, which are covered in lesson 5. Each family has its own load chart conventions, but they all answer the same question: how much can this crane lift, in this configuration, at this radius?

Mobile cranes used on industrial turnarounds.
CraneTypical use on a turnaroundSet up
Boom truckSmall loads, material handling, short radiusOutriggers, minutes
Rough-terrain hydraulicGeneral site lifts, valves, small exchangersOutriggers on site roads, minutes
All-terrain hydraulicExchangers, heads, reboilers, tailing small vesselsOutriggers, counterweight delivered by truck, hours
Lattice crawlerHeavy vessels, coker drums, reactors, long reachAssembled on site over days, travels on tracks

How a crane carries a load

A mobile crane is a lever balanced on a tipping line. On outriggers, the tipping line is the line between the two outrigger floats nearest the load; on tracks, it is the edge of the track. The load, acting at the end of the boom, tries to tip the crane forward over that line; the crane's own weight and counterweight, acting behind it, resist. As the radius grows, the load's lever arm grows and the capacity falls. A crane can fail in two ways: it can tip over, when the load's moment exceeds the crane's resisting moment, or it can break, when a part of the boom, the boom hoist, the outriggers or the slewing ring is overloaded.

Load charts include both limits. At short radius, the chart values are set by the strength of the crane's structure, and an overload can break the boom or the outriggers without any sign of tipping. At long radius, the chart values are set by stability, typically as a fixed percentage of the load that would tip the crane: for most mobile cranes on outriggers, the chart is set at no more than 85 percent of the tipping load, and for crawlers at no more than 75 percent. Many charts shade the structural region or mark it with a line or asterisks. An operator who relies on the feeling that the crane is starting to get light is relying on the stability limit, and in the structural region there is no such warning.

Side view of a hydraulic crane on outriggers lifting a load. The radius is shown as the horizontal distance from the center of rotation to the center of the hook. The tipping line through the front outrigger floats is marked, and the load's moment arm and the counterweight's arm are shown on either side of it.
Radius is measured horizontally from the center of rotation to the load line. The load tips the crane about the outrigger floats.

Radius and boom length

Radius is the horizontal distance from the crane's center of rotation to the center of the hook, with the load suspended. It is not the boom length and not the distance from the edge of the crane. When a load is lifted, the boom deflects and stretches under the weight, and the radius grows. On a hydraulic crane with a long boom, the radius can increase by several percent as the load comes off the ground, and the planned radius must allow for it. The radius also grows if the load swings out, if the operator booms down, or if the load is set at a point farther away than planned.

Boom length and boom angle are related to radius but are not the same. For a given boom length, raising the boom angle shortens the radius; for a given angle, a longer boom has a longer radius and a lower capacity, because the boom's own weight is carried farther out. Many charts are organized by boom length across the top and radius down the side; some show boom angle as well. The operator's computer, the rated capacity limiter or load moment indicator, calculates the radius and the percentage of capacity continuously, but it does so from the configuration the operator has entered, and it is only as good as that entry.

Reading a load chart

A load chart is valid only for the exact configuration it describes. Before reading any number, the operator and the lift planner confirm the counterweight installed, the outrigger extension (fully extended, intermediate or retracted), the working area (over the rear, over the side or 360 degrees), the boom length, any jib or extension stowed or erected, and the number of parts of line reeved on the hook block. Change any of these, and the chart page changes.

Three rules apply to every chart. First, never interpolate between values: if the radius falls between two lines on the chart, use the capacity at the next longer radius, and if the boom length falls between two columns, use the next longer boom. Second, chart values are gross capacities, which include everything below the boom tip: the hook block, the overhaul ball, slings, shackles, spreader bars and lifting beams, and allowances for any jib that is stowed on the boom or erected. These are deducted to find what is left for the load. Third, the notes on the chart are part of the chart. They set wind limits, ground conditions, levelness, and the conditions in which capacities must be reduced. OSHA's crane rules require the load chart to be in the cab and the crane to be operated within it.

For the reboiler shell, the crane will be set up with a 130 ft boom, full counterweight and outriggers fully extended, working 360 degrees. The planned radius at the set is 43 ft. The chart excerpt below is illustrative; it is not from a real crane.

A load chart excerpt showing one boom length column with gross capacities by radius, the planned radius falling between two chart lines with an arrow to the next longer radius, and a list of deductions for the hook block, rigging and stowed jib below.
Reading a chart: use the next longer radius, then deduct everything below the boom tip.
# Net capacity from a load chart (US units; chart values are illustrative, not from a real crane)
# gross capacity by radius for one configuration: 130 ft main boom, full counterweight, outriggers fully extended, 360 deg
chart = {35: 216_000, 40: 190_000, 45: 173_100, 50: 155_000, 55: 138_500, 60: 123_000, 65: 109_000, 70: 97_000}
deduct = {"hook block": 4_850, "slings and shackles": 2_400, "stowed jib allowance": 3_300}
load = 90_400
radius = 43
# never interpolate: use the next longer radius on the chart
r_used = min(r for r in chart if r >= radius)
gross = chart[r_used]
net = gross - sum(deduct.values())
total = load + sum(deduct.values())
print(f"planned radius {radius} ft -> read the chart at {r_used} ft: gross capacity {gross:,} lb")
for k, v in deduct.items():
    print(f"  deduct {k:<22} {v:>7,} lb")
print(f"net capacity for the load {net:,} lb; load {load:,} lb")
print(f"total lifted {total:,} lb = {100 * total / gross:.1f} % of the gross chart value")
for r in sorted(chart):
    if r >= radius:
        print(f"  if the radius grows to {r:>3} ft: {100 * total / chart[r]:5.1f} %")
Output
planned radius 43 ft -> read the chart at 45 ft: gross capacity 173,100 lb
  deduct hook block               4,850 lb
  deduct slings and shackles      2,400 lb
  deduct stowed jib allowance     3,300 lb
net capacity for the load 162,550 lb; load 90,400 lb
total lifted 100,950 lb = 58.3 % of the gross chart value
  if the radius grows to  45 ft:  58.3 %
  if the radius grows to  50 ft:  65.1 %
  if the radius grows to  55 ft:  72.9 %
  if the radius grows to  60 ft:  82.1 %
  if the radius grows to  65 ft:  92.6 %
  if the radius grows to  70 ft: 104.1 %

The radius of 43 ft falls between the 40 ft and 45 ft lines, so the chart is read at 45 ft, giving 173,100 lb gross. After the deductions, the crane can lift 162,550 lb of load, and the total lifted, 100,950 lb, is 58.3 percent of the chart. That looks comfortable. The table of growing radius shows why the radius matters: if the load were set or swung 15 to 25 ft farther out than planned, the lift would pass 75 percent by 60 ft and exceed the crane's chart at 70 ft. Wade marks the maximum allowed radius on the lift plan as 50 ft, with the set point marked on the ground, and the crane is positioned so that the swing from the truck to the saddles never takes the radius beyond it.

Parts of line and the hook block

The crane's chart gives the capacity of the crane's structure and stability, but the hoist rope has its own limit. Each part of line, each fall of rope between the boom tip sheaves and the hook block, can carry only so much, and the hook block is reeved with enough parts that the load per part stays within the rope's rating. The chart's notes give the line pull per part and the number of parts needed for a given load. A hook block reeved with too few parts can be overloaded even when the crane itself is well within its chart; a block reeved with more parts than needed is slower and heavier. The block's own capacity, stamped on it, must also equal or exceed the load.

For the reboiler shell, the hook block is reeved with six parts of line; at the chart's allowable line pull of 18,000 lb per part, that is 108,000 lb, enough for the 101,000 lb total.

Working area and outriggers

Many cranes are not equally strong in every direction. A crane on outriggers is most stable over the rear, where the counterweight is, and least stable over the front or side, depending on the carrier. Charts give separate capacities for different working areas, or a 360-degree chart that applies everywhere. Outriggers set at intermediate extension reduce capacity sharply, and some modern cranes allow different extensions on each side, with the crane's computer limiting capacity as it slews. A lift that passes through a weak area on its way to the set must be checked at the worst point, not only at the pick and the set.

The crane must also be level. Load charts assume the crane is level within a small tolerance, often 1 percent, and a crane that is out of level loses capacity rapidly because the load swings outward and the radius grows on the downhill side. Before every lift, the operator checks the level indicator, and the riggers check that the outrigger floats and mats have not settled.

Rated capacity limiters

Modern cranes have a rated capacity limiter, also called a load moment indicator, that measures the load, boom length and angle and compares the load with the chart for the configuration entered. It warns the operator as the load approaches the chart and, on most cranes, stops motions that would increase the load moment. The limiter is a valuable safety device, but it is not a substitute for planning. It does not know if the configuration entered is wrong, if the ground is soft, if the wind is strong, or if the rigging weighs more than assumed. OSHA's crane rules require a working load moment indicator or rated capacity limiter on most cranes and set out what to do if one fails during work.

Worked problem

Net capacity for a top head lift

A crane will lift a coker drum top head at a radius of 68 ft. The chart, for the configuration in use, gives 116,000 lb at 70 ft and 128,000 lb at 65 ft. The hook block weighs 3,100 lb and the rigging 1,300 lb. The head weighs 52,900 lb. What percentage of chart is the lift?

Show solution
  1. The radius falls between chart lines; use the next longer radius: 70 ft, 116,000 lb.
  2. Total lifted: 52,900 + 3,100 + 1,300 = 57,300 lb.
  3. Percentage of chart: 57,300 / 116,000 = 49.4 percent.
  4. The lift is under half of the chart at the planned radius, but the planned radius must allow for boom deflection and any swing.

Answer: About 50 percent of chart. Had the planner interpolated or used the shorter radius, the margin would look larger than it is.

Common mistakes

  • MistakeInterpolating between chart values.

    InsteadUse the next longer radius and the next longer boom.

  • MistakeTreating the chart value as the load the crane can lift.

    InsteadDeduct the hook block, rigging, beams and jib allowances first.

  • MistakeMeasuring radius from the edge of the crane or along the boom.

    InsteadRadius is horizontal, from the center of rotation to the load line.

  • MistakeRelying on the crane getting light as a warning.

    InsteadIn the structural region the crane can fail without any sign of tipping.

  • MistakeTrusting the rated capacity limiter over the plan.

    InsteadThe limiter only knows the configuration entered; the plan must be right first.

Summary and key terms

  • Hydraulic cranes include boom trucks, rough-terrain and all-terrain cranes; lattice crawlers handle the heaviest loads.
  • A crane can fail by tipping or by structural overload; charts include both limits.
  • Radius is the horizontal distance from the center of rotation to the load line, and it grows as the load is lifted.
  • Use the chart for the exact configuration, never interpolate, and deduct everything below the boom tip.
  • Check the parts of line, the hook block rating, the working area, the outriggers and the crane's levelness.
  • The rated capacity limiter helps but does not replace the plan.
Radius
The horizontal distance from the crane's center of rotation to the center of the hook with the load suspended.
Gross capacity
The chart value, which includes everything below the boom tip.
Net capacity
Gross capacity less the hook block, rigging and other deductions; what is left for the load.
Tipping line
The line about which a crane would tip, through the outrigger floats or track edge nearest the load.
Parts of line
The number of falls of hoist rope between the boom tip and the hook block.
Rated capacity limiter
A system that measures the load and boom position and warns or stops the crane near its chart.

Practice problems

Work each problem on paper first, then reveal the answer to check.

  1. The planned radius is 55 ft. The chart gives values at 50 ft and 60 ft. Which do you use?

    Show answer

    The 60 ft value, the next longer radius.

  2. A chart gives 66,000 lb at the radius. The block weighs 2,000 lb and the rigging 900 lb. What net capacity is left for the load?

    Show answer

    66,000 − 2,000 − 900 = 63,100 lb.

  3. Why must the radius allow for the lift itself?

    Show answer

    The boom deflects under load and the load may swing, so the radius grows.

  4. What is the difference between the structural and stability regions of a chart?

    Show answer

    At short radius the structure limits capacity; at long radius stability does.